Thames Tideway Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (406)

Acceptance (28)

Pre Examination (59)

Examination (1978)

Decision (41)

Decided (93)

Date

SourceDescription
Other
Thames Water Utilities Limited (PDF, 179 KB)
APP59.22.03 SUPPORTING APPENDIX Inefficiency of Barging at Abbey Mills
Other
David Starkie on behalf of Elm Quay Court (PDF, 12 KB)
Other
Lise Frandsen (PDF, 36 KB)
Late submission accepted for the 13 January deadline
Other
Unity Harvey (PDF, 1 MB)
Received on time for 13 January deadline
Other
Mayor for London (PDF, 83 KB)
Late submission for the 13 January Deadline
Other
Ranelagh Sailing Club (PDF, 43 KB)
Submission for the 13 January deadline
Other
Derek Joseph on behalf of Tempus Wharf Freehold Ltd (PDF, 838 KB)
Submission for the 13 January deadline
Other
City of London (PDF, 1 MB)
Draft Statement of Common Ground in relation to Blackfriars Bridge Foreshore dated 13 January 2014
Other
City of London Corporation (PDF, 23 KB)
Other
David Percival (PDF, 15 KB)
Other
English Heritage (PDF, 2 MB)
Other
Environment Agency (PDF, 309 KB)
Other
Graham Stevens (PDF, 302 KB)
Late submission for the 13 January deadline
Other
Juliet Munn on behalf of Battersea Power Station Development Company (PDF, 750 KB)
Other
London Borough of Lambeth (PDF, 19 KB)
Other
London Borough of Lewisham (PDF, 28 KB)
Other
London Borough of Richmond Upon Thames (PDF, 23 KB)
Other
London Borough of Southwark (PDF, 3 MB)
Second Statement of Common Ground - Chambers Wharf, Shad Thames Pumping Station, Earl Pumping Station and Blackfriars Bridge Foreshore submitted for the deadline of 13 January 2014
Other
London Borough of Southwark (PDF, 130 KB)
Other
London Borough of Tower Hamlets (PDF, 884 KB)
Second Statement of Common Ground - King Edward Memorial Park Foreshore and Bekesbourne Street - Late submission for the 13 January deadline
Other
London Borough of Wandsworth (PDF, 141 KB)
Other
London Borough of Westminster (PDF, 289 KB)
Other
Mayor of London (PDF, 47 KB)
Other
Minerva Wandsworth Limited (PDF, 772 KB)
Other
MMO (PDF, 127 KB)
Other
National Grid Gas Plc and National Grid Electricity Plc (PDF, 482 KB)
Other
Natural England (PDF, 74 KB)
Other
Open Spaces Society (PDF, 44 KB)
Late Submission for 13 January deadline
Other
Port of London Authority (PDF, 541 KB)
Other
St Paul's Church (PDF, 21 KB)
Other
Stuart Tyler (PDF, 834 KB)
Other
Thames Water (PDF, 470 KB)
Statement of Common Ground- Natural England
Other
Thamesbank (PDF, 4 MB)
Other
Transport for London (PDF, 132 KB)
Other
Duncan Rimmer (PDF, 13 KB)
Submission for the 13 January deadline
Other
London Duck Tours (PDF, 133 KB)
Email from London Duck Tours to the Planning Inspectorate dated 13 January 2014 - comments and amendments on the Statement of Common Ground
Other
Mayor of London (PDF, 108 KB)
Second Statement of Common Ground submitted for the deadline of 13 January 2014
Other
Thames Water (PDF, 507 KB)
APP72.11 Code of Construction Practice Part B Site Specific Requirements - Chelsea Embankment Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 886 KB)
APP63 Thames Water Water Quality and Resources
Other
Thames Water (PDF, 1 MB)
APP72.1 Code of Construction Practice Part A General Requirements - Comparite against 28 February 2013
Other
Thames Water (PDF, 2 MB)
APP59 Thames Water Rationale for the Selection of Work Sites and Drive Strategies
Other
Thames Water (PDF, 629 KB)
APP72.12 Code of Construction Practice Part B Site Specific Requirements - Kirtling Street (Comparite against 23 September 2013)
Other
Thames Water (PDF, 887 KB)
APP72.20 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 1 MB)
APP72.16 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 882 KB)
APP72.7 Code of Construction Practice Part B Site Specific Requirements - King George's Park (Comparite against 28 February 2013)
Other
Thames Water (PDF, 891 KB)
APP72.3 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 47 MB)
APP65 Book of Plans - Revised Drawings - Part 2 of 3
Other
Thames Water (PDF, 150 KB)
APP64.1 Thames Water Additional Statement of Common Ground Request - LB Southwark, LB Newham, PLA and Thames Tideway Tunnel
Other
Thames Water (PDF, 451 KB)
