Triton Knoll Electrical System

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Pre Application (4)

Developer's Application (140)

Acceptance (13)

Pre Examination (30)

Examination (563)

Decision (32)

Decided (2)

Date

SourceDescription
Other
Size: 10 KB
Secretary of State’s Correction Slip
Correction Slip to the Explanatory Note on The Triton Knoll Electrical System Order 2016
Other
Size: 126 KB
Triton Knoll Electrical System Correction Order of 23 March 2017
Other
Size: 131 KB
Triton Knoll Electrical System Correction Notice of 23 March 2017
Other
Size: 2 MB
Examining Authority Recommendation Report
Other
Size: 109 KB
Notice of the Decision by the Secretary of State (Reg 23)
Other
Size: 5 MB
Post Examination Correspondence Log
Other
Size: 681 KB
Development Consent Order made by the Secretary of State
Other
Size: 920 KB
Habitats Regulations Assessment
Other
Size: 2 MB
Examining Authority Recommendation Report Appendix A - D
Other
Size: 275 KB
Secretary of State’s Decision Letter which includes the Statement of Reasons
Other
Size: 376 KB
Triton Knoll Offshore Wind Farm Limited
Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 82 KB
Crown Estate
Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 4 of Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 240 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 2 of Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 20 KB
NFU
Further Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 564 KB
Western Power Distribution
Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 134 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 3 of Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 39 KB
Anglian Water
Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 15 KB
Edna Smithson Whitehead
Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 168 KB
Lincolnshire County Council
Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 39 KB
Natural England
Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 137 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 1 of Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 7 MB
NFU
Response to the letter from the Department for Business, Energy and Industrial Strategy issued 1 August 2016
Other
Size: 234 KB
Triton Knoll Offshore Wind Farm Limited
Letter from Applicant to BEIS giving update on progress
Other
Size: 209 KB
BEIS Consultation Letter
Letter from the Department for Business, Energy and Industrial Strategy requesting Comments on the Application
Other
Size: 222 KB
Triton Knoll Offshore Wind Farm Limited
Request from the Applicant to amend the draft Development Consent Order
Other
Size: 110 KB
Triton Knoll Offshore Wind Farm Limited
Response to Internal Drainage Board's representations on form of Restrictive Covenant. Appendix 31 of Submission for Deadline 4 of 5 January 2016
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Revised draft Development Consent Order and Deemed Marine Licence - Comparison of Revision B and Revision E. Appendix 17 of Submission for Deadline 4 of 5 January 2016
Other
Size: 37 KB
National Grid Gas Plc (NGG) and National Grid Electricity Transmission Limited (NGET)
Clarification on Article 4 direction in relation to Bicker Fen substation and Withdrawal of representations - This submission was received before the close of examination and accepted at the discretion of the Examining Authority
Other
Size: 81 KB
DDM Agriculture Limited on behalf various landowners and occupiers
Withdrawal of representations from the following parties: J F Rowson & Sons (Farmers) Ltd; R J Riggall & Ms S M Bunn; F H Riggall; J R M Mackinder & Mrs J M Mackinder; C H Smithson-Whitehead; Mrs E M Smithson-Whitehead; D R N Taylor, B E Taylor & C G Taylor; A M Walker; D G Middleton; D M Simpson; I Chamberlain; C G Banham & E M Banham; B P Ward, Miss A Ward & Miss V L Ward; R W Banham; Langham House Farm (Alford) Ltd; A J Spence & Mrs T E Spence; M McNamee; Paul Amott Retirement Benefits Scheme; E Culpin & Mrs M Culpin; Mrs S M Ward D H Schofield - Accepted at the discretion of the Examining Authority
Other
Size: 763 KB
Boston Borough Council
Update on Boston Borough Council?s position and withdrawal of its request to the ExA for an Article 4 Direction in relation to the Bicker Fen Electricity Substation - Accepted at the discretion of the Examining Authority
Other
Size: 562 KB
Osborne Clarke LLP on behalf of Western Power Distribution
Confirmation that the Protective Provisions, as shown within the Applicant's final draft Development Consent Order [REP7-018] are agreed between WPD and the Applicant - Accepted at the discretion of the Examining Authority
Other
Size: 62 KB
DCFM Quotas Ltd on behalf of Nicholas Benjamin Hall & Evelyn Hall
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 17 MB
Triton Knoll Offshore Wind Farm Limited
Applicants response to Deadline 8 submissions. This submission was received before the close of examination and accepted at the discretion of the Examining Authority
Other
Size: 43 KB
J B Boulton on behalf of C.P. Sharpe and Sons
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 68 KB
Notification of Completion of ExA Examination
Other
Size: 12 KB
W Edward Golland on behalf of John Stephenson & Messrs. JS (Farms) Ltd
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 372 KB
Brown & Co on behalf of J W Grant CO
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 130 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 7 - Statements of Common Ground Summary and Index - Submission for Deadline 8 of 29 February 2016
Other
Size: 427 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 16 - Figure 1 of the Applicant's Response to the Land Interest Groups - Response to Deadline 6 - Submission for Deadline 8 of 29 February 2016
Other
Size: 11 KB
W Edward Golland on behalf of Messrs JS (Farms) Ltd
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 1 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 11 - Statement of Common Ground between Triton Knoll Offshore Windfarm Limited and Lincolnshire County Council - Submission for Deadline 8 of 29 February 2016
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 8 - Statement of Common Ground between Triton Knoll Offshore Wind Farm Limited and Black Sluice Internal Drainage Board, Lindsey Marsh Drainage Board and Witham Fourth District Internal Drainage Board - Submission for Deadline 8 of 29 February 2016
Other
Size: 346 KB
Brown & Co on behalf of E A Dring Farms Ltd
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 157 KB
National Farmers Union and Lincolnshire Association of Agricultural Valuers
Response to Rule 17 issued 23 February 2015- Submission for Deadline 8 of 29 February 2016
Other
Size: 104 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 10 - Joint Statement from Triton Knoll Offshore Windfarm and Network Rail - Submission for Deadline 8 of 29 February 2016
Other
Size: 60 KB
Brown & Co on behalf of E Clayton & Sons
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 342 KB
Brown & Co on behalf of R Gadd & J Gadd
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 284 KB
Savills (UK) Limited on behalf of Trustees of the Harley Foundation
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 124 KB
Escritt Barrell Golding on behalf of W N B George
Response to Rule 17 issued 23 February 2016 - Submission for Deadline 8 of 29 February 2016
Other
Size: 183 KB
Willsons Chartered Surveyors on behalf of Richard & Nicola Yeadon
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 98 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 15 - LCGM Site E Field 6 Mitigation Update Note - Submission for Deadline 8 of 29 February 2016
Other
Size: 63 KB
Lincolnshire County Council
Response to the Examining Authorities final questions- Submission for Deadline 8 of 29 February 2016
Other
Size: 40 KB
Witham Fourth District Internal Drainage Board
Update on Heads of Terms- Submission for Deadline 8 of 29 February 2016
Other
Size: 49 KB
Willsons Chartered Surveyors on behalf of their clients
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 375 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 4 - The Applicants response to Lincolnshire County Councils response to Deadline 6 - Submission for Deadline 8 of 29 February 2016
Other
Size: 348 KB
Brown & Co on behalf of A E Lenton
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 68 KB
Savills (UK) Limited on behalf of The President and Scholars of The College of Saint Mary Magdalen in The University of Oxford
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 68 KB
Savills (UK) Limited on behalf of Messrs M & R Dobson
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 94 KB
Anglian Water
Response to Rule 17 issued 23 February 2015 - Submission for Deadline 8 of 29 February 2016
Other
Size: 728 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 3 - Crown Estate Commissioners and HEHRE 'Non-impediment' letters relating to land acquisition - Submission for Deadline 8 of 29 February 2016
Other
Size: 228 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 2 - Updated Schedule of Compulsory Acquisition - Submission for Deadline 8 of 29 February 2016
Other
Size: 178 KB
Neil Booth
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 793 KB
Brown & Co on behalf of R Emerson, GH Emerson & Son and J & R Emerson
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 93 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 5 - Response to Mr Hand's Submission for Deadline 6 - Submission for Deadline 8 of 29 February 2016
Other
Size: 8 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 14 - CA 4.1 Letters to landowners - Submission for Deadline 8 of 29 February 2016
Other
Size: 67 KB
Natural England
Comments on documents received for Deadline 6 and 7 - Submission for Deadline 8 of 29 February 2016
Other
Size: 366 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 9 - Joint Statement between Triton Knoll Offshore Windfarm Limited and Canal and River Trust - Submission for Deadline 8 of 29 February 2016
