Received 20 August 2018
From James Bellingall

Representation

A large amount of Norfolk causing years of disruption to traffic will be caused by the digging of 2 enormous trenches for the feeds from the wind farms to their connections into the National Grid. The fact that these feeds cross near to Reepham means that the amount of disruption would be less if the connection points were swopped over. The total length of the combined trenches would be reduced by between 20 and 30 Kms.