APP72.12 Code of Construction Practice Part B Site Specific Requirements - Kirtling Street (Revised 13 January 2014)
Other
Thames Water (PDF, 45 MB)
APP65 Book of Plans - Revised Drawings - Part 1 of 3
Other
Thames Water (PDF, 520 KB)
APP72.23 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 539 KB)
APP72.9 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 913 KB)
APP72.21 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street (Comparite against 28 February 2013)
Other
Thames Water (PDF, 891 KB)
APP72.3 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 767 KB)
APP72.11 Code of Construction Practice Part B Site Specific Requirements - Chelsea Embankment Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 446 KB)
APP69 Exceptional Hardship Procedure
Other
Thames Water (PDF, 548 KB)
APP72.4 Code of Construction Practice Part B Site Specific Requirements - Barn Elms (Revised 13 January 2014)
Other
Thames Water (PDF, 243 KB)
APP64.2 Thames Water Additional Statement of Common Ground Request - Thames Tideway Tunnel and Cory Environmental and PLA
Other
Thames Water (PDF, 914 KB)
APP72.21 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street (Comparite against 23 September 2013)
Other
Thames Water (PDF, 881 KB)
APP72.7 Code of Construction Practice Part B Site Specific Requirements - King George's Park (Comparite against 23 September 2013)
Other
Thames Water (PDF, 859 KB)
APP72.6 Code of Construction Practice Part B Site Specific Requirements - Dormay Street (Comparite against 23 September 2013)
Other
Thames Water (PDF, 766 KB)
APP72.11 Code of Construction Practice Part B Site Specific Requirements - Chelsea Embankment Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 805 KB)
APP73 Transport Strategy
Other
Thames Water (PDF, 564 KB)
APP72.3 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 475 KB)
APP72.13 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 801 KB)
APP72.23 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 771 KB)
APP72.17 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 515 KB)
APP59.22.04 SUPPORTING APPENDIX Profile of Movements at Chambers Wharf
Other
Thames Water (PDF, 3 MB)
APP59.07.01 SUPPORTING APPENDIX Chambers Wharf plans and construction verifiable photomontages
Other
Thames Water (PDF, 1 MB)
APP72.16 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 860 KB)
APP72.6 Code of Construction Practice Part B Site Specific Requirements - Dormay Street (Comparite against 28 February 2013)
Other
Thames Water (PDF, 3 MB)
APP77 Equalities Impact Assessment - 13 January 2014
Other
Thames Water (PDF, 567 KB)
APP72.5 Code of Construction Practice Part B Site Specific Requirements - Putney Embankment Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 770 KB)
APP72.19 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 628 KB)
APP72.12 Code of Construction Practice Part B Site Specific Requirements - Kirtling Street (Comparite against 28 February 2013)
Other
Thames Water (PDF, 273 KB)
APP86 Update on Actions from Compulsory Acquisition Hearings
Other
Thames Water (PDF, 33 KB)
APP78.3 Book of Reference - 13 January 2014 - City of London
Other
Thames Water (PDF, 28 MB)
APP74 Draft s106 Legal Agreements
Other
Thames Water (PDF, 550 KB)
APP72.6 Code of Construction Practice Part B Site Specific Requirements - Dormay Street (Revised 13 January 2014)
Other
Thames Water (PDF, 562 KB)
APP76.3 Design Principles - Comparite against 28 February 2013
Other
Thames Water (PDF, 513 KB)
APP72.19 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 1 MB)
APP84 The Excavated Material and Waste Commitments
Other
Thames Water (PDF, 33 KB)
APP78.2 Book of Reference - 13 January 2014 - City of Westminster
Other
Thames Water (PDF, 1 MB)
APP72.14 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 47 MB)
APP65 Book of Plans - Revised Drawings - Part 3 of 3
Other
Thames Water (PDF, 184 KB)
APP61.13.02 SUPPORTING APPENDIX Lorry movement capacity at river sites
Other
Thames Water (PDF, 684 KB)
APP72.13 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 609 KB)
APP72.2 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks (Revised 13 January 2014)
Other
Thames Water (PDF, 500 KB)
