The Sizewell C Project

The views expressed in this page do not represent those of the Planning Inspectorate. This page consists of content submitted to the Planning Inspectorate by the public and other interested parties, giving their views of this proposal.

The Sizewell C Project

Received 31 August 2020
From Mr Stephen Dorcey

Representation

Moving to the area 16years ago I did realise that C/D was on the cards Times Change. Sellafield closed in 2014 and the storage of Size well B nuclear waste was foisted upon the community I refuse totally to accept EDF's assumption that they have our approval to store the waste from the proposed new build on the same site in the same way.Thereby drastically increasing the potential threat to Suffolkof a major nuclear disaster. In short given the rapidly changing playing field of the renewable energy sector the government must pull the plug on Size well C/D ---------------------------------------- The nuclear waste that will be produced and stored on site for all three reactors( this is including size well b) is a time bomb and a target for terrorism .