East Anglia TWO Offshore Windfarm

The views expressed in this page do not represent those of the Planning Inspectorate. This page consists of content submitted to the Planning Inspectorate by the public and other interested parties, giving their views of this proposal.

East Anglia TWO Offshore Windfarm

Received 22 January 2020
From Antonia Owen

Representation

Dear Examining Authority RE: EAST ANGLIA NORTH ONE (and EAST ANGLIA TWO) I wish to object to this ScottishPower Renewables planning application for the following reasons: * The unsuitability and fragility of Thorpeness Cliffs as a site for landing cables * The utilisation of unspoilt countryside at Friston for substation complexes the size of Wembley Stadium * Substations dangerously close to a small village liable to flooding * 11Km of cable trenches destroying environmentally sensitive areas * Cable trenches and haul roads close to residential homes * The consequent threat to wildlife in general and to the Sandlings Heath and the Minsmere Bird Reserve; the severance of the Suffolk Coast and Heaths areas of outstanding natural beauty will cause problems to migrating species * The destruction of ancient woodland and ancient habitats * The local road network unsuitable for high traffic levels and heavy goods vehicles * Light and noise pollution * Increased traffic on roads, destroying rural tranquillity, increasing air pollution and representing a danger to cyclists and local residents * Major detrimental impact on tourism with loss of visitor income, trade and jobs leading to social and economic decline * Both permanent and temporary closure and/or destruction of public footpaths, bridleways, byways and cycle paths, including peaceful and attractive dog-walking areas Yours Antonia Owen