APP72.24 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works (Revised 13 January 2014)
Other
Thames Water (PDF, 1 MB)
APP61 Thames Water Traffic Travel and Transportation
Other
Thames Water (PDF, 481 KB)
APP72.25 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street (Comparite against 23 September 2013)
Other
Thames Water (PDF, 286 KB)
APP81 List of Application Documents
Other
Thames Water (PDF, 727 KB)
APP72.8 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside (Comparite against 23 September 2013)
Other
Thames Water (PDF, 231 KB)
APP75.1 Drafting Notes relating to Updated Draft DCO
Other
Thames Water (PDF, 447 KB)
APP61.04.01 SUPPORTING APPENDIX Marine Routes of Entry to Project V3.0
Other
Thames Water (PDF, 816 KB)
APP72.18 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf (Comparite against 28 February 2013)
Other
Thames Water (PDF, 1 MB)
APP72.14 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 576 KB)
APP72.21 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street (Revised 13 January 2014)
Other
Thames Water (PDF, 833 KB)
APP72.9 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 1 MB)
APP67 Summary of Further On-site Mitigation Measures and Revisions to Compensation Policies
Other
Thames Water (PDF, 512 KB)
APP72.15 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 971 KB)
APP72.2 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks (Comparite against 28 February 2013)
Other
Thames Water (PDF, 845 KB)
APP72.5 Code of Construction Practice Part B Site Specific Requirements - Putney Embankment Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 499 KB)
APP72.25 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street (Revised 13 January 2014)
Other
Thames Water (PDF, 627 KB)
APP72.7 Code of Construction Practice Part B Site Specific Requirements - King George's Park (Revised 13 January 2014)
Other
Thames Water (PDF, 845 KB)
APP72.5 Code of Construction Practice Part B Site Specific Requirements - Putney Embankment Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 771 KB)
APP72.15 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore (Comparite against 28 February 2013)
Other
Thames Water (PDF, 160 KB)
APP58 Thames Water Policy
Other
Thames Water (PDF, 848 KB)
APP72.10 Code of Construction Practice Part B Site Specific Requirements - Cremorne Wharf Depot (Comparite against 23 September 2013)
Other
Thames Water (PDF, 33 KB)
APP78.1 Book of Reference - 13 January 2014 - Change Log
Other
Thames Water (PDF, 1 MB)
APP60 Thames Water Socio-Economic Effects
Other
Thames Water (PDF, 363 KB)
APP64.3 Thames Water Additional Statement of Common Ground Request - Thames Tideway Tunnel and London Duck Tours and PLA
Other
Thames Water (PDF, 773 KB)
APP72.15 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 33 KB)
APP78.8 Book of Reference - 13 January 2014 - LB Wandsworth
Other
Thames Water (PDF, 1 MB)
APP57 Thames Water Other Matters
Other
Thames Water (PDF, 1 MB)
APP72.1 Code of Construction Practice Part A General Requirements - Comparite against 23 September 2013
Other
Thames Water (PDF, 779 KB)
APP72.24 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works (Comparite against 28 February 2013)
Other
Thames Water (PDF, 847 KB)
APP72.10 Code of Construction Practice Part B Site Specific Requirements - Cremorne Wharf Depot (Comparite against 28 February 2013)
Other
Thames Water (PDF, 770 KB)
APP72.19 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park Foreshore (Comparite against 23 September 2013)
Other
Thames Water (PDF, 801 KB)
APP72.23 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 966 KB)
APP72.1 Code of Construction Practice Part A General Requirements - Revised 13 January 2014
Other
Thames Water (PDF, 303 KB)
APP59.14.01 SUPPORTING APPENDIX Noise and vibration assessment tables for the Heckford Street and Park option
Other
Thames Water (PDF, 533 KB)
APP72.18 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf (Revised 13 January 2014)
Other
Thames Water (PDF, 728 KB)
APP72.8 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside (Comparite against 28 February 2013)
Other
Thames Water (PDF, 822 KB)
APP72.16 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 834 KB)
