Progress Power Station

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (6)

Developer's Application (110)

Acceptance (10)

Pre Examination (21)

Examination (199)

Decision (8)

Decided (37)

Date

SourceDescription
Other
Other
Size: 125 KB
Progress Power (Gas Fired Power Station) (Amendment) Order 2016
Other
Size: 329 KB
Mellis Parish Council
Late response to the Department of Business, Energy and Industrial Strategy request for further information of 19 October 2016
Other
Size: 126 KB
Natural England
Response to the Department of Business, Energy and Industrial Strategy request for further information of 19 October 2016
Other
Size: 101 KB
Historic England
Response to the Department of Business, Energy and Industrial Strategy request for further information of 19 October 2016
Other
Size: 505 KB
Department of Business, Energy and Industrial Strategy
Department of Business, Energy and Industrial Strategy request for information from Public Health England
Other
Size: 505 KB
Department of Business, Energy and Industrial Strategy
Department of Business, Energy and Industrial Strategy request for information from Sacha Rossi NATS Safeguarding Office. Request of 19 October 2016
Other
Size: 505 KB
Department of Business, Energy and Industrial Strategy
Department of Business, Energy and Industrial Strategy request for information from Fiona Cairns Suffolk Preservation Society. Request of 19 October 2016
Other
Size: 505 KB
Department of Business, Energy and Industrial Strategy
Department of Business, Energy and Industrial Strategy request John Pitchford Suffolk County Council. Request of 19 October 2016
Other
Size: 505 KB
Department of Business, Energy and Industrial Strategy
Department of Business, Energy and Industrial Strategy request for information from Philip Freeman Clerk to Yaxley Parish Council
Other
Size: 505 KB
Department of Business, Energy and Industrial Strategy
Department of Business, Energy and Industrial Strategy request Lindsay Barker Babergh and Mid Suffolk District Councils. Request of 19 October 2016
Other
Size: 505 KB
Department of Business, Energy and Industrial Strategy
Department of Business, Energy and Industrial Strategy request for information from Martin Barrell Environment Agency. Request of 19 October 2016
Other
Size: 505 KB
Department of Business, Energy and Industrial Strategy
Department of Business, Energy and Industrial Strategy request for information from David Eve Historic England. Request of 19 October 2016
Other
Size: 505 KB
Department of Business, Energy and Industrial Strategy
Department of Business, Energy and Industrial Strategy request for information from Natural England. Request of 19 October 2016
Other
Size: 505 KB
Department of Business, Energy and Industrial Strategy
Department of Business, Energy and Industrial Strategy request for information from Cllr Hilary Butler Acting as Clerk to Mellis Parish Council. Request of 19 October 2016
Other
Size: 363 KB
Progress Power Ltd
Updated copy of Figure 6. This is to replace the Figure 6 provided in Progress Power Limited's application for a non-material change to the Development Consent Order published on 18 August 2016.
Other
Size: 1 MB
Progress Power Ltd
Regulation 7A notice
Other
Size: 81 KB
Public Health England
Late response to Progress Power Limited's application for a non-material change to the development consent order
Other
Size: 293 KB
Cllr Hilary Butler on behalf of Mellis Parish Council
Response to Progress Power Limited's application for a non-material change to the development consent order
Other
Size: 754 KB
Suffolk Preservation Society
Response to Progress Power Limited's application for a non-material change to the development consent order
Other
Size: 178 KB
Yaxley Parish Council
Response to Progress Power Limited's application for a non-material change to the development consent order
Other
Size: 117 KB
Suffolk County Council
Response to Progress Power Limited’s application for a non-material change to the development consent order
Other
Size: 70 KB
Environment Agency
Response to Progress Power Limited’s application for a non-material change to the development consent order
Other
Size: 217 KB
Babergh and Mid Suffolk District Councils
Response to Progress Power Limited’s application for a non-material change to the development consent order
Other
Size: 140 KB
Historic England
Response to Progress Power Limited’s application for a non-material change to the development consent order
Other
Size: 236 KB
NATS Safeguarding
Response to Progress Power Limited’s application for a non-material change to the development consent order.
Other
Size: 3 MB
Natural England
Response to Progress Power Limited's application for a non-material change to the development consent order
Other
Size: 337 KB
Progress Power Limited
Regulation 6 Notice
Other
Size: 244 KB
Progress Power Limited
Covering Letter
Other
Size: 193 KB
Progress Power Limited
Draft Amendment Order
Other
Size: 9 MB
Progress Power Limited
Non Material Change Application
Other
Size: 183 KB
Department for Business, Energy & Industrial Strategy
Application for a reduced consultee list
Other
Size: 30 KB
The Progress Power (Gas Fired Power Station) (Correction) Order 2016
This Order corrects errors and omissions identified in the Progress Power (Gas Fired Power Station) Order 2015, a development consent order made under the Planning Act 2008, following a written request from the applicant under paragraph 1(5)(a) of Schedule 4 to that Act. This order comes into force on 12th July 2016.
Other
Size: 123 KB
Correction Notice dated 11 July 2016, issued by the Secretary of State for Energy and Climate Change
Details of the corrections made by the Secretary of State to the Progress Power (Gas Fired Power Station) Order 2015
Other
Size: 606 KB
Progress Power Limited
Progress Power Limited's Response to the further legal submission (Reg 17 direction) submitted 28 October 2014 by the Eye Airfield Parishes Working group
Other
Size: 47 KB
Common Concern
Comments on responses to ExA's second round of written questions by Common Concern
Other
Size: 357 KB
Suffolk County Council and Mid Suffolk District Council
Comments on responses to ExA's second round of written questions and any further Statements of Common Ground from Suffolk County Council and Mid Suffolk District Council
Other
Size: 69 KB
Notice of Hearing Agenda for 10 - 11 December 2014
Other
Size: 1 MB
Progress Power Limited
Applicant's comments on other parties Deadline 5 submissions
Other
Size: 385 KB
Jessica Flemming
Comments on responses to ExA's second round of written questions and any further Statements of Common Ground by Cllr. Jessica Fleming
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference - GIS Variant (Rev.1). Submitted for Deadline 7
Other
Size: 319 KB
Progress Power Limited
Progress Power Limited's cover letter for deadline 8. Please note that schedule one lists the supporting material for revision 7, Refined application and GIS variant of the draft Development Consent order.
Other
Size: 687 KB
Progress Power Limited
Draft Development Consent Order - Refined application (rev. 1.0, track changed). Please note that the relevant supporting material for the Refined application (rev. 1.0, track changed) of the DCO can be found in schedule one of Progress Power's cover letter for deadline 8 4.
