North London Heat and Power Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (7)

Developer's Application (55)

Acceptance (10)

Pre Examination (12)

Examination (178)

Decision (14)

Decided (9)

Date

SourceDescription
Other
Size: 460 KB
North London Waste Authority
Table of DCO Amendments submitted for Deadline 6
Other
Size: 473 KB
North London Waste Authority
AD05.12 Code of Construction Practice (Rev 1 Clean)
Other
Size: 392 KB
North London Waste Authority
AD07.09 Comments on Deadline 5 Submissions
Other
Size: 44 KB
North London Waste Authority
Validation certificate
Other
Size: 642 KB
Canal and River Trust
Submission for Deadline 6 regarding protective provisions
Other
Size: 682 KB
North London Waste Authority
AD05.12 Code of Construction Practice (Rev 1 Tracked)
Other
Size: 318 KB
North London Waste Authority
Draft DCO Submitted for Deadline 6 (clean)
Other
Size: 354 KB
North London Waste Authority
Validation Report
Other
Size: 121 KB
North London Waste Authority
Table of Revisions to Code of Construction Practice
Other
Size: 145 KB
Biffa Waste Services Ltd
Submission for Deadline 6
Other
Size: 349 KB
North London Waste Authority
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 1 Clean)
Other
Size: 139 KB
North London Waste Authority
Table of Revisions to the Environmental Commitments and Mitigation Schedule
Other
Size: 8 MB
North London Waste Authority
AD07.10 Plans and Drawings Updated for Deadline 6
Other
Size: 421 KB
North London Waste Authority
Draft DCO Submitted for Deadline 6 (comparison)
Other
Size: 508 KB
North London Waste Authority
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 1 Tracked)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.