Silvertown Tunnel

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (108)

Acceptance (10)

Pre Examination (31)

Examination (673)

Decision (71)

Decided (0)

Date

SourceDescription
Other
Size: 24 KB
Friends of the Earth
Submission for Deadline 4
Other
Size: 46 MB
Transport for London
6.10 Code of Construction Practice Revision 3
Other
Size: 25 MB
Transport for London
2.3 Land Plans Revision 1
Other
Size: 46 MB
Transport for London
6.10 Code of Construction Practice Revision 3 (Tracked changes)
Other
Size: 146 KB
Lidoka Estates Ltd
Submission for Deadline 4
Other
Size: 136 KB
Transport for London
8.96 SWQ Geology, Soils and Contaminated Land GS Report
Other
Size: 80 KB
Natural England
Response to ExA’s Second Written Questions
Other
Size: 669 KB
Transport for London
7.11 Charging Policies and Procedures Revision 2
Other
Size: 255 KB
London Borough of Southwark
Update and comments on the updated draft Development Consent Order
Other
Size: 4 MB
Transport for London
2.4 Special Category Land Plan(s) Revision 2
Other
Size: 389 KB
Historic England
Response to ExA’s Second Written Questions
Other
Size: 133 KB
Transport for London
8.99 SWQ Heritage HT Report
Other
Size: 241 KB
Dominic Leggett
Submission for Deadline 4
Other
Size: 538 KB
Transport for London
8.91 SWQ DCO Wording DC Report
Other
Size: 204 KB
London Borough of Hackney
Response to ExA’s Second Written Questions
Other
Size: 5 MB
Transport for London
8.86 Wharves Access Impact Technical Note
Other
Size: 16 KB
Thames Water
Response to ExA’s Second Written Questions
Other
Size: 2 MB
Transport for London
4.1 Statement of Reasons Revision 2 (Tracked changes)
Other
Size: 1 MB
Transport for London
8.84 Monitoring and Mitigation Strategy
Other
Size: 718 KB
Transport for London
3.1 Draft DCO Revision 4
Other
Size: 634 KB
Environment Agency
Response to ExA’s Second Written Questions and other comments
Other
Size: 164 KB
Royal Mail Group Limited
Email confirming withdrawal of objection
Other
Size: 429 KB
Transport for London
7.12 Mitigation Route Map Revision 2
Other
Size: 12 MB
Transport for London
8.94 SWQ Traffic and Transportation TT Report
Other
Size: 2 MB
Transport for London
6.3.9.8 ES Appendix 9H Revision 1 (Tracked changes)
Other
Size: 580 KB
London Borough of Newham
Response to ExA’s Second Written Questions and other comments
Other
Size: 4 MB
Port of London Authority
Further submission for Deadline 4
Other
Size: 27 MB
Transport for London
8.83 Design and Access Statement Addendum
Other
Size: 153 KB
Transport for London
8.92 SWQ Terrestrial Ecology TE Report
Other
Size: 2 MB
Transport for London
7.4 Design Principles Revision 2
Other
Size: 370 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 4 (Tracked changes)
Other
Size: 39 KB
London Borough of Bexley
Response to ExA’s Second Written Questions and other comments
Other
Size: 2 MB
Transport for London
8.101 SWQ Surface Water, Flood Risk Assessment SW Report
Other
Size: 334 KB
Transport for London
8.90 SWQ General GA Report
Other
Size: 17 KB
ASD Limited (Kloeckner Metals UK)
Submission for Deadline 4
Other
Size: 531 KB
Health and Safety Executive
Response to ExA’s Second Written Questions and other comments
Other
Size: 527 KB
Transport for London
7.12 Mitigation Route Map Revision 2 (Tracked changes)
Other
Size: 164 KB
Transport for London
8.85 520 Over-Height Vehicles (OHV) Scenario Noise Impacts
Other
Size: 2 MB
Transport for London
6.3.9.8 ES Appendix 9H Revision 1
Other
Size: 2 MB
Transport for London
7.4 Design Principles Revision 2 (tracked changes)
Other
Size: 283 KB
Southern Gas Networks and Birch Sites Limited
Response to ExA’s Second Written Questions
Other
Size: 2 MB
Transport for London
8.89 SWQ Compulsory Acquisition CA Report
Other
Size: 1 MB
Transport for London
3.1 Draft DCO Revision 4 (Tracked changes)
Other
Size: 39 KB
ExCeL London
Submission for Deadline 4
Other
Size: 1 MB
Transport for London
8.93 SWQ Construction on Land CL Report
Other
Size: 121 KB
Silvertown Homes Limited (formerly known as Quintain Limited)
Submission for Deadline 4
Other
Size: 303 KB
Marine Management Organisation
Response to ExA’s Second Written Questions
Other
Size: 1 MB
Transport for London
8.88 Landscaping Plan
Other
Size: 33 KB
Transport for London
4.3 Book of Reference Revision 2
Other
Size: 33 KB
Transport for London
4.3 Book of Reference Revision 2 (Tracked changes)
Other
Size: 660 KB
Transport for London
8.100 SWQ Marine Ecology ME Report
Other
Size: 2 MB
Transport for London
4.1 Statement of Reasons Revision 2
Other
Size: 521 KB
Royal Borough of Greenwich
Response to ExA’s Second Written Questions and other comments
Other
Size: 831 KB
Transport for London
7.11 Charging Policies and Procedures Revision 2 (Tracked changes)
Other
Size: 179 KB
London Borough of Tower Hamlets
Further submission for Deadline 4
Other
Size: 454 KB
Nathaniel Lichfield and Partners on behalf of U and I Group Plc
Submission for Deadline 4
Other
Size: 22 MB
Transport for London
8.98 SWQ Health, Safety and Security HSS Report
Other
Size: 1,022 KB
Port of London Authority
Response to ExA’s Second Written Questions
Other
Size: 83 KB
Health and Safety Executive
Submission for Deadline 4
Other
Size: 93 KB
Transport for London
8.80 Deadline 4 Cover Letter
Other
Size: 349 KB
London Borough of Southwark
Response to ExA’s Second Written Questions
Other
Size: 173 KB
Transport for London
8.95 SWQ Air Quality AQ Report
Other
Size: 308 KB
London Borough of Hackney
Update and comments on the updated draft Development Consent Order
Other
Size: 359 KB
London Borough of Lewisham
Response to ExA’s Second Written Questions
Other
Size: 224 KB
Transport for London
3.2 Explanatory Memorandum to DCO Revision 4
Other
Size: 153 KB
Motorcycle Action Group
Submission for Deadline 4
Other
Size: 240 KB
Brenntag UK Limited
Response to ExA’s Second Written Questions and other comments
Other
Size: 2 MB
Transport for London
8.81 Document Explaining DCO Amendments
Other
Size: 134 KB
Transport for London
8.97 SWQ Noise and Vibration NV Report
Other
Size: 361 KB
Transport for London
8.82 Bus Strategy
Other
Size: 114 KB
London Borough of Tower Hamlets
Response to ExA’s Second Written Questions
Other
Size: 138 KB
Transport for London
SoCG001 - Statement of Common Ground with Natural England (Revision 2)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.