North London Heat and Power Project

You can filter the results to show only the items that match your interest.

Date

SourceDescription
Other
Size: 98 kB
Notification of Completion of ExA Examination
Other
Size: 63 kB
Royal Mail Group
Written Representation- Late submission
Other
Size: 368 kB
North London Waste Authority
AD03.03 Development Consent Obligations (Rev 2 Tracked)- Late submission
Other
Size: 264 kB
North London Waste Authority
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 2 Clean) - Issue - resubmitted as the final version of the document
Other
Size: 7 MB
North London Waste Authority
AD03.05 DCO Schedules 6-8 Explanatory Diagrams (REV 01) -resubmitted as the final version of the document
Other
Size: 117 kB
Canal and River Trust
Response to the Rule 17 Issued 29 July 2016
Other
Size: 350 kB
North London Waste Authority
AD03.02 Explanatory Memorandum (Rev 1)
Other
Size: 3 MB
North London Waste Authority
AD06.02 Environmental Statement Vol 2 - resubmitted as the final version of the document
Other
Size: 18 kB
North London Waste Authority
AD03.01 Validation certificate of the Draft DCO (Rev 4)
Other
Size: 70 MB
North London Waste Authority
AD06.02 Environmental Statement Vol 2 Figures 2.1 to 11.2 - resubmitted as the final version of the document
Other
Size: 20 MB
North London Waste Authority
AD02.02 Design Code Principles (Rev 01) Issue - resubmitted as the final version of the document
Other
Size: 1 MB
North London Waste Authority
AD06.02 Environmental Statement Vol 1 - resubmitted as the final version of the document
Other
Size: 50 MB
North London Waste Authority
AD02.01 Book of Plans (REV 02)Issue- resubmitted as the final version of the document
Other
Size: 99 kB
Transport for London
Response to the Rule 17 Issued 29 July 2016
Other
Size: 388 kB
North London Waste Authority
AD07.33 Table of Revisions to the Draft DCO
Other
Size: 90 kB
North London Waste Authority
Joint Statement with Lee Valley Regional Park Authority on negotiations for private agreement
Other
Size: 267 kB
National Grid
Response to the Rule 17 Issued 29 July 2016
Other
Size: 1 MB
North London Waste Authority
AD03.01 Draft DCO (Rev 4 - Comparison Deadline 8 Version Against Application Version)
Other
Size: 1 MB
North London Waste Authority
AD03.01 Draft DCO (Rev 4 - Comparison Deadline 8 Version Against Deadline 7 Version)
Other
Size: 3 MB
North London Waste Authority
AD04.03 Book of Reference (Rev 2) - resubmitted as the final version of the document
Other
Size: 228 kB
North London Waste Authority
AD07.36 Applicant’s Response to the Rule 17 Letter Dated 1 August 2016 Relating to Appeals
Other
Size: 324 kB
North London Waste Authority
AD07.38 Joint Statements with Lee Valley Regional Park Authority ,National Grid Electricity Transmission PLC and Zayo UK Ltd
Other
Size: 407 kB
North London Waste Authority
AD03.01 Validation report of the Draft DCO (Rev 4).
