Millbrook Power

You can filter the results to show only the items that match your interest.

Date

SourceDescription
Other
Millbrook Power Limited (PDF, 6 MB)
2.6 Works Plans Rev 1 FINAL
Other
Millbrook Power Limited (PDF, 4 MB)
2.5 Land Plans Rev 1 FINAL
Other
Millbrook Power Limited (PDF, 4 MB)
2.7 Access Plans Rev 1 FINAL
Other
Millbrook Power Limited (PDF, 5 MB)
2.3 Indicative Layout Plans Rev 1 FINAL
Other
Millbrook Power Limited (PDF, 10 MB)
2.1 Site Location Plan Low RES FINAL
Other
Millbrook Power Limited (PDF, 1 MB)
2.2 Existing Site Layout Plan Rev D FINAL
Other
Millbrook Power Limited (PDF, 1 MB)
3.1 DCO Rev 3 Clean FINAL
Other
Millbrook Power Limited (PDF, 413 KB)
3.2 DCO Explanatory Memorandum Tracked Rev 2 FINAL
Other
Millbrook Power Limited (PDF, 2 MB)
3.2 DCO Explanatory Memorandum Clean Rev 2 FINAL
Other
Millbrook Power Limited (PDF, 1 MB)
3.1 DCO Rev 3 Tracked FINAL
Other
Millbrook Power Limited (PDF, 561 KB)
4.1 Statement of Reasons Clean Rev 1 FINAL
Other
Millbrook Power Limited (PDF, 33 KB)
4.3 Book of Reference Rev 2 TRACKED FINAL
Other
Millbrook Power Limited (PDF, 33 KB)
4.3 Book of Reference Rev 2 CLEAN FINAL
Other
Millbrook Power Limited (PDF, 617 KB)
4.1 Statement of Reasons Tracked Rev 1 FINAL
Other
Millbrook Power Limited (PDF, 202 KB)
Schedule of Amendments at Deadline 5
Other
Millbrook Power Limited (PDF, 335 KB)
Draft S106 Agreement (Deadline 5 Submission Version) FINAL
Other
Millbrook Power Limited (PDF, 163 KB)
Millbrook Power Limited Deadline 5 Covering Letter
Other
Millbrook Power Limited (PDF, 896 KB)
MPL Outline CEMP Revision 2 for Deadline 5 FINAL
Other
Network Rail (PDF, 83 KB)
Network Rail's response to deadline 5