Other
Size: 194 KB
National Grid Electricity Transmission
Written summary of National Grid Electricity Transmission Plc's Oral representation given at the Issue Specific Hearing held 11 December 2014
Other
Size: 3 MB
English Heritage
Responses to Examining Authority's second round of questions by English Heritage
Other
Size: 1 MB
Progress Power Limited
Applicant's cover letter for deadline 6
Other
Size: 164 KB
Progress Power Limited
Progress Power Limited's cover letter for deadline 3. Please note this letter also contains a schedule of the changes to made to the draft Development Consent Order (v4.0).
Other
Size: 216 KB
Environment Agency
Responses to Examining Authority's second round of questions by the Environment Agency
Other
Size: 1,013 KB
Progress Power Limited
Draft Development Consent Order - Refined application (rev. 1.0). Please note that the relevant supporting material for the Refined application (rev. 1.0) of the DCO can be found in schedule one of Progress Power's cover letter for deadline 8 4.
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference - GIS Variant (Rev.1, track changed). Submitted for Deadline 7
Other
Size: 51 KB
Errata sheet for the Secretary of State's Decision Letter and Statement of Reason
Secretary of State for Energy and Climate Change's errata sheet for the Decision Letter and Statement of Reason dated 27 July 2015.
Other
Size: 1 MB
Progress Power Limited
Cover Letter for s.106 Agreement - Received for deadline 8
Other
Size: 19 KB
Other
Size: 146 KB
Decision Letter and Statement of Reason
Revised Decision Letter and Statement of Reason ? please refer to the separately published errata sheet.
Other
Size: 6 MB
Decision Letter and Statement of Reason - Superseded
An updated Secretary of State's Decision Letter and Statement of Reason was published on 19 August 2015
Other
Size: 398 KB
Progress Power (Gas Fired Power Station) Order 2015
Other
Other
Size: 142 KB
Post Examination Correspondence
Correspondence forwarded to the Secretary of State for Energy and Climate Change during the recommendation and decision stage.
Other
Size: 109 KB
Notice of the Decision by the Secretary of State
Other
Size: 67 KB
Notification of Completion of ExA Examination
Other
Size: 51 KB
Transam Trucking Limited
Withdrawal of all of Transam Trucking Limited?s representations in respect of the DCO application
Other
Size: 103 KB
Tobar Group Trading Limited
Withdrawal of all of Tobar Group Limited's representations in respect of the DCO application
Other
Size: 402 KB
Eye Wind Power Limited
Withdrawal of all of Eye Wind Power Limited?s representations in respect of the DCO application
Other
Size: 38 KB
John Farley
Document authenticating the Neolithic Hand Hoe submitted by Mr Farley at the Open Floor Hearing held on 15 October 2014
Other
Size: 6 MB
Progress Power Limited
2.7 Works Plans rev 1. (amended 21 January 2015). This version of the Works Plan contains documents omitted from the version submitted on 19 December 2014 but which are unchanged from the corresponding documents submitted with the original application in March 2014
Other
Size: 134 KB
Progress Power Limited
Progress Power Limited?s errata letter for deadline 6 (5 December 2014)
Other
Size: 71 KB
Changes to the Original Application
Other
Size: 69 KB
Letter to Daniel Poulter MP
Response to Daniel Poulter MP's letter dated 12 January 2015
Other
Size: 7 MB
Daniel Poulter MP
Letter from Daniel Poulter MP
Other
Size: 262 KB
Eye Airfield Parishes Working Group
Summary of submissions to the examination received for deadline 8
Other
Size: 917 KB
Progress Powers Limited
Progress Powers Limited's Respsonse to other parties' Deadline 7 submissions
Other
Size: 469 KB
Suffolk County Council and Mid Suffolk District Council
Summary of submissions to the examination received for deadline 8
Other
Size: 10 MB
Progress Power Limited
Statement of Common Ground between Progress Power Limited, Suffolk County Council and Mid Suffolk District Council. Including updated Construction Environmental Management Plan (CEMP) (rev.3.0) and updated Construction Traffic Management Plan (CTMP) (rev. 4.0)
Other
Size: 223 KB
Environment Agency
Environment Agency?s comments on Power Progress Limited?s summary of oral representations made at the Issue Specific Hearings held on 9, 10 and 11 December 2014 and the Report on the Implications for European Sites
Other
Size: 314 KB
Cllr. Jessica Fleming
Summary of Position received for deadline 8
Other
Size: 2 MB
Progress Power Limited
s.106 agreement between Progress Power Limited, Suffolk County and Mid Suffolk District Councils, Harry Charles Moore and Elizabeth Moore
Other
Size: 1,011 KB
Progress Power Limited
Draft Development Consent Order (rev. 7.0). Please note that the relevant supporting material for revision 7 of the DCO can be found in schedule one of Progress Power?s cover letter for deadline 8 4.
Other
Size: 1,017 KB
Progress Power Limited
Draft Development Consent Order - GIS variant (rev. 1.0). Please note that the relevant supporting material for the GIS variant (rev. 1.0) of the DCO can be found in schedule one of Progress Power?s cover letter for deadline 8 4.
Other
Size: 688 KB
Progress Power Limited
Draft Development Consent Order - GIS variant (rev. 1.0, track changed). Please note that the relevant supporting material for the GIS variant (rev. 1.0, track changed) of the DCO can be found in schedule one of Progress Power?s cover letter for deadline 8 4.
Other
Size: 690 KB
Progress Power Limited
Draft Development Consent Order (rev. 7.0, track changed). Please note that the relevant supporting material for revision 7 of the DCO can be found in schedule one of Progress Power?s cover letter for deadline 8 4.
Other
Size: 1 MB
Progress Power Limited
Explanatory Memorandum (rev. 1.0)
Other
Size: 45 KB
Progress Power Limited
Progress Power Limited?s errata sheet for the Book of Reference submitted for deadline 6 (5 December 2014)
Other
Size: 51 KB
Gordon and David Talbot
Withdrawal of all of Gordon and David Talbot?s representations in respect of the DCO application.
Other
Size: 888 KB
Paul and Eileen Hammond, David Hammond and Richard Hammond
Withdrawal of all of Paul, Eileen, David and Richard Hammond?s representations in respect of the DCO application
Other
Size: 413 KB
Energy Power Resources Limited
Withdrawal of all Energy Power Resources Limited representations in respect of the DCO application.
Other
Size: 342 KB
Progress Power Limited
Progress Power Limited's cover letter regarding updates to the deadline 7 submissions.
Other
Size: 199 KB
Progress Power Limited
Update to annex 1 of Progress Power?s written summary of oral representations made at hearings of 9, 10 and 11 December 2014.
Other
Size: 399 KB
EPR Eye Limited
Withdrawal of all EPR Eye Limited representations in respect of the DCO application.