APP72.9 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 653 KB)
APP72.14 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore (Revised 13 January 2014)
Other
Thames Water (PDF, 780 KB)
APP72.24 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works (Comparite against 23 September 2013)
Other
Thames Water (PDF, 778 KB)
APP56.04.13 SUPPORTING APPENDIX Area of likely significant effect using BS5228 ABC method - Minor Works Site (Bekesbourne Street)
Other
Thames Water (PDF, 544 KB)
APP72.10 Code of Construction Practice Part B Site Specific Requirements - Cremorne Wharf Depot (Revised 13 January 2014)
Other
Thames Water (PDF, 503 KB)
APP72.8 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside (Revised 13 January 2014)
Other
Thames Water (PDF, 684 KB)
APP72.13 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 615 KB)
APP59.22.02 SUPPORTING APPENDIX Effect at Abbey Mills of Variable Drive Rates
Other
Thames Water (PDF, 243 KB)
APP70 Settlement Deed
Other
Thames Water (PDF, 1 MB)
APP79.3 Statement of Reasons - Comparite against 28 February 2013
Other
Thames Water (PDF, 948 KB)
APP72.22 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station (Comparite against 28 February 2013)
Other
Thames Water (PDF, 816 KB)
APP72.18 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf (Comparite against 23 September 2013)
Other
Thames Water (PDF, 917 KB)
APP79.1 Statement of Reasons - Revised for 13 January 2014
Other
Thames Water (PDF, 549 KB)
APP76.2 Design Principles - Comparite against 23 September 2013
Other
Thames Water (PDF, 827 KB)
APP72.4 Code of Construction Practice Part B Site Specific Requirements - Barn Elms (Comparite against 28 February 2013)
Other
Thames Water (PDF, 618 KB)
APP71 Updated Settlement Information Paper
Other
Thames Water (PDF, 716 KB)
APP61.13.01 SUPPORTING APPENDIX Draft Transport Strategy Summary
Other
Thames Water (PDF, 564 KB)
APP72.20 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 33 KB)
APP78.4 Book of Reference - 13 January 2014 - LB Hammersmith and Fulham
Other
Thames Water (PDF, 47 MB)
APP66 Supporting Drawings - Part 2 of 2
Other
Thames Water (PDF, 33 KB)
APP78.6 Book of Reference - 13 January 2014 - LB Lambeth
Other
Thames Water (PDF, 482 KB)
APP72.25 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street (Comparite against 28 February 2013)
Other
Thames Water (PDF, 589 KB)
APP72.22 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 33 KB)
APP78.7 Book of Reference - 13 January 2014 - LB Newham
Other
Thames Water (PDF, 447 KB)
APP82 Draft Guide for Developers
Other
Thames Water (PDF, 947 KB)
APP72.22 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 509 KB)
APP72.17 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station (Revised 13 January 2014)
Other
Thames Water (PDF, 743 KB)
APP76.1 Design Principles Update - January 2014
Other
Thames Water (PDF, 33 KB)
APP78.5 Book of Reference - 13 January 2014 - RB Kensington and Chelsea
Other
Thames Water (PDF, 547 KB)
APP59.22.01 SUPPORTING APPENDIX Profile of Movements at Abbey Mills with Four Barges
Other
Thames Water (PDF, 827 KB)
APP72.4 Code of Construction Practice Part B Site Specific Requirements - Barn Elms (Comparite against 23 September 2013)
Other
Thames Water (PDF, 972 KB)
APP72.2 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks (Comparite against 23 September 2013)
Other
Thames Water (PDF, 887 KB)
APP72.20 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 1 MB)
APP79.2 Statement of Reasons - Comparite against 4 November 2013
Other
Thames Water (PDF, 3 MB)
APP83 The Groundwater Environmental Management Dewatering and Monitoring Strategy
Other
Thames Water (PDF, 655 KB)
APP68 Non Statutory Off-site Mitigation and Compensation Policy (DRAFT)
Other
Thames Water (PDF, 20 MB)
APP66 Supporting Drawings - Part 1 of 2
Other
Thames Water (PDF, 771 KB)
APP72.17 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station (Comparite against 23 September 2013)
Other
Thames Water (PDF, 873 KB)
APP68.01.01 SUPPORTING APPENDIX Houseboat Compensation Policy
Other
Thames Water (PDF, 123 KB)
APP64.01.01 SUPPORTING APPENDIX Meeting Minutes
Other
Andrew Whetnall (PDF, 3 MB)