Other
Size: 56 KB
Bidwells on behalf of C W Parker (Wainfleet) Ltd
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 331 KB
Triton Knoll Offshore Wind Farm Limited
The Applicant's Response to Deadline 8 - Submission for Deadline 8 of 29 February 2016
Other
Size: 234 KB
Environment Agency
Final submission- Submission for Deadline 8 of 29 February 2016
Other
Size: 484 KB
Lincolnshire Wildlife Trust
Response to Rule 17 issued 23 February 2015- Submission for Deadline 8 of 29 February 2016
Other
Size: 447 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 12 - Response to Lincolnshire County Council Matters Not Agreed - Submission for Deadline 8 of 29 February 2016
Other
Size: 38 KB
Jas Martin & Co on behalf of the Diocese of Southwell and Nottingham
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 123 KB
Triton Knoll Offshore Wind Farm Limited
The Applicant's Response to Deadline 8 - Covering Letter - Submission for Deadline 8 of 29 February 2016
Other
Size: 79 KB
Fisher German LLP on behalf of their clients
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 98 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 6 - Written Representation Response to Burgh le Marsh Town Council - Submission for Deadline 8 of 29 February 2016
Other
Size: 358 KB
Brown & Co on behalf of R Firth, A Firth, E Bettinson, M Bettinson & S Bettinson
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 48 KB
Triton Knoll Offshore Wind Farm Limited and National Grid Gas Plc (NGG), National Grid Electricity Transmission Limited (NGET)
Joint statement - Submission for Deadline 8 of 29 February 2016
Other
Size: 84 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 13 - Joint Statement from Triton Knoll Offshore Windfarm and National Grid - Submission for Deadline 8 of 29 February 2016
Other
Size: 1 MB
Brown & Co on behalf of S J Lunn & K N Grant
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 344 KB
Brown & Co on behalf of D Grant
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 203 KB
Witham Fourth District Internal Drainage Board
Comments on documents received for Deadline 6 and 7- Submission for Deadline 8 of 29 February 2016
Other
Size: 828 KB
The Crown Estate
Confirming agreement of terms - Submission for Deadline 8 of 29 February 2016
Other
Size: 74 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 1 - Schedule of DCO Amendments for Deadline 8 - Explanatory Document - Submission for Deadline 8 of 29 February 2016
Other
Size: 11 KB
Chris Banham
Comments on documents received for Deadline 6 and 7- Submission for Deadline 8 of 29 February 2016 (Representation now withdrawn)
Other
Size: 180 KB
Brown & Co on behalf of Administrators of A G W Fixter Deceased/F W Fixter & Son
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 539 KB
Western Power Distribution Plc
In respect of Protective Provisions- Submission for Deadline7 of 24 February 2016
Other
Size: 342 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 35 - Outline Construction Environmental Management Plan (Revision B) - Submission for Deadline 7 of 24 February 2016
Other
Size: 516 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 45 - Update on the Statement of Common Ground between Triton Knoll Offshore Wind Farm Limited and the IDBs - Submission for Deadline 7 of 24 February 2016
Other
Size: 45 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 48 - Book of Reference BoR Revision C comparison document - Submission for Deadline 7 of 24 February 2016
Other
Size: 48 KB
East Lindsey District Council
Response to Rule 17 issued 23 February 2016- Early Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 980 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 14 - Final Draft Development Consent Order and Deemed Marine Licence Comparison of Revision A and Revision G - Submission for Deadline 7 of 24 February 2016
Other
Size: 7 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 25 - Outline Landscape Strategy and Ecology Management Plan (Revision D) - Submission for Deadline 7 of 24 February 2016
Other
Size: 342 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 18 - Updated Schedule of Compulsory Acquisition - Submission for Deadline 7 of 24 February 2016
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 9 - Applicant's Final Draft Development Consent Order and Deemed Marine Licence - Revision G - Submission for Deadline 7 of 24 February 2016
Other
Size: 8 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 5 - Hedgerow Plans - Submission for Deadline 7 of 24 February 2016
Other
Size: 5 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 27 - Outline Onshore Written Scheme of Investigation (Revision B) - Submission for Deadline 7 of 24 February 2016
Other
Size: 963 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 12 - Final Draft Development Consent Order and Deemed Marine Licence Comparison of Revision F and Revision G - Submission for Deadline 7 of 24 February 2016
Other
Size: 168 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 34 - Comparision Outline Pollution Prevention and Emergency Incident ResponseSubmission for Deadline 7 of 24 February 2016 Plan (Revision A - Revision C) -
Other
Size: 483 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 36 - Comparision Outline Outline Construction Environmental Management Plan (Revision A - Revision B) - Submission for Deadline 7 of 24 February 2016
Other
Size: 148 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 20 - Updated Funding Statement - Comparison document - Submission for Deadline 7 of 24 February 2016
Other
Size: 363 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 43 - Statements of Common Ground Summary and Index - Submission for Deadline 7 of 24 February 2016
Other
Size: 74 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 41 - Updated Protective Provisions Status - Submission for Deadline 7 of 24 February 2016
Other
Size: 124 KB
Triton Knoll Offshore Wind Farm Limited
Triton Knoll Electrical System - Covering letter - Submission for Deadline 7 of 24 February 2016
Other
Size: 638 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 22 - Updated Statement of Reasons - Comparison of Revision C with Revision B - Submission for Deadline 7 of 24 February 2016
Other
Size: 964 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 24 - Comparison Outline Code of Construction Practice (Revision A - Revision B) - Submission for Deadline 7 of 24 February 2016
Other
Size: 4 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 42 - Theoretical Drainage Design Plans (Examples 10 - 14) - Submission for Deadline 7 of 24 February 2016
Other
Size: 175 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 17 - Final Plan of Plans - Submission for Deadline 7 of 24 February 2016
Other
Size: 466 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 38 - Comparison Outline Communications Plan (Revision A - Revision B) - Submission for Deadline 7 of 24 February 2016
Other
Size: 21 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 2 - Works Plans - Submission for Deadline 7 of 24 February 2016
Other
Size: 980 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 13 - Final Draft Development Consent Order and Deemed Marine Licence Comparison of Revision B and Revision G - Submission for Deadline 7 of 24 February 2016
Other
Size: 97 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 16 - Development Consent Order Schedule of Amendments Explanatory Document -Submission for Deadline 7 of 24 February 2016
Other
Size: 8 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 4 - Public Rights of Way Plans -Submission for Deadline 7 of 24 February 2016
Other
Size: 205 KB
Natural England
Comments on the RIES -Submission for Deadline 7 of 24 February 2016
Other
Size: 30 KB
Boston Borough Council
Response to Rule 17 issued 23 February 2016- Early Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 95 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 15 - Development Consent Order Schedule of Amendments - Submission for Deadline 7 of 24 February 2016
Other
Size: 191 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 31 - Outline Soil Management Plan (Revision E) - Submission for Deadline 7 of 24 February 2016
Other
Size: 10 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 29 - Outline Construction Method Statement - Revision E - Submission for Deadline 7 of 24 February 2016
Other
Size: 10 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 30 - Comparison Outline Construction Method Statement (Revision A - Revision E) - Submission for Deadline 7 of 24 February 2016
Other
Size: 17 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 6 - Crossing Schedule - Submission for Deadline 7 of 24 February 2016
Other
Size: 125 KB
Triton Knoll Offshore Wind Farm Limited
The Applicant's Response to Deadline 7 - Submission for Deadline 7 of 24 February 2016
Other
Size: 11 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 7 - Land Plans and Crown Land Plans - Submission for Deadline 7 of 24 February 2016
Other
Size: 19 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 1 - Order Limits Plans- Submission for Deadline 7 of 24 February 2016
Other
Size: 914 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 23 - Outline Code of Construction Practice (Revision B - Submission for Deadline 7 of 24 February 2016
Other
Size: 293 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 37 - Outline Communications Plan (Revision B) - Submission for Deadline 7 of 24 February 2016
Other
Size: 192 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 11 - Updated Explanatory Memorandum - Revision B - Submission for Deadline 7 of 24 February 2016
Other
Size: 5 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 28 - Comparison Outline Onshore Written Scheme of Investigation (Revision A - Revision B) - Submission for Deadline 7 of 24 February 2016
Other
Size: 23 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 8 - Has not been uploaded as it is in Word and is identical to Appendix 9. Appendix 10- This document has not been submitted