Other
Size: 3 MB
Progress Power Limited
2.7 Works Plans rev 1. Submitted for Deadline 7
Other
Size: 474 KB
Suffolk County Council and Mid Suffolk District Council
Written summary of Suffolk County Council and Mid Suffolk District Council representations given on 10 and 11 December 2014. Submitted for Deadline 7
Other
Size: 635 KB
Progress Power Limited
Important Hedgerow Plan ? Refined App rev 2. Submitted for Deadline 7
Other
Size: 1 MB
Progress Power Limited
2.8 Rights of Way, Streets and Access Plan rev 1. Submitted for Deadline 7
Other
Size: 177 KB
Progress Power Limited
Cover Letter. Submitted for Deadline 7
Other
Size: 633 KB
Progress Power Limited
Important Hedgerow Plan ? rev 1. Submitted for Deadline 7
Other
Size: 1 MB
Suffolk Preservation Society
Written summary of oral representation given at Issue Specific Hearing held 10 December 2014
Other
Size: 45 KB
Progress Power Limited
Second Issue Specific Hearings Witness CV Booklet. Submitted for Deadline 7
Other
Size: 495 KB
Progress Power Limited
Written summary of oral representations made at hearings of 9, 10 and 11 December 2014. Submitted for Deadline 7
Other
Size: 547 KB
Progress Power Limited
Comments on Deadline 6 Submissions. Submitted for Deadline 7
Other
Size: 629 KB
Progress Power Limited
Important Hedgerow Plan ? GIS Variant rev 1. Submitted for Deadline 7
Other
Size: 321 KB
Eye Airfield Parishes Working Group
Written summary of Eye Airfield Parishes Working Group representations given on 10 and 11 December 2014. Submitted for Deadline 7. N.B an amended version of this document was published on 7 January 2015
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference ? Refined application (Rev.4, track change). Submitted for Deadline 7
Other
Size: 2 MB
Progress Power Limited
Protected Field Boundary Plans presented at Second Issue Specific Hearing. Submitted for Deadline 7
Other
Size: 8 KB
Progress Power Limited
Cover page inserts for ES Appendices. Submitted for Deadline 7
Other
Size: 367 KB
Progress Power Limited
Cultural Heritage Mitigation Table with coverage. Submitted for Deadline 7
Other
Size: 765 KB
Progress Power Limited
Field Boundary Photographs presented at Second Issue Specific Hearings. Submitted for Deadline 7
Other
Size: 27 MB
Progress Power Limited
Statement of Common Ground with Suffolk County Council and Mid Suffolk District Council. Submitted for Deadline 7
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference ? Refined application (Rev.4). Submitted for Deadline 7
Other
Size: 709 KB
Progress Power Limited
Draft Development Consent Order - Refined application. Submitted for Deadline 7
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference (Rev.3, track changed). Submitted for Deadline 7
Other
Size: 722 KB
Progress Power Limited
Draft Development Consent Order - GIS variant (track change). Comparison against 17 November version. Submitted for Deadline 7
Other
Size: 710 KB
Progress Power Limited
Draft Development Consent Order (Rev.6). Submitted for Deadline 7
Other
Size: 711 KB
Progress Power Limited
Draft Development Consent Order - GIS variant. Submitted for Deadline 7
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference (Rev.3). Submitted for Deadline 7
Other
Size: 724 KB
Progress Power Limited
Draft Development Consent Order - Refined application (track changed). Comparison against 17 November version. Submitted for Deadline 7
Other
Size: 724 KB
Progress Power Limited
Draft Development Consent Order (Rev. 6, track change). Submitted for Deadline 7
Other
Size: 19 KB
December Issue Specific Hearing Audio - Part 5
Audio recording of the Issue Specific Hearing held on Thursday 11 December 2014
Other
Size: 178 KB
Report on the Implications for European Sites (RIES)
The Examining Authority?s Report on the Implications for European Sites
Other
Size: 78 MB
December Issue Specific Hearing Audio - Part 3
Audio recording of the Issue Specific Hearing held on Wednesday 10 December 2014 - Part 3
Other
Size: 82 MB
December Issue Specific Hearing Audio - Part 1
Audio recording of the Issue Specific Hearing held on Wednesday 10 December 2014 - Part 1
Other
Size: 83 MB
December Issue Specific Hearing Audio - Part2
Audio recording of the Issue Specific Hearing held on Wednesday 10 December 2014 - Part 2
Other
Size: 76 MB
December Issue Specific Hearing Audio - Part 4
Audio recording of the Issue Specific Hearing held on Wednesday 10 December 2014 - Part 4
Other
Size: 50 MB
December Compulsory Acquisition Hearing Audio
Audio recording of the Compulsory Acquisition Hearing held on Tuesday 9 December 2014
Other
Size: 2 MB
Progress Power Limited
Field boundary plan ? AIS variant
Other
Size: 342 KB
Progress Power Limited
Field boundary plan ? GIS variant
Other
Size: 845 KB
Progress Power Limited
Progress Power?s cover letter for the late deadline 6 submissions. Late submission accepted by the Examining Authority for deadline 6.
Other
Size: 628 KB
Progress Power Limited
Potentially Important Hedgerow Plan - GIS Variant. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 8 MB
Progress Power Limited
5.4 Flood Risk Assessment - GIS Variant. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 4 MB
Progress Power Limited
2.7 Works Plans - GIS Variant. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 496 KB
Progress Power Limited
Appendix A of the outlined construction management plan - AIS Variant (for Refined application). Please see 6.2 Environmental Statement Appendices - Volume H, Appendices 12.D for further information. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference ? Refined application (track changed). Late submission accepted by the Examining Authority for deadline 6
Other
Size: 3 MB
Progress Power Limited
2.10 Outline Lighting Layout (rev. 3.0). Late submission accepted by the Examining Authority for deadline 6
Other
Size: 4 MB
Progress Power Limited
Description to: 2.7 Works Plans - Refined application. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 8 MB
Progress Power Limited
5.4 Flood Risk Assessment (rev. 1.0). Late submission accepted by the Examining Authority for deadline 6
Other
Size: 1 MB
Progress Power Limited
2.8 Rights of Way Street and Access Plan - GIS Variant. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference - GIS Variant. Late submission accepted by the Examining Authority for deadline 6.
