Thames Tideway Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (0)

Developer's Application (406)

Acceptance (28)

Pre Examination (59)

Examination (1978)

Decision (41)

Decided (61)

Date

SourceDescription
Other
Size: 16 KB
Cllr Eliza Mann
Other
Size: 16 KB
Philip Miller
Other
Size: 21 KB
Cllr Anood Al-Samerai
Other
Size: 4 MB
Andrew Whetnall
Other
Size: 132 KB
Simon Hughes MP
Late submission accepted for the 12 February deadline
Other
Size: 4 MB
Thamesbank
Other
Size: 99 KB
Larry Broomhead
Oral Representation Summary - 3 February Open Floor Hearing
Other
Size: 113 KB
Brian Chadwick
3 February deadline
Other
Size: 1 MB
Stop the Shaft
3 February deadline
Other
audio recording
Size: 175 MB
140203 WW010001 Open Floor Hearing Recording
Recording of the hearing on 03 February '14
Other
Size: 506 KB
Thames Water Utilities Limited
APP104.12 Code of Construction Practice Part B Site Specific Requirements - Chelsea Embankment Foreshore - Revised 3 February 2014
Other
Size: 534 KB
Thames Water Utilities Limited
APP104.19 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf - Revised 3 February 2014
Other
Size: 136 KB
Thames Water Utilities Limited
APP103.05 Thames Water's response to Minerva Wandsworth Limited
Other
Size: 620 KB
Thames Water Utilities Limited
APP104.08 Code of Construction Practice Part B Site Specific Requirements - King George's Park - Revised 3 February 2014
Other
Size: 1 MB
Port of London Authority
Other
Size: 651 KB
Thames Water Utilities Limited
APP104.15 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore - Revised 3 February 2014
Other
Size: 11 KB
Surrey Quays Ltd
Other
Size: 539 KB
Thames Water Utilities Limited
APP104.11 Code of Construction Practice Part B Site Specific Requirements - Cremorne Wharf Depot - Revised 3 February 2014
Other
Size: 2 MB
Environment Agency
Environment Agency comment on Excavated Waste and Material Commitments, and Design Principles.
Other
Size: 72 KB
Simon Hughes MP
Other
Size: 290 KB
Thames Water Utilities Limited
APP144 Statement of Common Ground with the occupiers of 85 Albert Embankment
Other
Size: 317 KB
London Borough of Hammersmith and Fulham
Other
Size: 150 KB
Mayor of London
Other
Size: 470 KB
Thames Water Utilities Limited
APP104.14 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station - Revised 3 February 2014
Other
Size: 504 KB
Thames Water Utilities Limited
APP104.18 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station - Revised 3 February 2014
Other
Size: 544 KB
Thames Water Utilities Limited
APP104.07 Code of Construction Practice Part B Site Specific Requirements - Dormay Street - Revised 3 February 2014
Other
Size: 138 KB
Thames Water Utilities Limited
APP103.10 Thames Water's response to Hermitage Community Moorings
Other
Size: 343 KB
Thames Water Utilities Limited
APP103.09 Thames Water's response to Catherine Schade
Other
Size: 564 KB
Thames Water Utilities Limited
APP104.06 Code of Construction Practice Part B Site Specific Requirements - Putney Embankment Foreshore - Revised 3 February 2014
Other
Size: 2 MB
Thames Water Utilities Limited
APP107 Consents Management Plan
Other
Size: 584 KB
Thames Water Utilities Limited
APP104.23 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station - Revised 3 February 2014
Other
Size: 538 KB
Thames Water Utilities Limited
APP104.05 Code of Construction Practice Part B Site Specific Requirements - Barn Elms - Revised 3 February 2014
Other
Size: 153 KB
Thames Water Utilities Limited
APP111 Noise Insulation Proposals
Other
Size: 1 MB
Environment Agency
Environment Agency comment on the CoCP (Part A) submitted by the applicant on the 13th January 2014
Other
Size: 62 KB
London Borough of Tower Hamlets
Other
Size: 392 KB
85 Albert Embankment
Other
Size: 202 KB
Thames Water Utilities Limited
APP103.11 Thames Water's response to Unity Harvey
Other
Size: 902 KB
Thames Water Utilities Limited
APP106.01 Design Principles Comparite against 28 Feburary 2013
Other
Size: 850 KB
Thames Water Utilities Limited
APP112 Non-statutory Off-site Mitigation and Compensation Policy
Other
Size: 573 KB
Thames Water Utilities Limited
APP104.22 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street - Revised 3 February 2014
Other
Size: 495 KB
Thames Water Utilities Limited
APP104.25 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works - Revised 3 February 2014
Other
Size: 215 KB
Thames Water Utilities Limited
APP103.02 Thames Water's response to Derek Joseph on behalf of Tempus Wharf Freehold Ltd