Other
Size: 10 MB
North London Waste Authority
AD06.02 Environmental Statement Vol 2 Appendices 8.1 to 11.3 - resubmitted as the final version of the document
Other
Size: 48 MB
North London Waste Authority
AD06.02 Environmental Statement Vol 2 Appendices 2.1 to 5 - resubmitted as the final version of the document
Other
Size: 811 kB
North London Waste Authority
AD03.01 Draft DCO (Rev 4 Clean)
Other
Size: 349 kB
North London Waste Authority
AD07.35 Note of Clarification Following the Accompanied Site Inspection on 17 August 2016
Other
Size: 248 kB
North London Waste Authority
AD07.32 Table of Revisions to the Book of Plans Since Application
Other
Size: 208 kB
North London Waste Authority
AD07.32 Table of Revisions to the DCO Schedule 6-8 Explanatory Diagrams
Other
Size: 813 kB
North London Waste Authority
AD07.31 Statement of the Final Position Concerning Outstanding Objections to Compulsory Acquisition
Other
Size: 375 kB
North London Waste Authority
AD05.12 Code of Construction Practice (Rev 2 Clean) - resubmitted as the final version of the document
Other
Size: 9 MB
North London Waste Authority
AD06.02 Environmental Statement Vol 3 - resubmitted as the final version of the document
Other
Size: 157 kB
North London Waste Authority
AD07.39 Note on Revisions to the Environmental Statement
Other
Size: 40 MB
North London Waste Authority
D06.02 Environmental Statement Vol 2 Appendices 7.1 to 7.3 - resubmitted as the final version of the document
Other
Size: 2 MB
North London Waste Authority
AD03 03 Development Consent Obligations (Rev 2 Clean)- Late submission
Other
Size: 160 kB
North London Waste Authority
AD07.37 NLHPP Roadmap of Plans
Other
Size: 43 MB
North London Waste Authority
AD06.02 Environmental Statement Vol 1 Figures and Appendices- resubmitted as the final version of the document
Other
Size: 76 MB
North London Waste Authority
AD06.02 Environmental Statement Vol 3 Appendices (REV 01) - resubmitted as the final version of the document
Other
Size: 6 MB
Lee Valley Regional Park Authority
Comments for Deadline 8
Other
Size: 1,020 kB
Rule 17 Letter sent to North London Waste Authority
Request for Further Information
Other
Size: 78 kB
Rule 17 Letter sent to Kennet Properties Limited
Request for Further Information
Other
Size: 79 kB
Rule 17 Letter sent to National Grid
Request for Further Information
Other
Size: 78 kB
Rule 17 Letter sent to Thames Water Utilities Limited
Request for Further Information
Other
Size: 79 kB
Rule 17 Letter sent to Lee Valley Regional Park Authority
Request for Further Information
Other
Size: 80 kB
Rule 17 Letter sent to Transport for London
Request for Further Information
Other
Size: 77 kB
Rule 17 Letter sent to Zayo Group Limited
Request for Further Information
Other
Size: 79 kB
Rule 17 Letter sent to Canal and River Trust
Request for Further Information
Other
Size: 2 MB
Notification of Accompanied Site Visit on 17 August 2016
Other
Size: 361 kB
Biffa Waste Services Ltd
Late submission for Deadline 7 accepted at the discretion of the Examining Authority
Other
Size: 375 kB
North London Waste Authority
AD05.12 Code of Construction Practice (Rev 2 Clean). Late submission for Deadline 7 accepted at the discretion of the Examining Authority
Other
Size: 388 kB
North London Waste Authority
AD05.12 Code of Construction Practice (Rev 2 Tracked). Late submission for Deadline 7 accepted at the discretion of the Examining Authority
Other
Size: 168 kB
North London Waste Authority
AD07.16 Table of Revisions to the Code of Construction Practice. Late submission for Deadline 7 accepted at the discretion of the Examining Authority
Other
Size: 326 kB
North London Waste Authority
AD07.14 Table of Revisions to the Draft DCO
Other
Size: 18 kB
KTI Energy Limited
Submission for Deadline 7
Other
Size: 260 kB
North London Waste Authority
AD07.20 Update on the Status of Private Agreement Negotiations
Other
Size: 30 kB
David Arweny
Submission for Deadline 7
Other
Size: 190 kB