Other
Size: 1 MB
Progress Power Limited
2.10 Outline Lighting Layout - GIS Variant. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 4 MB
Progress Power Limited
2.6 Land Plans - GIS Variant. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference - GIS Variant (track change). Late submission accepted by the Examining Authority for deadline 6
Other
Size: 633 KB
Progress Power Limited
Important Hedgerow Plan - Refined application. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 79 KB
Energy Power Resources Limited and EPR Eye Limited - Withdrawn
Letter from Energy Power Resources Limited and EPR Eye Limited confirming that an agreement has been reached in regards of compulsory acquisition. EPR Eye Limited submission withdrawn by letter on 23 December 2014. Energy Power Resources Limited submission withdrawn by letter on 23 December 2014
Other
Size: 277 KB
Eye Wind Power - Withdrawn
Letter from Eye Wind Power regarding powers sought in the order and compulsory acquisition. Submission withdrawn by email on 23 January 2015
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference ? Refined application. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 1 MB
Progress Power Limited
2.8 Rights of Way Street and Access Plan ? Refined application. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 2 MB
Progress Power Limited
2.9 Outline Landscaping Plans (v.2.0). Late submission accepted by the Examining Authority for deadline 6
Other
Size: 2 MB
Progress Power Limited
The Stage 2 written scheme of archaeological Investigation ? (rev. 1.0). Please see 6.2 Environmental Statement Appendices ? Volume I, Appendices 13 C for further information. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 472 KB
Progress Power Limited
Appendix A of the outlined construction management plan ? GIS Variant. Please see 6.2 Environmental Statement Appendices ? Volume H, Appendices 12.D for further information. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 4 MB
Progress Power Limited
2.6 Land Plans - (rev. 1.0) Late submission accepted by the Examining Authority for deadline 6
Other
Size: 2 MB
Progress Power Limited
The Stage 2 written scheme of archaeological Investigation ? GIS Variant. Please see 6.2 Environmental Statement Appendices ? Volume I, Appendices 13 C for further information. Late submission accepted by the Examining Authority for deadline 6
Other
Size: 131 KB
Eye Airfield Parishes Working Group
Additional Representation received for deadline 6 by Eye Airfield Parishes Working Group
Other
Size: 2 MB
Progress Power Limited
Updated Statement of Common Ground between the Applicant, Suffolk County Council and Mid Suffolk District Council
Other
Size: 2 MB
Progress Power Limited
Draft Design Principles Statement submitted by the Applicant for deadline 6
Other
Size: 1 MB
Phil Butler
Other
Size: 78 KB
Revised Notice of Hearing Agenda for 10 - 11 December 2014
Other
Size: 229 KB
National Grid Gas
Withdrawal of all National Grid Gas representations in respect of the DCO application
Other
Size: 232 KB
National Grid Electricity Transmission
Partial withdrawal of National Grid Electricity Transmission representations in respect of the DCO application
Other
Size: 313 KB
Re-assessment of Co-axial Field System Boundaries by Dr Adrian M. Chadwick
A Re-assessment of the Possible Date and Potential Significance of Co-axial Field System Boundaries at Eye and Yaxley, Suffolk
Other
Size: 216 KB
Suffolk County Council and Mid Suffolk District Council
Response to Examining Authority?s Second Questions by Suffolk County Council and Mid Suffolk District Council
Other
Size: 2 MB
Progress Power Limited
Responses to Examining Authority?s second round of questions by Progress Power Limited
Other
Size: 293 KB
Simon J Cairns
Simon J Cairns comments on documents submitted prior to Deadline 5
Other
Size: 3 MB
Progress Power Limited
Progress Power Limited's cover letter for deadline 5. Please note this letter also contains a schedule of the changes to made to the draft Development Consent Order (v6.0)
Other
Size: 330 KB
Suffolk County Council and Mid Suffolk District Council
Suffolk County Council and Mid Suffolk District Council comments on documents submitted prior to Deadline 5
Other
Size: 1 MB
Progress Power Limited - Partly Withdrawn
Updated Statement of Common Ground between Progress Power Ltd and National Grid Electricity Transmission PLC - Submission partly withdrawn via email on 1 December 2014
Other
Size: 8 MB
Suffolk Preservation Society
Responses to Examining Authority?s second round of questions and comments on written summary by Progress Power Ltd relating to their comments on the written representation from Mid Suffolk Council & Suffolk County Council
Other
Size: 828 KB
Progress Power Limited
Progress Power Limited's comments on documents submitted prior to Deadline 5
Other
Size: 203 KB
National Grid Electricity Transmission PLC� Partly withdrawn.
Responses to Examining Authority?s second round of questions and comments on written summaries by National Grid Electricity Transmission PLC Submission partly withdrawn via email on 1 December 2014
Other
Size: 124 KB
Progress Power Limited
Progress Power Limited's response to the Eye Airfield Parishes Working Group Written Representation on Power Generation Plant Design & Transformers
Other
Size: 197 KB
Eye Airfield Parishes Working Group
Responses to Examining Authority?s second round of questions and additional submissions by Eye Airfield Parishes Working Group
Other
Size: 97 KB
Common Concern
Responses to Examining Authority?s second round of questions by Common Concern
Other
Size: 604 KB
Progress Power Limited
Draft Development Consent Order (Rev. 5.0)
Other
Size: 9 MB
Progress Power Limited
Updated Statement of Common Ground between the Applicant, Suffolk County Council and Mid Suffolk District Council, including annexes
Other
Size: 740 KB
Phil Butler
Responses to Examining Authority?s second round of questions
Other
Size: 799 KB
Progress Power Limited
Draft s.106 agreement between Progress Power Limited, Suffolk County and Mid Suffolk District Councils, Harry Charles More and Elizabeth Moore (v3.0)
Other
Size: 569 KB
Progress Power Limited
Draft Development Consent Order (Rev. 5.0, track changed)
Other
Size: 510 KB
Progress Power Limited - Withdrawn
Updated Statement of Common Ground between Progress Power Ltd and National Grid Gas PLC. Submission withdrawn via email on 1 December 2014
Other
Size: 120 KB
Response to Eye Airfield Parishes Working Group dated 14 November 2014
Other
Size: 193 KB
British Horse Society
Guidance for construction near routes used by horses
Other
Size: 2 MB
Prehistoric Society
Other submission by the Prehistoric Society accepted into the examination on 7 November 2014
Other
audio recording
Size: 19 KB
Audio recording Part 4
Audio recording of the Issue Specific Hearing held on Thursday 16 October 2014 - Part 4
Other
audio recording
Size: 93 MB
Audio recording Part 1
Audio recording of the Issue Specific Hearing held on Friday 17 October 2014 - Part 1
Other
audio recording
Size: 69 MB
Audio recording Part 3
Audio recording of the Issue Specific Hearing held on Friday 17 October 2014 - Part 3
Other
audio recording
Size: 63 MB
Audio recording Part 2
Audio recording of the Issue Specific Hearing held on Friday 17 October 2014 - Part 2
Other
audio recording
Size: 91 MB
Audio recording Part 1
Audio recording of the Issue Specific Hearing held on Thursday 16 October 2014 - Part 1
Other
audio recording
Size: 60 MB
Audio recording 2pm
Audio recording of the Open Floor Hearing held at 2.00pm on Wednesday 15 October 2014
Other
audio recording
Size: 24 MB
Audio recording 6pm
Audio recording of the Open Floor Hearing held at 6.00pm on Wednesday 15 October 2014
Other
audio recording
Size: 101 MB
Audio recording Part 3
Audio recording of the Issue Specific Hearing held on Thursday 16 October 2014 - Part 3
Other
audio recording
Size: 46 MB
Audio recording Part 2
Audio recording of the Issue Specific Hearing held on Thursday 16 October 2014 - Part 2
Other
Size: 326 KB
Common Concern
Written summary of Common Concern?s Oral representation given at the open floor hearing
Other
Size: 16 MB
Palgrave Parish Council
Written summary of Palgrave Parish Council?s Oral representation given at the open floor hearing. Please note that the third photo in the submission was taken from Coleman Close and not Church Farm Close as stated in the summary.
