East Anglia TWO Offshore Windfarm

The views expressed in this page do not represent those of the Planning Inspectorate. This page consists of content submitted to the Planning Inspectorate by the public and other interested parties, giving their views of this proposal.

East Anglia TWO Offshore Windfarm

Received 20 January 2020
From David Copp

Representation

My objections to the application relate primarily to the siting of the onshore substation in Friston when a site nearer to the coast (and ideally adjoin the Sizewell power station complex) would cause far less disruption both to the countryside and during the construction process. I have watched the continuing disruption caused in constructing the cable line from Bawdsey to Bramford and am amazed at how disruptive this has been and how long it has all taken. It is rumoured that if the substation at Friston is built, other similar installations will follow. IS this true?