National Grid
Post Hearing Submission
Other
Size: 855 kB
North London Waste Authority
AD04.01 CA Statement of Reasons (Rev 1 Tracked)
Other
Size: 286 kB
North London Waste Authority
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 2 Tracked)
Other
Size: 3 MB
North London Waste Authority
AD03.03 Development Consent Obligations (Rev 1 Clean)
Other
Size: 5 MB
North London Waste Authority
AD07.25 Table of Revisions and Manuscript Amendments to Drawings as given to ExA During Hearing 5 July 2016
Other
Size: 4 MB
North London Waste Authority
AD03.03 Development Consent Obligations (Rev 1 Tracked)
Other
Size: 17 kB
North London Waste Authority
Validation Certificate DCO
Other
Size: 917 kB
North London Waste Authority
AD03.01 Draft DCO (Rev 3 Tracked)
Other
Size: 256 kB
North London Waste Authority
AD07.19 Practical Management of Interactions with the National Grid DCO
Other
Size: 136 kB
North London Waste Authority
AD07.17 Table of Revisions to the Statement of Reasons
Other
Size: 21 kB
KTI Energy Limited
Post Hearing Submission
Other
Size: 171 kB
North London Waste Authority
AD07.28 Table of Revisions to the Design Code Principles
Other
Size: 230 kB
North London Waste Authority
AD07.27 Table of Revisions to Plans and Drawings for Deadline 7
Other
Size: 134 kB
Transport for London
Post Hearing Submission
Other
Size: 274 kB
North London Waste Authority
AD07.21 Response to Written Representation from Biffa
Other
Size: 164 kB
North London Waste Authority
AD07.17 Table of Revisions to the Environmental Commitments and Mitigation Schedule
Other
Size: 284 kB
North London Waste Authority
AD07.22 Summary of Oral Submissions made at Issue Specific Hearing on 5 July
Other
Size: 223 kB
North London Waste Authority
AD07.18 Note Regarding the Rights Held by National Grid
Other
Size: 231 kB
North London Waste Authority
CVs of Euston Ling and Ben Stansfield
Other
Size: 9 MB
North London Waste Authority
AD07.26 Plans and Drawings Updated for Deadline 7
Other
Size: 240 kB
North London Waste Authority
AD07.23 Summary of Oral Submissions made at Compulsory Acquisition Hearing on 6 July
Other
Size: 356 kB
North London Waste Authority
Validation Report DCO
Other
Size: 163 kB
North London Waste Authority
AD04.04 CA Powers Roadmap (Rev 2 Tracked)
Other
Size: 185 kB
North London Waste Authority
AD07.28 Table of Revisions to the Compulsory Acquisition Roadmap
Other
Size: 155 kB
North London Waste Authority
AD04.04 CA Powers Roadmap (Rev 2 Clean)
Other
Size: 51 kB
Thames Water Utilities Limited and Kennet Properties Limited
Comments submitted in advance of the 6 July hearing
Other
Size: 804 kB
North London Waste Authority
AD04.01 CA Statement of Reasons (Rev 1 Clean)
Other
Size: 650 kB
North London Waste Authority
AD07.24 Indicative Crane Oversailing Radius
Other
Size: 18 MB
North London Waste Authority
AD02.02 Design Code Principles Rev 1
Other
Size: 28 kB
Zayo Group UK Limited
Submission for Deadline 7
Other
Size: 687 kB
North London Waste Authority
AD03.01 Draft DCO (Rev 3 Clean)
Other
Size: 264 kB
North London Waste Authority
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 2 Clean)
Other
audio recording
Size: 382 kB
Audio Recording of the Second Open Floor Hearing on 5 July 2016
Other
audio recording
Size: 60 MB
Audio Recording of the Compulsory Acquisition Hearing on the Draft DCO on 6 July 2016
Other
audio recording
Size: 87 MB
Audio Recording of the Issue Specific Hearing on the Draft DCO - Session 2, and the First Open Floor Hearing on 5 July 2016
Other
audio recording
Size: 157 MB
Audio Recording of the Issue Specific Hearing on the Draft DCO on 5 July 2016 - Session 1
Other
Size: 159 kB
Biffa Waste Services Ltd
Late submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 208 kB
Greater London Authority
Comments on responses to the ExA’s second written questions. Late submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 107 kB
Agenda for the Issue Specific Hearing on 5 July 2016
Other