Other
Size: 3 MB
Progress Power Limited
Statement of Common Ground between Progress Power Limited and Suffolk County Council & Mid Suffolk District Council
Other
Size: 322 KB
Suffolk County Council and Mid Suffolk County Council.
Joint written summary of Suffolk County Council?s and Mid Suffolk County Council?s Oral representation given at the Issue Specific & Open Floor Hearings.
Other
Size: 868 KB
Progress Power Limited
Draft Development Consent Order (Rev. 4.0)
Other
Size: 254 KB
Progress Power Limited
Progress Power Limited's cover letter for deadline 4. Please note this letter also contains a schedule of the changes to made to the draft Development Consent Order (v5.0)
Other
Size: 237 KB
Eye Airfield Parishes Group
Submission by Eye Airfield Parishes Working Group requesting a Regulation 17 Direction
Other
Size: 180 KB
National Grid Electricity Transmission Plc� Partly withdrawn.
Written summary of National Grid Electricity Transmission Plc?s Oral representation given at the Issue Specific Hearings, including further information requested by the Examining Authority on circuits and power flows. Submission partly withdrawn via email on 1 December 2014
Other
Size: 322 KB
Suffolk County Council and Mid Suffolk County Council.
Joint written summary of Suffolk County Council?s and Mid Suffolk County Council?s Oral representation given at the Issue Specific & Open Floor Hearings.
Other
Size: 2 MB
Progress Power Limited
Written summary of Progress Power Limited's Oral representation given at the Issue Specific Hearings, including appendices
Other
Size: 65 KB
Cllr. Jessica Fleming
Written summary of Cllr. Fleming?s Oral representation given at the Open Floor Hearings on behalf of Suffolk County Council - Hartismere Division
Other
Size: 672 KB
Progress Power Limited
Draft Development Consent Order (Rev. 4.0, track changed)
Other
Size: 137 KB
Eye Airfield Parishes Working Group
Written summary of Eye Airfield Parishes Working Group?s Oral representation given at the Issue Specific Hearings.
Other
Size: 106 KB
141021 EN010060 Notice of hearings and second round of questions
Other
Size: 49 KB
Phil Butler
Written summary of Phil Butler?s Oral representation given at the open floor hearing
Other
Size: 263 KB
John Farley
Information relating to Neolithic Hand Hoe, submitted by My Farley during the open floor hearing - 14:00 on 15 October 2014
Other
Size: 516 KB
Progress Power Limited
Progress Power Limited's response to Eye Airfield Parishes Working Group's letter dated 12 October 2014
Other
Size: 32 KB
Progress Power Limited
Progress Power Limited's errata sheet for the submission submitted for deadline 3 (2 October 2014)
Other
Size: 2 MB
Eye Airfield Parishes Working Group
Correspondence relating to Regulation 17 of the Infrastructure Planning EIA Regulations 2009. This submission also contains Progress Power Limited?s response to the Eye Airfield Parishes Working Group submission dated 2 October 2014
Other
Size: 88 KB
Letter to Eye Airfield Parishes Working Group
Response to the Eye Airfield Parishes Working Group letter dated 2 October 2014
Other
Size: 82 KB
Phil Butler
Comments on Written Representations, Relevant representations, Local Impact Report and Statement of Common Ground by Phil Butler
Other
Size: 577 KB
Eye Airfield Parishes working group
Report into the use of the term Species Poor in the Environmental Statement by Eye Airfield Parishes Working Group
Other
Size: 156 KB
Eye Airfield Parishes Working Group
Questions from the Eye Airfield Parishes Working Group relating to the hearing scheduled for 16 October 2014
Other
Size: 325 KB
Suffolk District Council and Suffolk County Council
Comments by Mid Suffolk District Council and Suffolk County Council on documents submitted for deadline 3
Other
Size: 5 MB
Progress Power Limited
Comments on Local Impact Report, Annexes H by Progress Power Limited
Other
Size: 17 MB
Progress Power Limited
Comments on Local Impact Report, Annexes A-G by Progress Power Limited. Please note appnedix D contains the Report on the Possible Date and Potential Significance of Co-axial Field System Boundaries at Eye and Yaxley, Suffolk
Other
Size: 45 KB
Common Concern
Comments on documents submitted for deadline 3 by Common Concern
Other
Size: 7 MB
Progress Power Limited
Comments on Written Representations by Progress Power Limited
Other
Size: 281 KB
Suffolk District Council and Suffolk County Council
Comments by Mid Suffolk District Council and Suffolk County Council on the Report on the Possible Date and Potential Significance of Co-axial Field System Boundaries at Eye and Yaxley, Suffolk
Other
Size: 1 MB
Progress Power Limited
Comments on Local Impact Report and Statement of Common Ground by Progress Power Limited
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference (Rev. 2, track change).
Other
Size: 661 KB
Progress Power Limited
Draft Development Consent Order (Rev. 3.0, track changed)
Other
Size: 510 KB
Progress Power Limited
Draft s.106 agreement between Progress Power Limited, Suffolk County and Mid Suffolk District Counties, Harry Charles More and Elizabeth Moore (v2.0)
Other
Size: 19 KB
Mervyn Barker
responses to Progress Power limited's comments on relevant representation
Other
Size: 287 KB
Progress Power Limited
Draft s.106 agreement between Progress Power Limited, Suffolk County and Mid Suffolk District Counties, Harry Charles More and Elizabeth Moore (v2.0, track changed)
Other
Size: 604 KB
Progress Power Limited
Plan over Potentially Important Hedgerows submitted by Progress Power Limited for Deadline 3
Other
Size: 556 KB
Progress Power Limited
Draft Development Consent Order (Rev. 3.0)
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference (Rev. 2).
