North London Heat and Power Project

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (7)

Developer's Application (55)

Acceptance (10)

Pre Examination (12)

Examination (178)

Decision (14)

Decided (14)

Date

SourceDescription
Other
Size: 361 KB
Biffa Waste Services Ltd
Late submission for Deadline 7 accepted at the discretion of the Examining Authority
Other
Size: 375 KB
North London Waste Authority
AD05.12 Code of Construction Practice (Rev 2 Clean). Late submission for Deadline 7 accepted at the discretion of the Examining Authority
Other
Size: 388 KB
North London Waste Authority
AD05.12 Code of Construction Practice (Rev 2 Tracked). Late submission for Deadline 7 accepted at the discretion of the Examining Authority
Other
Size: 168 KB
North London Waste Authority
AD07.16 Table of Revisions to the Code of Construction Practice. Late submission for Deadline 7 accepted at the discretion of the Examining Authority
Other
Size: 326 KB
North London Waste Authority
AD07.14 Table of Revisions to the Draft DCO
Other
Size: 18 KB
KTI Energy Limited
Submission for Deadline 7
Other
Size: 260 KB
North London Waste Authority
AD07.20 Update on the Status of Private Agreement Negotiations
Other
Size: 30 KB
David Arweny
Submission for Deadline 7
Other
Size: 190 KB
National Grid
Post Hearing Submission
Other
Size: 855 KB
North London Waste Authority
AD04.01 CA Statement of Reasons (Rev 1 Tracked)
Other
Size: 286 KB
North London Waste Authority
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 2 Tracked)
Other
Size: 3 MB
North London Waste Authority
AD03.03 Development Consent Obligations (Rev 1 Clean)
Other
Size: 5 MB
North London Waste Authority
AD07.25 Table of Revisions and Manuscript Amendments to Drawings as given to ExA During Hearing 5 July 2016
Other
Size: 4 MB
North London Waste Authority
AD03.03 Development Consent Obligations (Rev 1 Tracked)
Other
Size: 17 KB
North London Waste Authority
Validation Certificate DCO
Other
Size: 917 KB
North London Waste Authority
AD03.01 Draft DCO (Rev 3 Tracked)
Other
Size: 256 KB
North London Waste Authority
AD07.19 Practical Management of Interactions with the National Grid DCO
Other
Size: 136 KB
North London Waste Authority
AD07.17 Table of Revisions to the Statement of Reasons
Other
Size: 21 KB
KTI Energy Limited
Post Hearing Submission
Other
Size: 171 KB
North London Waste Authority
AD07.28 Table of Revisions to the Design Code Principles
Other
Size: 230 KB
North London Waste Authority
AD07.27 Table of Revisions to Plans and Drawings for Deadline 7
Other
Size: 134 KB
Transport for London
Post Hearing Submission
Other
Size: 274 KB
North London Waste Authority
AD07.21 Response to Written Representation from Biffa
Other
Size: 164 KB
North London Waste Authority
AD07.17 Table of Revisions to the Environmental Commitments and Mitigation Schedule
Other
Size: 284 KB
North London Waste Authority
AD07.22 Summary of Oral Submissions made at Issue Specific Hearing on 5 July
Other
Size: 223 KB
North London Waste Authority
AD07.18 Note Regarding the Rights Held by National Grid
Other
Size: 231 KB
North London Waste Authority
CVs of Euston Ling and Ben Stansfield
Other
Size: 9 MB
North London Waste Authority
AD07.26 Plans and Drawings Updated for Deadline 7
Other
Size: 240 KB
North London Waste Authority
AD07.23 Summary of Oral Submissions made at Compulsory Acquisition Hearing on 6 July
Other
Size: 356 KB
North London Waste Authority
Validation Report DCO
Other
Size: 163 KB
North London Waste Authority
AD04.04 CA Powers Roadmap (Rev 2 Tracked)
Other
Size: 185 KB
North London Waste Authority
AD07.28 Table of Revisions to the Compulsory Acquisition Roadmap
Other
Size: 155 KB
North London Waste Authority
AD04.04 CA Powers Roadmap (Rev 2 Clean)
Other
Size: 51 KB
Thames Water Utilities Limited and Kennet Properties Limited
Comments submitted in advance of the 6 July hearing
Other
Size: 804 KB
North London Waste Authority
AD04.01 CA Statement of Reasons (Rev 1 Clean)
Other
Size: 650 KB
North London Waste Authority
AD07.24 Indicative Crane Oversailing Radius
Other
Size: 18 MB
North London Waste Authority
AD02.02 Design Code Principles Rev 1
Other
Size: 28 KB
Zayo Group UK Limited
Submission for Deadline 7
Other
Size: 687 KB
North London Waste Authority
AD03.01 Draft DCO (Rev 3 Clean)
Other
Size: 264 KB
North London Waste Authority
AD06.03 Environmental Commitments and Mitigation Schedule (Rev 2 Clean)
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.