The Sizewell C Project

The views expressed in this page do not represent those of the Planning Inspectorate. This page consists of content submitted to the Planning Inspectorate by the public and other interested parties, giving their views of this proposal.

The Sizewell C Project

Received 08 July 2020
From Paul Sutton

Representation

As a member of the engineering community involved with systems (electrical, electronic and programmable electronic systems) used for process control and safety I intend to provide meaningful questioning and commentary where appropriate on the suitability of the design and engineering practices to be followed as part of the necessary process safety review for the plant design. My interest lies in understanding the measures to be followed to ensure that the plant can be shown to be sufficiently low risk and managed through it's operational life so as to pose no concern to the location, the environment and society in general above recognisable tolerable limits.