Other
Size: 301 KB
Progress Power Limited, National Grid Gas and National Grid Electricity Transmission - Partly withdrawn
Grid and Gas Connection Update and Clarification document referred to in the Statements of Common Ground between National Grid Electricity Transmission plc , National Grid Gas Plc and Progress Power Limited. National Grid Gas submission was withdrawn via email on 1 December 2014. National Grid Electricity Transmission submission was partly withdrawn via email on 1 December 2014
Other
Size: 108 KB
Notice of Hearing and Site Visit Agendas for 14-17 October 2014
Other
Size: 74 KB
Notification of Hearings and site visit
Other
Size: 2 MB
Prehistoric Society
Other submission by the Prehistoric Society accepted into the examination on 4 September 2014
Other
Size: 1 MB
National Grid Electricity Transmission� Partly withdrawn.
Statement of Common Ground between Progress Power limited and National Grid Electricity Transmission. Submission partly withdrawn via email on 1 December 2014
Other
Size: 92 KB
Paul and Eileen Hammond, David Hammond and Richard Hammond - Withdrawn
Written representation by Eleanor Havers on Behalf of Paul and Eileen Hammond, David Hammond and Richard Hammond. This representation was received after the deadline but accepted into the examination by the Examining Inspector. Submission withdrawn by letter on 23 December 2014
Other
Size: 12 MB
Suffolk Preservation Society
Written representation by Suffolk Preservation Society
Other
Size: 659 KB
National Grid Gas - Withdrawn
Statement of Common Ground between Progress Power limited and National Grid Gas. Submission withdrawn via email on 1 December 2014
Other
Size: 84 KB
Simon Cairns
Written representation by Simon Cairns
Other
Size: 40 KB
Philip Butler
Summary of written representation by Philip Butler
Other
Size: 5 MB
Natural England
Statement of Common Ground between Progress Power limited and Natural England
Other
Size: 2 MB
Progress Power Limited
Responses to first round of questions by Progress Power Limited
Other
Size: 251 KB
Environment Agency
Responses to first round of questions by Environment Agency
Other
Size: 3 MB
Environment Agency
Statement of Common Ground between Progress Power limited and Environment Agency
Other
Size: 124 KB
Common Concern
Written representation by Common Concern
Other
Size: 54 KB
Palgrave Parish Council
Viewpoints suggested by Palgrave Parish Council
Other
Size: 160 KB
National Grid Gas - Withdrawn
Written representation and responses to first round of questions by National Grid gas. Submission withdrawn via email on 1 December 2014
Other
Size: 48 KB
Tracey Jacobs
Written representation by Tracey Jacobs
Other
Size: 655 KB
Mid Suffolk District Council and Suffolk County Council
Joint Local Impact Report by Mid Suffolk District Council and Suffolk County Council
Other
Size: 205 KB
National Grid Electricity Transmissions� Partly withdrawn.
Written representation, response to first round of questions and comments on relevant representations by National Grid Electricity Transmissions. Submission partly withdrawn via email on 1 December 2014
Other
Size: 2 MB
Progress Power Limited
Comments on relevant representations by Progress Power Limited
Other
Size: 1 MB
Progress Power Limited
Applicant?s cover letter for deadline 2. Please note this letter also contains a schedule of the changes to made to the draft Development Consent Order.
Other
Size: 11 MB
Suffolk County Council and Mid Suffolk District Council
Statement of Common Ground between Progress Power limited and Suffolk County Council and Mid Suffolk District Council
Other
Size: 421 KB
Mid Suffolk District Council and Suffolk County Council
Joint response to first round of questions by Mid Suffolk District Council and Suffolk County Council
Other
Size: 145 KB
Eye Airfield Parishes Working Group
Summary of written representation by Eye Airfield Parishes Working Group (comprising Brome and Oakley Parish Council, Mellis Parish Council, Palgrave Parish Council, Thornham Magna Parish Meeting, Thornham Parva Parish Meeting, Thrandeston Parish Council and Yaxley Parish Council)
Other
Size: 1 MB
Suffolk Preservation Society
Summary of written representation by Suffolk Preservation Society
Other
Size: 40 KB
Common Concern
Summary of written representation by Common Concern
Other
Size: 178 KB
National Grid Electricity Transmission� Partly withdrawn.
Summary of written representation by National Grid Electricity Transmissions. Submission partly withdrawn via email on 1 December 2014
Other
Size: 50 KB
British Horse Society
Written representation by British Horse Society
Other
Size: 5 MB
Eye Airfield Parishes Working Group
Written representation by Eye Airfield Parishes Working Group (comprising Brome and Oakley Parish Council, Mellis Parish Council, Palgrave Parish Council, Thornham Magna Parish Meeting, Thornham Parva Parish Meeting, Thrandeston Parish Council and Yaxley Parish Council)
Other
Size: 53 KB
Steven Jacobs
Written representation by Steven Jacobs
Other
Size: 19 KB
Hayley Talbot
Written representation by Hayley Talbot
Other
Size: 160 KB
National Grid Gas - Withdrawn
Written representation and responses to first round of questions by National Grid gas. Submission withdrawn via email on 1 December 2014
Other
Size: 205 KB
National Grid Electricity Transmissions� Partly withdrawn.
Written representation, response to first round of questions and comments on relevant representations by National Grid Electricity Transmissions. Submission partly withdrawn via email on 1 December 2014
Other
Size: 16 KB
Matthew Spence
Written representation by Matthew Spence
Other
Size: 26 KB
Civil Aviation Authority
Written representation by the Civil Aviation Authority
Other
Size: 63 KB
Mike Drew
Written representation by Mike Drew
Other
Size: 12 KB
Common Concern
Viewpoints suggested by Common Concern
Other
Size: 348 KB
Eleanor Havers on behalf of Gordon and David Talbot - Withdrawn
Eleanor Havers on behalf of Gordon and David Talbot. Submission withdrawn by letter on 5 January 2015
Other
Size: 236 KB
Mid Suffolk District Council and Suffolk County Council
Joint written representation by Mid Suffolk District Council and Suffolk County Council
Other
Size: 74 KB
Triodos Renewables (Eye) Limited
Written representation by Triodos Renewables (Eye) Limited
Other
Size: 2 MB
Philip Butler
Written representation by Philip Butler
Other
Size: 12 KB
John Farley
Written representation by John Farley
Other
Size: 98 KB
English Heritage
Written representation by English Heritage
Other
Size: 42 KB
Penny Bullock
Written representation by Penny Bullock
Other
Size: 1 MB
Berwin Leighton Paisner on behalf of Energy Power Resources Limited and EPR Eye Limited - Withdrawn
Written representation by Berwin Leighton Paisner on behalf of Energy Power Resources Limited and EPR Eye Limited. EPR Eye Limited submission withdrawn by letter on 23 December 2014. Energy Power Resources Limited submission withdrawn by letter on 23 December 2014
Other
Size: 83 KB
Progress Power Limited
No significant effects report screening matrices
Other
Size: 67 KB
David Burn
Written Representation by David Burn
Other
Size: 172 KB
Neil Luckett
Written representation by Neil Luckett
Other
Size: 6 MB
Progress Power Limited
Progress Power Limited?s comments relating to the site visit
Other
Size: 45 KB
Brian Guthrie
Written representation by Brian Guthrie
Other
Size: 870 KB
Progress Power Limited
Draft Development Consent Order (Rev. 2.0)
Other
Size: 205 KB
National Grid Electricity Transmissions� Partly withdrawn.
