The Sizewell C Project

The views expressed in this page do not represent those of the Planning Inspectorate. This page consists of content submitted to the Planning Inspectorate by the public and other interested parties, giving their views of this proposal.

The Sizewell C Project

Received 24 September 2020
From Waldringfield Parish Council

Representation

Waldringfield Parish Council wishes to raise the following issues for the Sizewell C Examination: LOCATION • The project is far too big for the setting and land available. • It is unsuitable for the nationally important AONB. • Climate change and rising sea levels mean that the site will be prone to flooding and is likely to become an island containing vulnerable nuclear reactors. ENVIRONMENTAL IMPACTS • The environmental impact during the construction phase will cause an unacceptable loss and fragmentation of habitats, resulting in reduced biodiversity. • The water levels in the area will be changed, damaging the adjacent fragile ecosystems. • The proposed ‘town’ for workers and enormous spoil heaps will have a devastating impact on nearby protected areas. • Construction noise and vibration will cause serious disturbance to wildlife. • Light pollution during the construction phase will cause disorientation to birds, particularly during the winter months. • There will be an adverse impact on the coastline and its marine environment. • The CO2 produced in the construction phase will take many years to offset. NUCLEAR WASTE • There is a lack of information on how the nuclear waste will be stored, how long the decommissioning phase will take or what will be done with the waste at this stage. • There will be environmental and security threats into the distant future. • No information is provided about the dangerous and long-lived high level waste produced by the reactors. • There is a lack of information on transportation of the nuclear waste. THE ECONOMY • Eyesores, noise, dust and lorry traffic will deter visitors to the coast and the AONB, impacting tourism on which the local economy depends. • It will take many years to entice these visitors back. ACCOMMODATION • There is a need for affordable housing in the area, but the proposal does not provide for that need. • The large residential blocks with car parks and leisure facilities will have a damaging impact on local residents’ quality of life. TRANSPORT • Insufficient justification has been provided for dropping the ‘marine led’ transport option. • The proposed Sizewell Link Road runs too close to many homes and listed buildings. It will be of little use once the power station is built. • The high number of HGVs on the A12 will have a massive impact on the area around Martlesham, which is already congested much of the time. • No account has been taken of the extra traffic that will be generated by the 2,000 new dwellings planned for Brightwell Lakes. • No account has been taken of the extra traffic from the Felixstowe port expansion, impacting the Seven Hills roundabout, the A14 and the Orwell Bridge. • There is no mention of cumulative impacts of overlapping energy projects (such as the East Anglia offshore wind farms). APPLICATION PROCESS • The application is unsuitable for a digital examination process. • Waldringfield Parish Council wishes to endorse the Relevant Representation submitted by Stop Sizewell C.