Size: 114 kB
Agenda for the Compulsory Acquisition Hearing on 6 July 2016
Other
Size: 976 kB
North London Waste Authority
AD03.04 Updated Statement of Common Ground - London Borough of Enfield (Rev 1). Late submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 727 kB
North London Waste Authority
AD03.04 Statement of Common Ground - Canal and River Trust. Late submission for Deadline 6. Accepted at the discretion of the Examining Authority
Other
Size: 460 kB
North London Waste Authority
Table of DCO Amendments submitted for Deadline 6
Other
Size: 473 kB
North London Waste Authority
AD05.12 Code of Construction Practice (Rev 1 Clean)
Other
Size: 392 kB
North London Waste Authority
AD07.09 Comments on Deadline 5 Submissions
Other
Size: 44 kB
North London Waste Authority
Validation certificate
Other
Size: 642 kB
Canal and River Trust
Submission for Deadline 6 regarding protective provisions
Other
Size: 682 kB
North London Waste Authority
AD05.12 Code of Construction Practice (Rev 1 Tracked)
Other
Size: 318 kB
North London Waste Authority
Draft DCO Submitted for Deadline 6 (clean)
Other
Size: 354 kB
North London Waste Authority
Validation Report
Other
Size: 121 kB
North London Waste Authority
Table of Revisions to Code of Construction Practice
Other
Size: 145 kB
Biffa Waste Services Ltd
Submission for Deadline 6
Other
Size: 349 kB
North London Waste Authority
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 1 Clean)
Other
Size: 139 kB
North London Waste Authority
Table of Revisions to the Environmental Commitments and Mitigation Schedule
Other
Size: 8 MB
North London Waste Authority
AD07.10 Plans and Drawings Updated for Deadline 6
Other
Size: 421 kB
North London Waste Authority
Draft DCO Submitted for Deadline 6 (comparison)
Other
Size: 508 kB
North London Waste Authority
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 1 Tracked)
Other
Size: 149 kB
Biffa Waste Services Ltd
Submission for Deadline 5
Other
Size: 652 kB
North London Waste Authority
AD03.04 Statement of Common Ground - Environment Agency
Other
Size: 55 kB
Royal Mail
Written Representation
Other
Size: 238 kB
Thames Water Utilities Ltd
Response to the ExA's Second Written Questions
Other
Size: 11 MB
North London Waste Authority
AD07.08 Responses to the ExA's Second Written Questions
Other
Size: 165 kB
Royal Mail Limited
Late representation submitted on 26 May 2016. Accepted at the discretion of the Examining Authority
Other
Size: 81 kB
London Borough of Enfield
Response to the ExA's Second Written Questions
Other
Size: 75 kB
Notification of July Hearings
Other
Size: 147 kB
Examining Authority's Second Written Questions
Other
Size: 2 MB
North London Waste Authority
AD03.04 Statement of Common Ground ? London Borough of Enfield. Late submission for Deadline 3 accepted at the discretion of the Examining Authority
Other
Size: 292 kB
North London Waste Authority
AD07.07 Comments on Responses to the ExA's First Written Questions
Other
Size: 766 kB
North London Waste Authority
AD07.05 Comments on Written Representations
Other
Size: 54 kB
Thames Water
Comments on Written Representations, Local Impact Reports and responses to ExA?s first written questions
Other
Size: 389 kB
North London Waste Authority
AD07.06 Comments on Local Impact Reports
Other
Size: 343 kB
Zayo Group UK Limited
Late representation submitted on 6 April 2016. Accepted at the discretion of the Examining Authority
Other
Size: 197 kB
Examination Library
Published Exam Library
Other
Size: 614 kB
Lee Valley Regional Park Authority
Response to the ExA?s first written questions
Other
Size: 455 kB
North London Waste Authority
Updated Draft Development Consent Order - Submitted for Deadline 3 - Comparison version against Draft submitted October 2015
Other
Size: 254 kB
Transport for London
Response to the ExA?s first written questions
Other
Size: 16 MB
North London Waste Authority
AD03.04 Statement of Common Ground - Transport for London
Other
Size: 242 kB