Other
Size: 1 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 39- Mitigation Strategy Document (Revision C) - Submission for Deadline 7 of 24 February 2016
Other
Size: 389 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 46 - Joint Statement between Triton Knoll Offshore Wind Farm Limited and the Environment Agency - Submission for Deadline 7 of 24 February 2016
Other
Size: 795 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 40- Comparison Mitigation Strategy Document (Revison A - Revision C) - Submission for Deadline 7 of 24 February 2016
Other
Size: 148 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 19 - Updated Funding Statement - Submission for Deadline 7 of 24 February 2016
Other
Size: 8 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 3 - Access to Works and Streets Plans - Submission for Deadline 7 of 24 February 2016
Other
Size: 239 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 32 - Comparison Outline Soil Management Plan (Revision A - Revision E) - Submission for Deadline 7 of 24 February 2016
Other
Size: 46 KB
Witham Fourth District Internal Drainage Board
Response to Rule 17 issued 23 February 2016- Early Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 45 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 47 - Book of Reference BoR Revision C - Submission for Deadline 7 of 24 February 2016
Other
Size: 3 MB
Lindsay Marsh Drainage Board, Witham Fourth District Internal Drainage Board and Black Sluice Internal Drainage Board
Letters of Consent to the disapplication of legislative provisions in respect of the Triton Knoll Electrical System- Submission for Deadline 7 of 24 February 2016
Other
Size: 335 KB
Marine Management Organisation
Response to Rule 17 issued 23 February 2016- Early Submission for Deadline 8 accepted at the discretion of the Examining Authority
Other
Size: 64 KB
National Grid Gas Plc (NGG) and National Grid Electricity Transmission Limited (NGET)
Deadline 7 update - Submission for Deadline 7 of 24 February 2016
Other
Size: 7 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 26 - Comparison Outline Landscape Strategy and Ecological Management Plan (Revision A - Revision D) - Submission for Deadline 7 of 24 February 2016
Other
Size: 127 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 33 - Outline Pollution Prevention and Emergency Incident Response Plan (Revision C) - Submission for Deadline 7 of 24 February 2016
Other
Size: 815 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 21 -Updated Statement of Reasons - Revision C - Submission for Deadline 7 of 24 February 2016
Other
Size: 1 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 44 - Joint Statement between Triton Knoll Offshore Wind Farm Limited and ConocoPhillips UK Limited - Submission for Deadline 7 of 24 February 2016
Other
Size: 285 KB
Masons on behalf of BJ & KV Wright and Malcolm Wrisdale Ltd
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 47 KB
Brown & Co on behalf of Bishop Farm Partners
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 47 KB
Brown & Co on behalf of Terra Estate Gmbh & Co KG
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 47 KB
Brown & Co on behalf of Barleyred Farming
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 239 KB
Brown & Co on behalf of B Bush & Sons
Withdrawal of representation- Accepted at the discretion of the Examining Authority
Other
Size: 111 KB
Jonathan Carroll
Submission in relation to the draft Development Consent Order (DCO) for the Triton Knoll Offshore Wind Farm on behalf of a non-interested party - Accepted at the discretion of the Examining Authority
Other
Size: 168 KB
Rule 17 and 8(3) Letter
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 15- Comparison Outline Traffic Management Plan (Revision A - Revision B) Final - Submission for Deadline 6 of 17 February 2016
Other
Size: 4 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 13- Comparison Outline Access Management Plan (Revision A - Revision B) - Submission for Deadline 6 of 17 February 2016
Other
Size: 314 KB
Natural England
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 151 KB
Roger Wardle Consultancy
Response to the Examining Authority?s Third Questions- Late Submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 115 KB
Lincolnshire County Council
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 35 KB
Burgh le Marsh Town Council
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 422 KB
WPD
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 252 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 11- Comparison Outline Soil Management Plan (Revision A - Revision D) - Submission for Deadline 6 of 17 February 2016
Other
Size: 36 KB
East Lindsey District Council
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 353 KB
Triton Knoll Offshore Wind Farm Limited
The Applicant?s Response to Deadline 6- Submission for Deadline 6 of 17 February 2016
Other
Size: 215 KB
Boston Borough Council
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 7 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 16- Outline Landscape Strategy and Ecological Management Plan (Revision C) - Submission for Deadline 6 of 17 February 2016
Other
Size: 45 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 4 -Book of Reference (BoR) - Revision B Comparison document - Submission for Deadline 6 of 17 February 2016
Other
Size: 44 KB
Witham Fourth District Internal Drainage Board
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 541 KB
Graham Hand on behalf of Hand Bros
Comments on ExA?s consultation draft DCO- Submission for Deadline 6 of 17 February 2016
Other
Size: 232 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 2 - Updated Schedule of Compulsory Acquisition - Submission for Deadline 6 of 17 February 2016
Other
Size: 232 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 10- Outline Soil Management Plan (Revision D) - Submission for Deadline 6 of 17 February 2016
Other
Size: 110 KB
Triton Knoll Offshore Wind Farm Limited
Covering Letter - Submission for Deadline 6 of 17 February 2016
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 14- Outline Traffic Management Plan (Revision B) - Submission for Deadline 6 of 17 February 2016
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 18- Joint statement between The Applicant and the LIG - Submission for Deadline 6 of 17 February 2016
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 6- Statement of Common Ground between Triton Knoll Offshore Wind Farm Limited and Anglian Water Services Limited - Submission for Deadline 6 of 17 February 2016
Other
Size: 884 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 21- The Applicant?s Response to NFU and LAAV Representations to Deadline 5 (Hearing Summary - Local Impacts) - Submission for Deadline 6 of 17 February 2016
Other
Size: 375 KB
Marine Management Organisation
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 7 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 17- Comparison Outline Landscape Strategy and Ecological Management Plan (Revision A - Revision C) - Submission for Deadline 6 of 17 February 2016
Other
Size: 363 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 5 -Statements of Common Ground Summary and Index - Submission for Deadline 6 of 17 February 2016
Other
Size: 214 KB
National Farmers Union and Lincolnshire Association of Agricultural Valuers
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 115 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 20- The Applicant?s Response to NFU and LAAV Representations to Deadline 5 (Hearing Summary - Compulsory Acquisition) - Submission for Deadline 6 of 17 February 2016
Other
Size: 94 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 22- The Applicant?s response to Andrew Spence?s response to Deadline 5 - Submission for Deadline 6 of 17 February 2016
Other
Size: 23 KB
Historic England
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 114 KB
Anglian Water
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 363 KB
Environment Agency
Letter of consent under s150 Planning Act 2008- Late Submission for Deadline 6 accepted at the discretion of the Examining Authority
Other
Size: 4 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 12- Outline Access Management Plan (Revision B) - Submission for Deadline 6 of 17 February 2016
Other
Size: 172 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 1 -Applicant?s comments on the ExA consultation draft DCO - Submission for Deadline 6 of 17 February 2016
Other
Size: 80 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 7 - Update of progress for Protective Provisions - Submission for Deadline 6 of 17 February 2016
Other
Size: 371 KB
Lincolnshire Wildlife Trust
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 45 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 3 -Book of Reference (BoR) - Revision B - Submission for Deadline 6 of 17 February 2016
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 9- Comparison Outline Construction Method Statement (Revision A - Revision D) - Submission for Deadline 6 of 17 February 2016
Other
Size: 1 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 19- The Applicants response to Lincolnshire County Councils response to Deadline 5 - Submission for Deadline 6 of 17 February 2016
Other
Size: 62 KB
Trinity House
Response to the Examining Authority?s Third Questions- Submission for Deadline 6 of 17 February 2016
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 8 -Outline Construction Method Statement (Revision D) - Submission for Deadline 6 of 17 February 2016
Other
Size: 1,012 KB
Andrew Spence
Post hearing comments. Late Submission for Deadline 5 accepted at the discretion of the Examining Authority (Representation now withdrawn)
Other
Size: 694 KB
Report on the Implications for European Sites
Report on the Implications for European Sites (RIES) published by the Examining Authority on 10 February 2016.