Written representation, response to first round of questions and comments on relevant representations by National Grid Electricity Transmissions. Submission partly withdrawn via email on 1 December 2014
Other
Size: 31 KB
English Heritage
Summary of written representation by English Heritage
Other
Size: 34 KB
Philip Butler
Viewpoints suggested by Philip Butler
Other
Size: 82 KB
Mellis Parish Council
Written representation by Mellis Parish Council
Other
Size: 295 KB
Progress Power Limited
Draft s.106 agreement between Progress Power Limited, Suffolk County and Mid Suffolk District Counties, Harry Charles More and Elizabeth Moore
Other
Size: 559 KB
Progress Power Limited
Draft Development Consent Order (Rev. 2.0, track changed)
Other
Size: 125 MB
Progress Power Limited
Revised photomontage images submitted by Progress Power Limited on the request by Suffolk County Council and Mid Suffolk District Council. This submission was accepted into the examination by the Examining Inspector on 5 September 2014.
Other
Size: 239 KB
Elizabeth Speak
Letter from Elizabeth Speak concerning viewpoints for the site visit
Other
Size: 59 KB
Note of the Preliminary Meeting
Note of the Preliminary Meeting held on 24 July 2014
Other
Size: 137 KB
Rule 8 letter
Other
Size: 81 KB
Examining Authority's First Round of Written Questions
The Examining Authority's First Round of Written Questions accompanying the Rule 8 Letter issued on 4 August 2014
Other
Size: 29 KB
Progress Power Limited
A document detailing proposed amendments to the draft examination timetable, submitted by the applicant during the preliminary meeting. The examining authority will consider this submission when finalising the final examination timetable.
Other
Size: 4 MB
Progress Power Limited
Progress Power Limited cover letter relating to the documents formally accepted by the Examining Authority on the 24 July 2014
Other
Size: 1 MB
BLP Law on behalf of Energy Power Resources Limited and EPR Eye Limited - Withdrawn
Late representation by BLP Law on behalf of Energy Power Resources Limited and EPR Eye Limited submitted during the pre-examination stage and accepted by the Examining Authority. EPR Eye Limited submission withdrawn by letter on 23 December 2014. Energy Power Resources Limited submission withdrawn by letter on 23 December 2014
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference (Rev 1). This document was formally accepted into examination the by the Examining Authority at the Preliminary Meeting held on 24 July 2014 under s89(3) of the Planning Act 2008 (as amended)
Other
Size: 873 KB
Progress Power Limited
Amended Statement of Reason (Rev. 1.0). This document was formally accepted into examination by the Examining Authority at the Preliminary Meeting held on 24 July 2014 under s89(3) of the Planning Act 2008 (as amended)
Other
Size: 3 MB
Progress Power Limited
Environmental Statement Clarification and Errata document. This document was formally accepted into examination the by the Examining Authority at the Preliminary Meeting held on 24 July 2014 under s89(3) of the Planning Act 2008 (as amended)
Other
Size: 954 KB
Progress Power Limited
Amended Statement of Reason (Rev. 1.0, track changed). This document was formally accepted into examination by the Examining Authority at the Preliminary Meeting held on 24 July 2014 under s89(3) of the Planning Act 2008 (as amended)
Other
Size: 45 KB
Progress Power Limited
4.3 Book of Reference (Rev 1, track changed). This document was formally accepted into examination the by the Examining Authority at the Preliminary Meeting held on 24 July 2014 under s89(3) of the Planning Act 2008 (as amended)
Other
Size: 471 KB
Progress Power Limited
Amended Draft Development Consent Order (Rev. 1.0). This document was formally accepted into examination the by the Examining Authority at the Preliminary Meeting held on 24 July 2014 under s89(3) of the Planning Act 2008 (as amended)
Other
Size: 701 KB
Progress Power Limited
Amended Draft Development Consent Order (Rev. 1.0, track changed). This document was formally accepted into examination the by the Examining Authority at the Preliminary Meeting held on 24 July 2014 under s89(3) of the Planning Act 2008 (as amended)
Other
audio recording
Size: 76 MB
Part 1 of the Preliminary Meeting Audio
Audio recording of the Preliminary Meeting held on Thursday 24 July 2014
Other
audio recording
Size: 13 MB
Part 2 of the Preliminary Meeting Audio
Audio recording of the Preliminary Meeting held on Thursday 24 July 2014
Other
Size: 223 KB
Ms Anna Eastgate on behalf of Progress Power Limited, National Grid Gas and National Grid Electricity Transmission - Partly withdrawn
Request to attend Preliminary Meeting on 24 July 2014. National Grid Gas submission was withdrawn via email on 1 December 2014. National Grid Electricity Transmission submission was partly withdrawn via email on 1 December 2014
Other
Size: 195 KB
Palgrave Parish Council
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 134 KB
Mrs Speak
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 32 KB
Brian Guthrie
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 119 KB
John Farley
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 224 KB
Brome and Oakley Parish Council
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 185 KB
Naomi Sunkin on behalf of Tobar Group Trading Limited and Transam Trucking Limited
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 170 KB
Chris Aldous
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 197 KB
David Burn
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 135 KB
Bridget Bloom
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 190 KB
Eye Town Council
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 105 KB
Mellis Parish Council
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 151 KB
Thrandeston Parish Council
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 201 KB
Yaxley Parish Council
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 33 KB
Paul Read
Request to attend Preliminary Meeting on 24 July 2014.
Other
Size: 60 KB
Watt Power Limited
Response to the Planning Inspectorate?s letter of 27 June 2014 relating to resourcing for the Examination stage.
Other
Size: 111 KB
Letter to Progress Power Ltd and Hirwaun Power Ltd re Preliminary Meeting dates
Letter to Progress Power Limited and Hirwaun Power Limited regarding arrangements for the Preliminary Meeting and resourcing during Examination.