Environment Agency
Response to the ExA?s first written questions
Other
Size: 226 kB
North London Waste Plan
Response to the ExA?s first written questions
Other
Size: 3 MB
North London Waste Authority
AD03.04 Statement of Common Ground - Lee Valley Regional Park Authority
Other
Size: 80 kB
Canal and River Trust
Response to the ExA?s first written questions
Other
Size: 209 kB
North London Waste Authority
AD07.04 Applicant's Oral Submissions at the DCO Hearing 18 March 2016
Other
Size: 551 kB
North London Waste Authority
AD03.04 Statement of Common Ground - Greater London Authority
Other
Size: 128 kB
London Borough of Enfield
Response to the ExA?s first written questions
Other
Size: 308 kB
National Grid
Response to the ExA?s first written questions
Other
Size: 49 MB
North London Waste Authority
AD07.02 Responses to the Examining Authority's First Written Questions
Other
Size: 145 kB
London Borough of Barnet
Local Impact Report
Other
Size: 341 kB
North London Waste Authority
Updated Draft Development Consent Order - Submitted for Deadline 3 - Clean version
Other
Size: 2 MB
London Borough of Enfield
Local Impact Report
Other
Size: 964 kB
Haringey Council
Local Impact Report
Other
Size: 541 kB
North London Waste Authority
AD03.04 Statement of Common Ground - Natural England
Other
Size: 73 kB
Thames Water
Response to the ExA?s first written questions
Other
Size: 410 kB
North London Waste Authority
AD07.03 Table of Revisions to the Draft DCO
Other
Size: 53 kB
Action points from the Issue Specific Hearing on 18 March 2016
Other
Size: 688 kB
Biffa Waste Services Ltd
Written Representation (Updated on 5 April 2016 to include previously missing text on page 5, paragraph II)
Other
Size: 27 kB
Canal and River Trust
Summary of Written Representation
Other
audio recording
Size: 55 MB
Audio Recording of the Issue Specific Hearing on the DCO on 18 March 2016 - Part 2
Other
Size: 1 MB
Lee Valley Regional Park Authority
Written Representation
Other
Size: 42 kB
Thames Water Utilities Limited and Kennet Properties Limited
Written Representation
Other
Size: 76 kB
National Grid
Written Representation
Other
Size: 23 kB
David Arweny
Written Representation
Other
Size: 192 kB
Transport for London
Written Representation
Other
Size: 332 kB
Environment Agency
Written Representation and Summary
Other
Size: 29 kB
River Lea Anglers Club
Written Representation
Other
audio recording
Size: 65 MB
Audio Recording of the Issue Specific Hearing on the DCO on 18 March 2016 - Part 1
Other
Size: 378 kB
London Borough of Enfield
Written Representation
Other
Size: 452 kB
Bestway Holdings Ltd
Written Representation
Other
Size: 484 kB
Canal and River Trust
Written representation (updated on 14 April 2016 to include the missing appendix 1 ? The Knottingley Power Protective Provisions)
Other
Size: 5 MB
Greater London Authority
Written Representation and Local Impact Report
Other
Size: 119 kB
Agenda for the Issue Specific Hearing on the DCO 18 March 2016
Other
Size: 2 MB
Site visit Agenda Letter
Other
Size: 1 MB
Canal and River Trust
Comments in advance of the March Hearing on the Draft DCO
Other
Size: 38 kB
National Grid
Comments for Deadline 1
Other
Size: 229 kB
North London Waste Authority
AD07.01 Comments on Relevant Representations
Other
Size: 139 kB
The Eley Estate Company
Comments for Deadline 1
Other
Size: 41 kB
Transport for London
Comments in advance of the March Hearing on the Draft DCO
Other
Size: 60 kB
Preliminary Meeting note
Note of the Preliminary meeting held on 24 February 2016
Other
Size: 132 kB
Examining Authority's First Written Questions
Other
Size: 134 kB
Rule 8 Letter
Other
audio recording
Size: 153 MB
Audio recording of the Preliminary Meeting held on 24 February 2016
Other
audio recording
Size: 19 kB
Audio recording of the Preliminary Meeting held on 24 February 2016 1
Other
Size: 97 kB
Notification of March hearing and Accompanied Site Inspection
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.