Other
Size: 73 KB
Notification of third round written questions
Letter issued by the Examining Authority notifying third round written questions, issuing of Examining Authority's consultation Development Consent Order and Report on the Implications for European Sites
Other
Size: 112 KB
Examining Authority's consultation draft Development Consent Order
Schedule of ExA's recommended amendments to the Applicant's draft DCO version F
Other
Size: 260 KB
Examining Authority's third written questions
Other
Size: 10 MB
Lincolnshire County Council
Written summary of the oral representation made at the hearings. Submission for Deadline 5 of 1 February 2016 (Part 1 of 2)
Other
Size: 4 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 20- Plan of Temporary Highways Alterations. Submission for Deadline 5 of 1 February 2016
Other
Size: 7 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 37 - Updated Crossing Schedule part 3. Submission for Deadline 5 of 1 February 2016
Other
Size: 806 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 9 - Response to Lincolnshire County Council Highways Matters. Submission for Deadline 5 of 1 February 2016
Other
Size: 131 KB
National Farmers Union and Lincolnshire Association of Agricultural Valuers
Written summary of the oral representation at the Compulsory Acquisition hearing on 20 and 21 January 2016. Late Submission for Deadline 5 accepted at the discretion of the Examining Authority
Other
Size: 245 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 1 -Written Summary of The Applicant's Oral Case put at Local Impacts Issues Specific Hearing on 19 January 2016.Submission for Deadline 5 of 1 February 2016
Other
Size: 36 KB
Bicker Parish Council
Regarding construction traffic. Submission for Deadline 5 of 1 February 2016
Other
Size: 148 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 12- Comparison Funding Statement Document (Revision A to Revision B). Submission for Deadline 5 of 1 February 2016
Other
Size: 127 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 28 - Statements of Common Ground Summary and Index. Submission for Deadline 5 of 1 February 2016
Other
Size: 99 KB
Triton Knoll Cable Group
Post hearing submission.Submission for Deadline 5 of 1 February 2016
Other
Size: 615 KB
Lincolnshire County Council
Updated Statement of Common Ground. Late Submission for Deadline 5 accepted at the discretion of the Examining Authority
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 8 - Minutes from LCC Traffic Meeting. Submission for Deadline 5 of 1 February 2016
Other
Size: 113 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 35 - Response to submission by Mr Ward at Deadline 4. Submission for Deadline 5 of 1 February 2016
Other
Size: 238 KB
National Farmers Union and Lincolnshire Association of Agricultural Valuers
Written summary of the oral representation made at the Issue Specific Hearing on 19 January 2016. Submission for Deadline 5 of 1 February 2016
Other
Size: 1 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 22 - Revised Draft Development Consent Order and Deemed Marine Licence - Revision F. Submission for Deadline 5 of 1 February 2016
Other
Size: 784 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 32 - Statement of Common Ground between Triton Knoll Offshore Windfarm Limited and Marine Management Organisation. Submission for Deadline 5 of 1 February 2016
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 31 - Statement of Common Ground between Triton Knoll Offshore Windfarm Limited and Natural England. Submission for Deadline 5 of 1 February 2016
Other
Size: 405 KB
Environment Agency
Summary of Oral Representations made at the Hearings and on the Applicant?s Appendix 32- Submission for Deadline 5 of 1 February 2016
Other
Size: 100 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 36 - Response to submission from Alco Estates Limited at Deadline 4. Submission for Deadline 5 of 1 February 2016
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 2- Written Summary of the Oral Case put at the CA hearing on 20 and 21 January. Submission for Deadline 5 of 1 February 2016
Other
Size: 15 KB
D.J. Bowler
Comments on the Applicant?s deadline 4 submissions. Submission for Deadline 5 of 1 February 2016
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 37 - Updated Crossing Schedule part 2. Submission for Deadline 5 of 1 February 2016
Other
Size: 509 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 16 - Updated Plan of Plans. Submission for Deadline 5 of 1 February 2016
Other
Size: 472 KB
Western Power Distribution Plc
In respect of Protective Provisions. Submission for Deadline 5 of 1 February 2016
Other
Size: 258 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 15 - Outline Soil Management Plan Comparison document (Revision C to Revision A). Submission for Deadline 5 of 1 February 2016
Other
Size: 433 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 30- Statement of Common Ground between Triton Knoll Offshore Wind Farm Limited and the Environment Agency. Submission for Deadline 5 of 1 February 2016
Other
Size: 114 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 25 - Development Consent Order Schedule of Amendments. Submission for Deadline 5 of 1 February 2016
Other
Size: 105 KB
Steven Lunn
Regarding land Affected (s51 advice has been issued). Submission for Deadline 5 of 1 February 2016
Other
Size: 223 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 27 - Updated Schedule of Compulsory Acquisition. Submission for Deadline 5 of 1 February 2016
Other
Size: 380 KB
Triton Knoll Offshore Wind Farm Limited
Land Interest Group 22 December Meeting Minutes. Submission for Deadline 5 of 1 February 2016
Other
Size: 148 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 11- Updated Funding Statement. Submission for Deadline 5 of 1 February 2016
Other
Size: 142 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 3 - Written Summary of the Oral Case put at the DCO Hearing held on 22 January. Submission for Deadline 5 of 1 February 2016
Other
Size: 860 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 37 - Updated Crossing Schedule part 1. Submission for Deadline 5 of 1 February 2016
Other
Size: 6 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 13 - Lincolnshire Coastal Grazing Marsh - Field 6 Site E Clarification Note. Submission for Deadline 5 of 1 February 2016
Other
Size: 239 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 14 - Outline Soil Management Plan (C). Submission for Deadline 5 of 1 February 2016
Other
Size: 116 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 33 - Triton Knoll Offshore Windfarm Limited and IDBs- Update Statement. Submission for Deadline 5 of 1 February 2016
Other
Size: 874 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 6 - Slides presented at hearings on the 19 and 21 January 2016. Submission for Deadline 5 of 1 February 2016
Other
Size: 436 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 18- Comparision Mitigation Strategy Document. Submission for Deadline 5 of 1 February 2016
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 29 - Statement of Common Ground between Triton Knoll Offshore Wind Farm Limited and Anglian Water Services Limited. Submission for Deadline 5 of 1 February 2016
Other
Size: 3 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 19 - Agricultural Land Clarification Note. Submission for Deadline 5 of 1 February 2016
Other
Size: 121 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 34 - Response to submission from Mr J Mowbray at Deadline 4. Submission for Deadline 5 of 1 February 2016
Other
Size: 747 KB
James Mowbray
Submission regarding the reinvestigation of the landfall site at Anderby. Submission for Deadline 5 of 1 February 2016
Other
Size: 329 KB
Triton Knoll Offshore Wind Farm Limited
The Applicant's Response to Deadline 5. Submission for Deadline 5 of 1 February 2016
Other
Size: 158 KB
Natural England
Written summary of the oral representation made at the Issue Specific Hearing on 22 January 2016. Submission for Deadline 5 of 1 February 2016
Other
Size: 93 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 4 -The Applicant's Credentials for the Issue Specific Hearings 19-22 January 2016. Submission for Deadline 5 of 1 February 2016
Other
Size: 74 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 21 - Update of Progress for Protective Provisions. Submission for Deadline 5 of 1 February 2016
Other
Size: 247 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 7 - The Applicant and Lincolnshire County Council Public Rights of Way Meeting Minutes. Submission for Deadline 5 of 1 February 2016
Other
Size: 416 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 17- Mitigation Strategy. Submission for Deadline 5 of 1 February 2016
Other
Size: 113 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 26 - Development Consent Order Schedule of Amendments Explanatory Document. Submission for Deadline 5 of 1 February 2016
Other
Size: 122 KB
Triton Knoll Offshore Wind Farm Limited
Covering letter Submission for Deadline 5 of 1 February 2016
Other
Size: 489 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 10 - Tourism Clarification Note. Submission for Deadline 5 of 1 February 2016
Other
Size: 1 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 23 - Revised Draft Development Consent Order and Deemed Marine Licence - Comparison of Revision E and Revision F. Submission for Deadline 5 of 1 February 2016
Other
Size: 3 MB
Lincolnshire County Council
Written summary of the oral representation made at the hearings. Submission for Deadline 5 of 1 February 2016 (Part 2 of 2)
Other
Size: 1 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 24 - Revised Draft Development Consent Order and Deemed Marine Licence - Comparison of Revision B and Revision F. Submission for Deadline 5 of 1 February 2016
Other
audio recording
Size: 19 KB
2016 Part 4 of 5 1
Other
audio recording
Size: 19 KB
2016 Part 1 of 2 1
Other
Size: 33 KB
2016 Part 3 of 4
Other
Size: 33 KB
2016 Part 2 of 4
Other
audio recording
Size: 85 MB
2016 Part 3 of 5
Other
Size: 33 KB
2016 Part 1 of 4
Other
audio recording
Size: 115 MB
2016 Part 1 of 2
Other
audio recording
Size: 97 MB
2016 Part 2 of 5
Other
Size: 33 KB
2016 Part 4 of 4
Other
audio recording
Size: 87 MB
2016 Part 1 of 5
Other
Size: 33 KB
2016 Part 2 of 2
Other
audio recording
Size: 55 MB
2016 Part 5 of 5
Other
audio recording
Size: 107 MB
2016 Part 4 of 5
Other
Size: 33 KB
2016 Part 1 of 2
Other
audio recording
Size: 32 MB
2016 Part 2 of 2
Other
Size: 411 KB
Marine Management Organisation
Submission in lieu of attendance at the draft Development Consent Order Hearing on 22 January 2016
Other
Size: 37 KB
Witham Fourth District Internal Drainage Board
Update on discussions between the Internal Drainage Boards and the Applicant
Other
Size: 67 KB
Burges Salmon on behalf of Triton Knoll Offshore Wind Farm Limited
Confirmation that the Statement submitted by National Grid Gas Plc (NGG) and National Grid Electricity Transmission Limited (NGET) on 20 January 2016 is a joint Statement agreed and made on behalf of the Applicant.
Other
Size: 119 KB
Historic England
'Submission by Historic England in lieu of attendance at the Issue Specific Hearing on 19 January 2016?
Other
Size: 58 KB
National Grid Gas Plc and National Grid Electricity Transmission Ltd
'Submission by National Grid Gas Plc (NGG) and National Grid Electricity Transmission Limited (NGET) in lieu of attendance at the Compulsory Acquisition Hearing on 21 January 2016?
Other
Size: 230 KB
Lincolnshire Wildlife Trust
Clarification of Lincolnshire Wildlife Trust?s answer to the Examining Authority?s Question EON 2.5. Late submission for Deadline 4 accepted at the discretion of the Examining Authority
Other
Size: 413 KB
Triton Knoll Offshore Wind Farm Limited
Statement of Common Ground between Triton Knoll Offshore Wind Farm Limited and Westminster Gravels Limited. Submission prior to January Hearings. Accepted at the discretion of the Examining Authority.