Submission for the 13 January deadline
Other
Andrew Whetnall (PDF, 30 KB)
Late Submission for 13 January deadline
Other
Andrew Whetnall (PDF, 368 KB)
Submission for the 13 January deadline
Other
Ann Rosenberg (PDF, 363 KB)
Submission for the 13 January deadline
Other
Katie Persaud on behalf of Cannon Wharf LLP (PDF, 171 KB)
Submission for the 13 January deadline
Other
Catherine Schade (PDF, 45 KB)
Submission for the 13 January deadline
Other
Don't Dump On Deptford's Heart (PDF, 39 KB)
Submission for the 13 January deadline
Other
Margaret Ketteridge on behalf of GTC (PDF, 38 KB)
Submission for the 13 January deadline
Other
John Harris (PDF, 12 KB)
Submission for the 13 January deadline
Other
Jo Bradford on behalf of Justine Greening MP (PDF, 40 KB)
Submission for the 13 January deadline
Other
Lance Pierson (PDF, 56 KB)
Submission for the 13 January deadline
Other
London Borough of Hammersmith & Fulham (PDF, 254 KB)
Submission for the 13 January deadline
Other
London Borough of Tower Hamlets (PDF, 698 KB)
Joint Borough Draft Code of Construction Practice for 13 January Deadline
Other
London Borough of Wandsworth (PDF, 27 KB)
Update on current status of draft s.106 agreement for 13 January Deadline
Other
National Association of Boat Owners (PDF, 112 KB)
Submission for the 13 January deadline
Other
Royal Borough of Kensington & Chelsea (PDF, 240 KB)
Submission for the 13 January deadline
Other
RT Hon Simon Hughes MP (PDF, 143 KB)
Submission for the 13 January deadline
Other
Save Your Riverside (PDF, 119 KB)
Submission for the 13 January deadline
Other
Spirit Pub Company Ltd (PDF, 108 KB)
Submission for the 13 January deadline
Other
St Paul's Deptford (PDF, 18 KB)
Submission for the 13 January deadline
Other
Surrey Quays Ltd (PDF, 146 KB)
Submission for the 13 January deadline
Other
Mark Southwood on behalf of Temple Group Ltd (PDF, 637 KB)
Submission for the 13 January deadline
Other
Thames Water (PDF, 2 MB)
Statement of Common Ground- Environment Agency
Other
Thames Water (PDF, 215 KB)
Statement of Common Ground - Mayor of London
Other
Thames Water (PDF, 1 MB)
Statement of Common Ground - LB Lambeth
Other
Thames Water (PDF, 810 KB)
Statement of Common Ground - LB Ealing
Other
Thames Water (PDF, 877 KB)
Statement of Common Ground - LB Southwark
Other
Thames Water (PDF, 180 KB)
Statement of Common Ground - Port of London Authority
Other
Thames Water (PDF, 2 MB)
Statement of Common Ground - City of London
Other
Thames Water (PDF, 2 MB)
Statement of Common Ground - London Legacy Development Corporation
Other
Thames Water (PDF, 2 MB)
Statement of Common Ground - LB Tower Hamlets
Other
Thames Water (PDF, 370 KB)
Statement of Common Ground - Network Rail
Other
Thames Water (PDF, 885 KB)
Statement of Common Ground - LB Richmond upon Thames
Other
Thames Water (PDF, 514 KB)
Statement of Common Ground - RB Greenwich
Other
Thames Water (PDF, 2 MB)
Statement of Common Ground - LB Wandsworth
Other
Thames Water (PDF, 557 KB)
Statement of Common Ground - Transport for London
Other
Thames Water (PDF, 248 KB)
Statement of Common Ground - Marine Management Organisation
Other
Thames Water (PDF, 248 KB)
Statement of Common Ground - Canal and River Trust
Other
Thames Water (PDF, 231 KB)
Statement of Common Ground - LB Lewisham
Other
Thames Water (PDF, 408 KB)
Statement of Common Ground- City of Westminster
Other
Thames Water (PDF, 284 KB)
Cover letter for 13 January submissions
Other
Thames Water (PDF, 280 KB)
Statement of Common Ground - LB Hounslow
Other
Thames Water (PDF, 8 MB)
Statement of Common Ground - The Historic Buildings and Monuments Commission for England
Other
Thames Water (PDF, 1 MB)
Statement of Common Ground - RB Kensington and Chelsea
Other
Thames Water (PDF, 677 KB)
Statement of Common Ground - LB Hammersmith and Fulham
Other
Thames Water (PDF, 156 KB)
Statement of Common Ground - Summary
Other
Thames Water (PDF, 3 MB)
Statement of Common Ground - LB Newham
Other
Thames Water Documents Schedule (PDF, 255 KB)
Other
Thames Water Drawing Schedule (PDF, 530 KB)
Other
Larry Broomhead on behalf of Wrayburn Resident's Together (PDF, 98 KB)
Late Submission for 13 January deadline
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.