Other
Size: 100 KB
Letter to Mr Andrew Stafford re IP status dated 3rd July 2014
Letter to Mr Andrew Stafford in relation to his request to become an interested party under s.102A of the Planning Act 2008.
Other
Size: 138 KB
Progress Power Rule 6 Letter
Other
Size: 12 KB
Nigel Highfell
Late representation submitted during the pre-examination stage and accepted by the Examining Authority
Other
Size: 33 KB
Progress Power Limited
Certificates of compliance with s.56 & s.59 of the Planning Act 2008 and Regulation 13 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Other
Size: 3 MB
10.1 Planning Statement
Other
Size: 581 KB
10.5 Ecological Management Strategy
Other
Size: 7 MB
5.7 No Significant Effects Report
Other
Size: 3 MB
2.7 Works Plans
Other
Size: 12 MB
6.1 Environmental Statement
Other
Size: 13 MB
7.1 Photographs and Photomontages
Other
Size: 1 MB
4.2 Funding Statement
Other
Size: 23 MB
6.3 Environmental Statement Figures - Volume D Figures 13.1 - 14.7
Other
Size: 5 MB
5.4 Flood Risk Assessment
Other
Size: 91 KB
2.3 Not Used
Other
Size: 717 KB
3.2 Explanatory Memorandum
Other
Size: 17 MB
1.3 Copies of Newspaper Notices
Other
Size: 1 MB
7.2 Plan Identifying Locations of Photographs
Other
Size: 24 MB
6.3 Environmental Statement Figures - Volume A Figures 1.1 - 6.7
Other
Size: 680 KB
3.1 Draft Development Consent Order
Other
Size: 1 MB
1.2 Application Form
Other
Size: 3 MB
5.1 Consultation Report
Other
Size: 357 KB
6.2 Environmental Statement Appendices - Volume C Appendix 5.A CHP Report
Other
Size: 448 KB
Other
Size: 4 MB
2.4 Indicative Site Layout Plans
Other
Size: 464 KB
1.1 Introduction to the Applicant
Other
Size: 12 MB
6.2 Environmental Statement Appendices - Volume A Appendices 3.A - 3.B
Other
Size: 23 MB
6.2 Environmental Statement Appendices - Volume I Appendices 13.A - 13.E
Other
Size: 2 MB
6.4 Environmental Statement Non-Technical Summary
Other
Size: 886 KB
5.3 Consultation Report Non-Technical Summary
Other
Size: 1 MB
2.2 Existing Site Layout Plan
Other
Size: 4 MB
10.3 Electrical Connection Siting Report
Other
Size: 281 KB
9.1 Grid Connection Statement
Other
Size: 45 MB
6.2 Environmental Statement Appendices - Volume G Appendices 10.A - 10.C
Other
Size: 1 MB
2.9 Outline Landscaping Plans
Other
Size: 3 MB
6.2 Environmental Statement Appendices - Volume E Appendices 7.A - 7.B
Other
Size: 25 MB
6.3 Environmental Statement Figures - Volume C Figures 11.1 - 11.36
Other
Size: 45 KB
4.3 Book of Reference
Other
Size: 28 MB
10.2 Design and Access Statement
Other
Size: 2 MB
Progress Power Limited
6.4 Updated Environmental Statement Non-Technical Summary Revision 1
Other
Size: 309 KB
9.2 Gas Connection Statement
Other
Size: 49 MB
5.2 Consultation Report Appendices - Volume 2 Appendices 3.N - 4.D
Other
Size: 4 MB
2.1 Location Plan
Other
Size: 2 MB
10.4 Statement of Proposed Heads of Terms for an Agreement Pursuant to s106 of the TCPA 1990
Other
Size: 925 KB
10.6 Landscape Mitigation Strategy
Other
Size: 1 MB
2.8 Rights of Way Streets and Access Plan
Other
Size: 447 KB
5.6 Details of Other Consents and Licences
Other
Size: 4 MB
2.6 Land Plans
Other
Size: 926 KB
4.1 Statement of Reasons
Other
Size: 3 MB
6.2 Environmental Statement Appendices - Volume H Appendices 12.A - 12.I
Other
Size: 195 KB
7.3 Index of Photographs
Other
Size: 12 MB
6.3 Environmental Statement Figures - Volume B Figures 7.1 - 10.1
Other
Size: 48 MB
5.2 Consultation Report Appendices - Volume 1 Appendices 2.A - 3.M
Other
Size: 970 KB
6.2 Environmental Statement Appendices - Volume J Appendix 15.A E and I EMF Assessment
Other
Size: 698 KB
6.2 Environmental Statement Appendices - Volume D Appendices 6.A - 6.D
Other
Size: 896 KB
6.2 Environmental Statement Appendices - Volume B Appendix 4.A Outline CEMP
Other
Size: 33 MB
6.2 Environmental Statement Appendices - Volume F Appendices 8.A - 8.F
Other
Size: 3 MB
2.10 Outline Lighting Layout
Other
Size: 2 MB
2.5 Indicative Elevation Drawings
Other
Size: 349 KB
Covering Letter and Book of Reference Cross Reference Table
Covering letter to application and Book of Reference Cross Reference Table.
Other
Size: 112 KB
Notification of Decision to Accept Application
Other
Size: 536 KB
Other
Size: 11 KB
Waveney and Suffolk Coastal District Councils
Adequacy of Consultation response from Waveney and Suffolk Coastal District Councils
Other
Size: 30 KB
Broads Authority
Adequacy of Consultation response from the Broads Authority
Other
Size: 377 KB
Suffolk County Council and Mid Suffolk District Council
Adequacy of Consultation response from Suffolk County Council and Mid Suffolk District Council
Other
Size: 585 KB
Breckland Council
Adequacy of Consultation response from Breckland Council
Other
Size: 33 KB
Ipswich Borough Council
Adequacy of Consultation response from Ipswich Borough Council
Other
Size: 213 KB
Norfolk County Council
Adequacy of Consultation response from Norfolk County Council
Other
Size: 257 KB
South Norfolk Council
Adequacy of Consultation response from South Norfolk Council
Other
Size: 31 KB
Essex County Council
Adequacy of Consultation response from Essex County Council
Other
Size: 99 KB
140130 EN010060 Reg 9 Replacement List
Other
Size: 7 MB
EN010060 Progress Power Station Scoping Opinion
Other
Size: 60 KB
130617 Norfolk County Council Late Response
Additional response to the Scoping Consultation, received after the deadline.
Other
Size: 49 KB
130618 Highways Agency Late Response
Response to the Scoping Consultation, received after the deadline.
Other
Size: 191 KB
130619 Essex & Suffolk Water Late Response
Response to the Scoping Consultation, received after the deadline.
Other
Size: 10 MB
EN010060 Scoping Report