Other
Size: 125 KB
Triton Knoll Electrical System - Local Impacts Hearing Agenda
Other
Size: 187 KB
Maritime and Coastguard Agency
Response to the Examining Authority?s Second Questions. Accepted as a late submission for Deadline 4 of 5 January 2016, at the discretion of the Examining Authority
Other
Size: 54 KB
Triton Knoll Electrical System Second DCO Hearing Agenda Final
Other
Size: 52 KB
Triton Knoll Electrical System Second CA Hearing Agenda Final
Other
Size: 46 KB
Lincolnshire County Council
Answer to the Examining Authority?s Question DCO2.3. Late submission accepted at the discretion of the Examining Authority
Other
Size: 4 MB
Triton Knoll Offshore Wind Farm Limited
The Applicant?s Response to Lincolnshire County Council response to Deadline 4, amended to include Appendices 1 and A-E. Appendix 6 of Submission for Deadline 4 of 5 January 2016.
Other
Size: 124 KB
Triton Knoll Offshore Wind Farm Limited
Covering Letter for Submission for Deadline 4 of 5 January 2016
Other
Size: 612 KB
Triton Knoll Offshore Wind Farm Limited
Outline Soil Management Plan (Revision B). Appendix 25 of Submission for Deadline 4 of 5 January 2016
Other
Size: 284 KB
Triton Knoll Offshore Wind Farm Limited
Response to submission from North Kesteven District Council at Deadline 3. Appendix 11 of Submission for Deadline 4 of 5 January 2016
Other
Size: 141 KB
Triton Knoll Offshore Wind Farm Limited
Response to Submission from Mrs Helen Bowler at Deadline 3. Appendix 3 of Submission for Deadline 4 of 5 January 2016
Other
Size: 142 KB
Triton Knoll Offshore Wind Farm Limited
Response to Submission from Bicker Parish Council at Deadline 3. Appendix 2 of Submission for Deadline 4 of 5 January 2016
Other
Size: 220 KB
Triton Knoll Offshore Wind Farm Limited
Updated schedule of Compulsory Acquisition. Appendix 14 of Submission for Deadline 4 of 5 January 2016
Other
Size: 64 KB
Cllr Anthony Cox
Comments on National Grid Viking Link Limited's pre-consultation approach to Anderby Parish Council. Submission for Deadline 4 of 5 January 2016
Other
Size: 581 KB
Triton Knoll Offshore Wind Farm Limited
Further detail regarding the TKES cable corridor. Appendix 29 Addendum A Part 1of Submission for Deadline 4 of 5 January 2016
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Outline Construction Method Statement (Revision C). Appendix 21 of Submission for Deadline 4 of 5 January 2016
Other
Size: 1 MB
Triton Knoll Offshore Wind Farm Limited
Draft Statement of Common Ground between Triton Knoll Offshore Wind Farm Limited and the Marine Management Organisation. Appendix 36 of Submission for Deadline 4 of 5 January 2016
Other
Size: 628 KB
Triton Knoll Offshore Wind Farm Limited
Indicative IEC Access Layout. Appendix 47 of Submission for Deadline 4 of 5 January 2016
Other
Size: 100 KB
Triton Knoll Offshore Wind Farm Limited
Note on proposed modifications to form of Restrictive Covenant. Appendix 30 of Submission for Deadline 4 of 5 January 2016
Other
Size: 37 MB
Triton Knoll Offshore Wind Farm Limited
Schedule of Landowner Negotiation Contact. Appendix 43 of Submission for Deadline 4 of 5 January 2016
Other
Size: 2 MB
Natural England
Response to the Examining Authority?s Second Questions and Appendix. Submission for Deadline 4 of 5 January 2016
Other
Size: 310 KB
Triton Knoll Offshore Wind Farm Limited
Statement of Common Ground between Triton Knoll Offshore Wind Farm Limited and Lincolnshire Wildlife Trust. Appendix 34 of Submission for Deadline 4 of 5 January 2016
Other
Size: 103 KB
Triton Knoll Offshore Wind Farm Limited
Response to Environment Agency representations on form of Restrictive Covenant. Appendix 32 of Submission for Deadline 4 of 5 January 2016
Other
Size: 744 KB
Triton Knoll Offshore Wind Farm Limited
Revised draft Development Consent Order and Deemed Marine Licence Revision E. Appendix 15 of Submission for Deadline 4 of 5 January 2016
Other
Size: 4 MB
Triton Knoll Offshore Wind Farm Limited
Works Plan extract ?Sheet 31 showing access to Sibsey Lancaster Memorial. Appendix 41 of Submission for Deadline 4 of 5 January 2016
Other
Size: 497 KB
Triton Knoll Offshore Wind Farm Limited
Joint Statement between Triton Knoll Offshore Wind Farm Limited and the Land Interest Group. Appendix 38 of Submission for Deadline 4 of 5 January 2016
Other
Size: 136 KB
National Farmers Union and Lincolnshire Association of Agricultural Valuers
Response to the Examining Authority?s Second Questions . Submission for Deadline 4 of 5 January 2016
Other
Size: 108 KB
Triton Knoll Offshore Wind Farm Limited
Response to submission from National Farmers Union and the Lincolnshire Association of Agricultural Valuers at Deadline 3. Appendix 10 of Submission for Deadline 4 of 5 January 2016
Other
Size: 7 MB
Triton Knoll Offshore Wind Farm Limited
Crossing Schedule Part 3. Appendix 45 Part 3 of Submission for Deadline 4 of 5 January 2016
Other
Size: 339 KB
Marine Management Organisation
Response to the Examining Authority?s Second Questions. Submission for Deadline 4 of 5 January 2016
Other
Size: 350 KB
Lincolnshire County Council
Covering letter and Response to the Examining Authority?s Second Questions. Submission for Deadline 4 of 5 January 2016
Other
Size: 977 KB
Triton Knoll Offshore Wind Farm Limited
The Applicant?s Response to Deadline 4 of 5 January 2016
Other
Size: 109 KB
Triton Knoll Offshore Wind Farm Limited
Response to Submission from Mr J. E. Spence and Son at Deadline 3. Appendix 5 of Submission for Deadline 4 of 5 January 2016
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Further detail regarding the TKES cable corridor. Appendix 29 Addendum A Part 2 of Submission for Deadline 4 of 5 January 2016
Other
Size: 3 MB
Triton Knoll Offshore Wind Farm Limited
Theoretical land drainage designs (Plots 001-004) ExA Q SE 2.15. Appendix 46 of Submission for Deadline 4 of 5 January 2016
Other
Size: 127 KB
Triton Knoll Offshore Wind Farm Limited
Statements of Common Ground Summary and Index . Appendix 33 of Submission for Deadline 4 of 5 January 2016
Other
Size: 35 KB
Lincolnshire County Council
Update on Statement of Common Ground. Submission for Deadline 4 of 5 January 2016
Other
Size: 244 KB
Triton Knoll Offshore Wind Farm Limited
Schedule of draft Development Consent Order Amendments. Appendix 18 of Submission for Deadline 4 of 5 January 2016
Other
Size: 8 MB
Triton Knoll Offshore Wind Farm Limited
Further detail regarding the TKES cable corridor. Appendix 29 Addendum A Part 3 of Submission for Deadline 4 of 5 January 2016
Other
Size: 219 KB
Trinity House
Response to the Examining Authority?s Second Questions. Submission for Deadline 4 of 5 January 2016
Other
Size: 275 KB
Maritime and Coastguard Agency
Response to the Examining Authority?s Second Questions. Submission for Deadline 4 of 5 January 2016
Other
Size: 117 KB
Triton Knoll Offshore Wind Farm Limited
Joint Statement between Triton Knoll Offshore Wind Farm Limited, Black Sluice Internal Drainage Board, Lindsey Marsh Drainage Board and Witham Fourth District Internal Drainage Board. Appendix 37 of Submission for Deadline 4 of 5 January 2016
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Response to Submission from Orby Parish Council at Deadline 3. Appendix 12 of Submission for Deadline 4 of 5 January 2016
Other
Size: 66 KB
Lincolnshire Wildlife Trust