Other
Size: 515 KB
Thames Water Utilities Limited
APP104.20 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park Foreshore - Revised 3 February 2014
Other
Size: 516 KB
Thames Water Utilities Limited
APP104.24 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station - Revised 3 February 2014
Other
Size: 533 KB
Thames Water Utilities Limited
APP104.10 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station - Revised 3 February 2014
Other
Size: 1 MB
Thames Water Utilities Limited
APP109 Excavated Material and Waste Commitments
Other
Size: 215 KB
Thames Water Utilities Limited
APP103.03 Thames Water's response to Mark Southwood on behalf of Temple Group Limited
Other
Size: 494 KB
Thames Water Utilities Limited
APP104.26 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street - Revised 3 February 2014
Other
Size: 847 KB
Thames Water Utilities Limited
APP106.01 Design Principles Comparite against 13 January 2014
Other
Size: 3 MB
Thames Water Utilities Limited
APP108 Groundwater Environmental Management - Dewatering and Monitoring Strategy
Other
Size: 500 KB
Thames Water Utilities Limited
APP104.09 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside - Revised 3 February 2014
Other
Size: 96 KB
Save Your Riverside
Other
Size: 372 KB
Thames Water Utilities Limited
APP104.01 Explanatory note for changes to the Code of Construction Practice
Other
Size: 190 KB
Thames Water Utilities Limited
APP103.07 Thames Water's response to TfL Pell Frischmann report
Other
Size: 224 KB
Free Trade Wharf Management Company
Other
Size: 558 KB
Thames Water Utilities Limited
APP104.04 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station - Revised 3 February 2014
Other
Size: 820 KB
Thames Water Utilities Limited
APP104.17 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore - Revised 3 February 2014
Other
Size: 334 KB
85 Albert Embankment
Other
Size: 2 MB
Thames Water Utilities Limited
APP105.02 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order - Revised 3 February 2014
Other
Size: 2 MB
Thames Water Utilities Limited
APP105.02 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order - Comparite against 13 January 2014
Other
Size: 445 KB
Thames Water Utilities Limited
APP104.13 Code of Construction Practice Part B Site Specific Requirements - Kirtling Street - Revised 3 February 2014
Other
Size: 131 KB
Thames Water Utilities Limited
APP103.01 Thames Water's response to Thamesbank
Other
Size: 88 KB
St James Group Ltd
Other
Size: 604 KB
Thames Water Utilities Limited
APP104.03 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks - Revised 3 February 2014
Other
Size: 212 KB
Thames Water Utilities Limited
APP103.08 Thames Water's response to Stuart Tyler
Other
Size: 153 KB
Thames Water Utilities Limited
APP103.06 Thames Water's response to London Borough of Southwark
Other
Size: 3 MB
Environment Agency
Environment Agency position note on requirement PW7 and comments on the DCO including EA Protective Provisions, and Groundwater Management Dewatering and Monitoring Strategy
Other
Size: 1 MB
Thames Water Utilities Limited
APP104.02 Code of Construction Practice Part A General Requirements - Revised 3 February 2014
Other
Size: 427 KB
Thames Water Utilities Limited
APP101 Covering Letter
Other
Size: 310 KB
London Borough of Southwark
Other
Size: 753 KB
Thames Water Utilities Limited
APP106.01 Design Principles update - Revised 3 February 2014
Other
Size: 143 KB
Thames Water Utilities Limited
APP103.04 Thames Water's response to Juliet Munn on behalf of Battersea Power Station Development Company
Other
Size: 222 KB
Thames Water Utilities Limited
APP105.01 Drafting notes relating to updated draft Development Consent Order
Other
Size: 69 KB
London Borough of Lewisham
Other
Size: 2 MB
Thames Water Utilities Limited
APP105.02 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order - Comparite against 28 February 2013
Other
Size: 269 KB
Thames Water Utilities Limited
APP113 Sample Trigger Action Plan (TAP)
Other
Size: 509 KB
Thames Water Utilities Limited
APP104.16 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore - Revised 3 February 2014
Other
Size: 561 KB
Thames Water Utilities Limited
APP104.21 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station - Revised 3 February 2014
Other
Size: 492 KB
Marine Management Organisation
Other
Size: 660 KB
Thames Water Utilities Limited
APP106.02 Design Principles Route Map
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.