Response to the Examining Authority?s Second Questions. Submission for Deadline 4 of 5 January 2016
Other
Size: 5 MB
Triton Knoll Offshore Wind Farm Limited
Further detail regarding the TKES cable corridor. Appendix 29 Addendum A Part 4 of Submission for Deadline 4 of 5 January 2016
Other
Size: 594 KB
Triton Knoll Offshore Wind Farm Limited
Outline Landscape Strategy and Ecological Management Plan (Revision B) Comparison. Appendix 28 of Submission for Deadline 4 of 5 January 2016
Other
Size: 7 MB
Lincolnshire County Council
Lincolnshire Coastal Country Park Sites of Nature Conservation Interest and Local Wildlife Sites. Appendices to submission for Deadline 4 of 5 January 2016
Other
Size: 58 KB
Cllr Anthony Cox
Comments on the Applicant?s oral case put at the Socio-economic Hearing of 19 November 2015. Submission for Deadline 4 of 5 January 2016
Other
Size: 2 MB
James Mowbray
Response to the Examining Authority?s Second Questions. Submission for Deadline 4 of 5 January 2016
Other
Size: 3 MB
Triton Knoll Offshore Wind Farm Limited
Consequential changes to the Order Limit Plan and Development Boundary Comparison Plan related to the Bicker Fen Change request . Appendix 39 of Submission for Deadline 4 of 5 January 2016
Other
Size: 4 MB
National Grid Viking Link Limited
Responses to Examining Authority?s questions at the Issue Specific Hearing of 17 November 2015. Submission for Deadline 4 of 5 January 2016
Other
Size: 316 KB
Anglian Water
Response to the Examining Authority?s Second Questions and Protective Provisions. Submission for Deadline 4 of 5 January 2016
Other
Size: 403 KB
Triton Knoll Offshore Wind Farm Limited
Outline Noise and Vibration Management Plan (Revision B to Revision A) Comparison. Appendix 24 of Submission for Deadline 4 of 5 January 2016
Other
Size: 51 KB
East Lindsey District Council
Response to the Examining Authority?s Second Questions. Submission for Deadline 4 of 5 January 2016
Other
Size: 141 KB
Triton Knoll Offshore Wind Farm Limited
Response to Submission from Mr and Mrs Fox at Deadline 3 Appendix 8 of Submission for Deadline 4 of 5 January 2016
Other
Size: 8 MB
Theo and Miriam Fox
Written representation. Submission for Deadline 4 of 5 January 2016
Other
Size: 39 KB
Alco Estates Ltd
Written Representation. Submission for Deadline 4 of 5 January 2016 (representation now withdrawn)
Other
Size: 116 KB
Triton Knoll Offshore Wind Farm Limited
Response to Submission from Mr R. Wardle at Deadline 3. Appendix 13 of Submission for Deadline 4 of 5 January 2016
Other
Size: 317 KB
Historic England
Response to the Examining Authority?s Second Questions. Submission for Deadline 4 of 5 January 2016
Other
Size: 68 KB
Triton Knoll Offshore Wind Farm Limited
Response to submission from the Environment Agency at Deadline 3. Appendix 35 of Submission for Deadline 4 of 5 January 2016
Other
Size: 381 KB
Triton Knoll Offshore Wind Farm Limited
Outline Soil Management Plan (Revision B to Revision A) Comparison. Appendix 26 of Submission for Deadline 4 of 5 January 2016
Other
Size: 402 KB
Triton Knoll Offshore Wind Farm Limited
Outline Noise and Vibration Management Plan (Revision B). Appendix 23 of Submission for Deadline 4 of 5 January 2016
Other
Size: 11 MB
Triton Knoll Offshore Wind Farm Limited
Crossing Schedule Part 2. Appendix 45 Part 2 of Submission for Deadline 4 of 5 January 2016
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Revised draft Development Consent Order and Deemed Marine Licence ? Comparison of Revision D and Revision E. Appendix 16 of Submission for Deadline 4 of 5 January 2016
Other
Size: 245 KB
Triton Knoll Offshore Wind Farm Limited
Crossing Schedule Part 1. Appendix 45 of Submission for Deadline 4 of 5 January 2016
Other
Size: 212 KB
Brian Ward
Written Representation. Submission for Deadline 4 of 5 January 2016 (Representation now withdrawn)
Other
Size: 106 KB
Triton Knoll Offshore Wind Farm Limited
Confirmation of agreement from the Environment Agency in relation to draft Development Consent Order 2.22. Appendix 40 of Submission for Deadline 4 of 5 January 2016
Other
Size: 248 KB
Boston Borough Council
Response to the Examining Authority?s Second Questions. Submission for Deadline 4 of 5 January 2016
Other
Size: 10 MB
Triton Knoll Offshore Wind Farm Limited
Indicative Extent of Cable Duct Installation Techniques along the Onshore Cable Corridor Part 1. Appendix 44 of Submission for Deadline 4 of 5 January 2016
Other
Size: 324 KB
Triton Knoll Offshore Wind Farm Limited
Response to submission from Boston Borough Council at Deadline 3. Appendix 1 of Submission for Deadline 4 of 5 January 2016
Other
Size: 92 KB
Triton Knoll Offshore Wind Farm Limited
Response to Submission from Mr and Mrs Spence at Deadline 3. Appendix 9 of Submission for Deadline 4 of 5 January 2016
Other
Size: 13 KB
D J Bowler
Comments on documents published at Deadline 3. Submission for Deadline 4 of 5 January 2016
Other
Size: 40 KB
Andrew Spence
Written Representation. Submission for Deadline 4 of 5 January 2016 (Representation now withdrawn)
Other
Size: 583 KB
Triton Knoll Offshore Wind Farm Limited
Outline Landscape Strategy and Ecological Management Plan (Revision B). Appendix 27 of Submission for Deadline 4 of 5 January 2016
Other
Size: 34 KB
GTC Group of Companies
No Comments. Submission for Deadline 4 of 5 January 2016
Other
Size: 74 KB
North Kesteven District Council
Response to the Examining Authority?s Second Questions. Submission for Deadline 4 of 5 January 2016
Other
Size: 8 MB
Triton Knoll Offshore Wind Farm Limited
Indicative Extent of Cable Duct Installation Techniques along the Onshore Cable Corridor Part 2. Appendix 44 Part 2 of Submission for Deadline 4 of 5 January 2016
Other
Size: 154 KB
Triton Knoll Offshore Wind Farm Limited
Draft Development Consent Order Schedule of Amendments Explanatory Document. Appendix 19 of Submission for Deadline 4 of 5 January 2016
Other
Size: 114 KB
Triton Knoll Offshore Wind Farm Limited
Response to Submission M. Thomas at Deadline 3. Appendix 7 of Submission for Deadline 4 of 5 January 2016
Other
Size: 149 KB
Triton Knoll Offshore Wind Farm Limited
Response to Submission from Ian Grant at Deadline 3. Appendix 4 of Submission for Deadline 4 of 5 January 2016
Other
Size: 425 KB
Triton Knoll Offshore Wind Farm Limited
Application documents Schedule of Amendments. Appendix 20 of Submission for Deadline 4 of 5 January 2016
Other
Size: 120 KB
Triton Knoll Offshore Wind Farm Limited
EIA Evidence Plan Content Confirmation from Heritage Trust for Lincolnshire . Appendix 42 of Submission for Deadline 4 of 5 January 2016
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Outline Construction Method Statement (Revision C to Revision B) Comparison. Appendix 22 of Submission for Deadline 4 of 5 January 2016
Other
Size: 450 KB
Environment Agency
Response to the Examining Authority?s Second Questions and Comments on the revised draft Development Consent Order Revision D. Submission for Deadline 4 of 5 January 2016
Other
Size: 40 KB
Triton Knoll Offshore Wind Farm Limited
Rule 13 Notification of hearings in January 2016 from the Applicant
Other
Size: 113 KB
Rule 8(3) & Rule 13 Letter
Acceptance of change requests to the DCO and notification of hearings
Other
Size: 564 KB
Examination Library
Updated 23 March 2016.
Other
Size: 490 KB
Examining Authority's second written questions
Examining authority?s second written questions and requests for information
Other
Size: 4 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 16 of Response to Deadline 3 - Order Limits Reduction Request. Submission for Deadline 3 of 30 November 2015
Other
Size: 37 KB
East Lindsey District Council
Summary of the council?s oral case put at the Onshore Issues hearing on 17 November 2015. Submission for Deadline 3 of 30 November 2015
Other
Size: 89 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 11 of Response to Deadline 3 - DCO Schedule of Amendments Explanatory document. Submission for Deadline 3 of 30 November 2015
Other
Size: 482 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 7 of Response to Deadline 3 ? Revised draft DCO Revision D. Submission for Deadline 3 of 30 November 2015
Other
Size: 129 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 5 of Response to Deadline 3 - Summary of oral case at Socio Economic ISH of 19 November 2015. Submission for Deadline 3 of 30 November 2015
Other
Size: 89 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 23 of Response to Deadline 3 ? Hedgerow Removal and Mitigation Clarification Note. Submission for Deadline 3 of 30 November 2015
Other
Size: 301 KB
Marine Management Organisation
Written representation. Submission for Deadline 3 of 30 November 2015
Other
Size: 464 KB
Lincolnshire County Council
Written representation and Letter from Cllr Davie. Submission for Deadline 3 of 30 November 2015
Other
Size: 3 MB
National Grid Electricity Transmission Plc
Response to questions raised by the Examining Authority at the November Hearings. Submission for Deadline 3 of 30 November 2015
Other
Size: 40 KB
Westminster Gravels Ltd
Update on discussions with the applicant. Submission for Deadline 3 of 30 November 2015
Other
Size: 198 KB
Internal Drainage Boards
Joint submission of Black Sluice IDB, Lindsey Marsh Drainage Board and Witham Fourth IDB. Oral case put at Compulsory Acquisition Hearing on 13 November 2015. Submission for Deadline 3 of 30 November 2015
Other
Size: 512 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 6 of Response to Deadline 3 ? Credentials Outline. Submission for Deadline 3 of 30 November 2015
Other
Size: 717 KB
Environment Agency
Comments on the applicant?s Bicker Fen Substation Extension and Reconfiguration submission. Submission for Deadline 3 of 30 November 2015
Other
Size: 743 KB
Ian Grant
Comments on applicant?s documents and plan showing War Memorial. Submission for Deadline 3 of 30 November 2015
Other
Size: 100 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 17 of Response to Deadline 3 ?Compulsory Acquisition case clarification paper. Submission for Deadline 3 of 30 November 2015
Other
Size: 120 KB
M. Thomas
Written representation. Submission for Deadline 3 of 30 November 2015
Other
Size: 595 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 22 of Response to Deadline 3 ? Construction sequencing, cable testing and joint bay location Clarification Note. Submission for Deadline 3 of 30 November 2015
Other
Size: 125 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 13 of Response to Deadline 3 ? Statements of Common Ground Summary and Index. Submission for Deadline 3 of 30 November 2015
Other
Size: 230 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 12 of Response to Deadline 3 ? Updated schedule of Compulsory Acquisition. Submission for Deadline 3 of 30 November 2015
Other
Size: 165 KB
Bicker Parish Council
Written representation. Submission for Deadline 3 of 30 November 2015
Other
Size: 88 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 18 of Response to Deadline 3 ? Lincolnshire Coastal Grazing Marsh Spatial Clarification Note. Submission for Deadline 3 of 30 November 2015
Other
Size: 10 KB
Paul Anderson
Written representation. Submission for Deadline 3 of 30 November 2015
Other
Size: 34 KB
East Lindsey District Council
Council letter sent to Viking Link Project director dated 11 February 2015 showing the council?s position. Submission for Deadline 3 of 30 November 2015
Other
Size: 228 KB
Natural England
Written representation. Submission for Deadline 3 of 30 November 2015
Other
Size: 15 KB
North Kesteven District Council
Written representation. Submission for Deadline 3 of 30 November 2015
Other
Size: 622 KB
ConocoPhillips (U.K.) Limited
Update on discussions with the Applicant. Submission for Deadline 3 of 30 November 2015
Other
Size: 882 KB
Environment Agency
Summary of oral cases put at the Hearings of 12,13 and 17 November 2015. Submission for Deadline 3 of 30 November 2015
Other
Size: 13 MB
Lincolnshire County Council
Sandhills Act documents. Submission for Deadline 3 of 30 November 2015
Other
Size: 2 MB
Lincolnshire County Council
Appendices 1-5 of Written representation. Submission for Deadline 3 of 30 November 2015
Other
Size: 19 KB
Helen Bowler
Rebuttal of the Applicant?s comments at Deadline 2. Submission for Deadline 3 of 30 November 2015
Other
Size: 13 KB
Steven Lunn
Comments following Hearings. Submission for Deadline 3 of 30 November 2015
Other
Size: 106 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 4 of Response to Deadline 3 ? summary of oral case at Landscape and Visual Issues Hearing of 18 November 2015. Submission for Deadline 3 of 30 November 2015
Other
Size: 438 KB
Boston Borough Council
Summary of oral cases from the November hearings. Submission for Deadline 3 of 30 November 2015
Other
Size: 473 KB
Mr and Mrs Spence
Written representation. Submission for Deadline 3 of 30 November 2015 (Representation now withdrawn)
Other
Size: 4 MB
National Grid Viking Link Limited
Responses to queries raised by the Examining Authority during the Issue Specific Hearing on the 17th November 2015. Submission for Deadline 3 of 30 November 2015
Other
Size: 100 KB
Orby Parish Council
Written representation. Submission for Deadline 3 of 30 November 2015
Other
Size: 128 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 3 of Response to Deadline 3 ? summary of oral case at Onshore Impacts Hearing of 17 November 2015. Submission for Deadline 3 of 30 November 2015
Other
Size: 103 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 10 of Response to Deadline 3 ? DCO Schedule of Amendments. Submission for Deadline 3 of 30 November 2015
Other
Size: 86 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 20 of Response to Deadline 3 ? Construction Noise Monitoring Clarification Note. Submission for Deadline 3 of 30 November 2015
Other
Size: 68 KB
C.G.Banham
Comments following the Compulsory Acquisition Hearing of 13 November 2015. Submission for Deadline 3 of 30 November 2015 (Representation now withdrawn)
Other
Size: 150 KB
Theo and Miriam Fox
Written representation. Submission for Deadline 3 of 30 November 2015
Other
Size: 219 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 19 of Response to Deadline 3 ? Updated HRA Screening Matrices. Submission for Deadline 3 of 30 November 2015
Other
Size: 529 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 2 of Response to Deadline 3 ? summary of oral case at Compulsory Acquisition Hearing of 13 November 2015. Submission for Deadline 3 of 30 November 2015
Other
Size: 46 KB
Ian Grant
Post Accompanied Site Inspection comments. Submission for Deadline 3 of 30 November 2015
Other
Size: 156 KB
Triton Knoll Offshore Wind Farm Limited
Applicant?s Response to Deadline 3. Submission for Deadline 3 of 30 November 2015
Other
Size: 6 MB
J.E. Spence & Son
Written representation. Submission for Deadline 3 of 30 November 2015
Other
Size: 4 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 14 of Response to Deadline 3 ? Joint statement the applicant and Crown Estate Commissioners . Submission for Deadline 3 of 30 November 2015
Other
Size: 93 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 21 of Response to Deadline 3 - External Electrical Infrastructure Clarification Note. Submission for Deadline 3 of 30 November 2015
Other
Size: 5 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 15 of Response to Deadline 3 ? Joint statement between the applicant and Highways England Historical Railways Estate. Submission for Deadline 3 of 30 November 2015
Other
Size: 35 KB
Lincolnshire County Council
Update on discussions with the applicant. Submission for Deadline 3 of 30 November 2015
Other
Size: 224 KB
Roger Wardle Consultancy
Written representation. Submission for Deadline 3 of 30 November 2015
Other
Size: 2 MB
National Farmers Union and Lincolnshire Association of Agricultural Valuers
Summary of oral cases put at the November Hearings 2015.Submission for Deadline 3 of 30 November 2015
Other
Size: 177 KB
Triton Knoll Offshore Wind Farm Limited
Covering letter and list of documents submitted. Submission for Deadline 3 of 30 November 2015
Other
Size: 87 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 24 of Response to Deadline 3 ? Lincolnshire Coastal Grazing Marsh Consultation Clarification Note. Submission for Deadline 3 of 30 November 2015
Other
Size: 4 MB
Claire and JRM Mackinder
Written representation. Submission for Deadline 3 of 30 November 2015 (Representation now withdrawn)
Other
Size: 6 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 8 of Response to Deadline 3 ? Comparison document draft DCO against Revision C. Submission for Deadline 3 of 30 November 2015
Other
Size: 11 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 9 of Response to Deadline 3 ? Comparison document draft DCO against Revision B. Submission for Deadline 3 of 30 November 2015
Other
Size: 2 MB
Graham Hand on behalf of Hand Bros.
Covering letter and summary of oral case put at the Issue Specific Hearing of 19 November 2015. Includes Appendices A, B and C.
Other
Size: 103 KB
Triton Knoll Offshore Wind Farm Limited
Appendix 1 of Response to Deadline 3 ? summary of oral case at Development Consent Order Hearing of 12 November 2015. Submission for Deadline 3 of 30 November 2015
Other
Size: 174 KB
Anderby Parish Council
Summary of oral cases put at the November Hearings. Submission for Deadline 3 of 30 November 2015
Other
audio recording
Size: 19 KB
Audio Recording 17-11-15 Part 3
On-shore Issues Hearing including Construction and Noise, of 17 November 2015
Other
audio recording
Size: 71 MB
Audio Recording 17-11-15 Part 1
On-shore Issues Hearing including Construction and Noise, of 17 November 2015
Other
audio recording
Size: 95 MB
Audio Recording 17-11-15 Part 2
On-shore Issues Hearing including Construction and Noise, of 17 November 2015
Other
Size: 38 KB
Action note from November hearings
Summary of actions noted at the November hearings
Other
Size: 8 MB
Triton Knoll Offshore Wind Farm Limited
Applicant?s Site Visit Pack for the Accompanied Site Visit of 10 November 2015 - Part 7
Other
Size: 10 MB
Triton Knoll Offshore Wind Farm Limited
Applicant?s Site Visit Pack for the Accompanied Site Visit of 10 November 2015 - Part 1
Other
Size: 6 MB
Triton Knoll Offshore Wind Farm Limited
Applicant?s Site Visit Pack for the Accompanied Site Visit of 10 November 2015 - Part 5
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Applicant?s Site Visit Pack for the Accompanied Site Visit of 10 November 2015 - Part 3
Other
Size: 8 MB
Triton Knoll Offshore Wind Farm Limited
Applicant?s Site Visit Pack for the Accompanied Site Visit of 10 November 2015 - Part 6
Other
Size: 10 MB
Triton Knoll Offshore Wind Farm Limited
Applicant?s Site Visit Pack for the Accompanied Site Visit of 10 November 2015 - Part 2
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Applicant?s Site Visit Pack for the Accompanied Site Visit of 10 November 2015 - Part 4
Other
audio recording
Size: 19 KB
Audio Recording 12-11-15 Part 1 1
Draft Development Consent Order Hearing of 12 November 2015
Other
Size: 33 KB
Audio Recording 13-11-15 Part 2 1
Compulsory Acquisition Hearing of 13 November 2015
Other
audio recording
Size: 19 KB
Audio Recording 19-11-15 Part 1 1
Socio-Economic Issues Hearing of 19 November 2015
Other
Size: 33 KB
Audio Recording 13-11-15 Part 1 1
Compulsory Acquisition Hearing of 13 November 2015
Other
audio recording
Size: 19 KB
Audio Recording 18-11-15 1
Landscape and Visual Impacts Hearing of 18 November 2015
Other
audio recording
Size: 19 KB
Audio Recording 12-11-15 Part 2 1
Draft Development Consent Order Hearing of 12 November 2015
Other
audio recording
Size: 183 MB
Audio Recording 19-11-15 Part 1
Socio-Economic Issues Hearing of 19 November 2015
Other
Size: 33 KB
Audio Recording 13-11-15 Part 2
Compulsory Acquisition Hearing of 13 November 2015
Other
audio recording
Size: 155 MB
Audio Recording 18-11-15
Landscape and Visual Impacts Hearing of 18 November 2015
Other
audio recording
Size: 79 MB
Audio Recording 19-11-15 Part 2
Socio-Economic Issues Hearing of 19 November 2015
Other
audio recording
Size: 155 MB
Audio Recording 12-11-15 Part 2
Draft Development Consent Order Hearing of 12 November 2015
Other
audio recording
Size: 97 MB
Audio Recording 19-11-15 Part 3
Socio-Economic Issues Hearing of 19 November 2015
Other
Size: 33 KB
Audio Recording 13-11-15 Part 1
Compulsory Acquisition Hearing of 13 November 2015
Other
audio recording
Size: 155 MB
Audio Recording 12-11-15 Part 1
Draft Development Consent Order Hearing of 12 November 2015
Other
audio recording
Size: 75 MB
Audio recording 10-11-15
Audio recording of the Open Floor Hearing held on 10 November 2015
Other
audio recording
Size: 56 MB
Audio recording 11-11-15
Audio recording of the Open Floor Hearing held on 11 November 2015
Other
audio recording
Size: 77 MB
Audio recording 16-11-15
Audio recording of the Open Floor Hearing held on 16 November 2015
Other
Size: 4 MB
Triton Knoll Offshore Wind Farm Limited
Bicker Fen Extension and Reconfiguration ? Schedule of amendments to the DCO and Application Documents to be read alongside documents submitted on 13 November 2015
Other
Size: 721 KB
Triton Knoll Offshore Wind Farm Limited
Appendix A of Bicker Fen Extension and Reconfiguration Note - Environmental Statement Addendum Relating to Works at Bicker Fen. This documentation is a revised version of the submission which corrects the submission of the 8 November 2015, which contained an incorrect plan, had one missing annex (from Appendix A) and has been published on the website as a combined PDF, rather than the separate PDFs submitted.
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Appendix B of Bicker Fen Extension and Reconfiguration Note - Updated Bicker Fen Figures. This documentation is a revised version of the submission which corrects the submission of the 8 November 2015, which contained an incorrect plan, had one missing annex (from Appendix A) and has been published on the website as a combined PDF, rather than the separate PDFs submitted.
Other
Size: 241 KB
Triton Knoll Offshore Wind Farm Limited
Bicker Fen Extension and Reconfiguration Note. This documentation is a revised version of the submission which corrects the submission of the 8 November 2015, which contained an incorrect plan, had one missing annex (from Appendix A) and has been published on the website as a combined PDF, rather than the separate PDFs submitted.
Other
Size: 4 MB
Triton Knoll Offshore Wind Farm Limited
Appendix C of Bicker Fen Extension and Reconfiguration Note ? Joint Position Statement and appendices A and B. This documentation is a revised version of the submission which corrects the submission of the 8 November 2015, which contained an incorrect plan, had one missing annex (from Appendix A) and has been published on the website as a combined PDF, rather than the separate PDFs submitted.
Other
Size: 441 KB
Western Power Distribution plc
Update on discussions with the applicant and advising that not attending the hearings on 11 and 12 November 2015
Other
Size: 66 KB
Triton Knoll Offshore Wind Farm Limited
Confirmation of joint statement with National Grid submitted prior to draft DCO hearing on 12 November 2015. Accepted at the discretion of the Examining Authority
Other
Size: 37 KB
National Grid
Joint statement of National Grid and the applicant. Submitted in lieu of oral submission at draft DCO hearing on 12 November 2015. Accepted at the discretion of the Examining Authority
Other
Size: 14 MB
Triton Knoll Offshore Wind Farm Limited
Change request - Bicker Fen Extension Reconfiguration Note. Appendices A-C
Other
Size: 241 KB
Triton Knoll Offshore Wind Farm Limited
Change request - Bicker Fen Extension Reconfiguration
Other
Size: 71 KB
Notification to County Land and Business Association
Letter issued on behalf of the Examining Authority advising the County Land and Business Association of 'Other Party' status
Other
Size: 71 KB
Notification to Lincolnshire Association of Agricultural Valuers
Letter issued on behalf of the Examining Authority advising the Lincolnshire Association of Agricultural Valuers of 'Other Party' status
Other
Size: 146 KB
Accompanied Site Visit Schedule
Accompanied Site Visit Schedule on 10 and 11 November 2015
Other
Size: 946 KB
Land Interest Group
Draft Statement of Common Ground between Triton Knoll Offshore Wind Farm Limited and the Land Interest Group. Additional submission to Deadline 2 of 27 October 2015 accepted at the discretion of the Examining Authority.
Other
Size: 38 KB
Agenda for Issue Specific Hearing on 18 November 2015
Hearing for Landscape and Visual Impacts issues
Other
Size: 45 KB
Agenda for Issue Specific Hearing on 17 November 2015
Hearing for on-shore issues including construction
Other
Size: 37 KB
Agenda for Issue Specific Hearing on 19 November 2015
Hearing for socio-economic issues
Other
Size: 53 KB
Agenda for compulsory acquisition hearing on 13 November 2015
Other
Size: 79 KB
Agendas for open floor hearings on 10, 11 and 16 November 2015
Agendas for open floor hearings on 10, 11 and 16 November 2015
Other
Size: 75 KB
Agenda for issue specific hearing (Draft Development Consent Order) 12 November 2015
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Statement of Common Ground between the applicant and Anglian Water Services Limited. Appendix 15 of submission for Deadline 2 of 27 October 2015
Other
Size: 5 MB
Triton Knoll Offshore Wind Farm Limited
Updated Land Plans. Appendix 13 of submission for Deadline 2 of 27 October 2015
Other
Size: 901 KB
Triton Knoll Offshore Wind Farm Limited
Draft Development Consent Order and Deemed Marine Licence - comparison of Revision B and Revision C . Appendix 22 of submission for Deadline 2 of 27 October 2015
Other
Size: 116 KB
Triton Knoll Offshore Wind Farm Limited
Response to Bicker Parish Council. Appendix 2 of submission for Deadline 2 of 27 October 2015
Other
Size: 247 KB
Triton Knoll Offshore Wind Farm Limited
Schedule of DCO Amendments. Appendix 23 of submission for Deadline 2 of 27 October 2015
Other
Size: 34 KB
Natural England
Update on discussions with the applicant. Submission for Deadline 2 of 27 October 2015
Other
Size: 180 KB
Triton Knoll Offshore Wind Farm Limited
Lincolnshire Coastal County Park Clarification Note. Appendix 27 of submission for Deadline 2 of 27 October 2015
Other
Size: 429 KB
Triton Knoll Offshore Wind Farm Limited
Statement of Common Ground between the applicant and Boston Borough Council . Appendix 19 of submission for Deadline 2 of 27 October 2015
Other
Size: 426 KB
Triton Knoll Offshore Wind Farm Limited
Statement of Common Ground between the applicant and East Lindsey District Council. Appendix 20 of submission for Deadline 2 of 27 October 2015
Other
Size: 173 KB
Triton Knoll Offshore Wind Farm Limited
Agricultural Land Drainage Clarification Note. Appendix 26 of submission for Deadline 2 of 27 October 2015
Other
Size: 102 KB
Triton Knoll Offshore Wind Farm Limited
Response to Natural England. Appendix 9 of submission for Deadline 2 of 27 October 2015
Other
Size: 273 KB
Triton Knoll Offshore Wind Farm Limited
Statement of Common Ground between the applicant and the Eastern Inshore Fisheries and Conservation Authority. Appendix 16 of submission for Deadline 2 of 27 October 2015
Other
Size: 375 KB
Environment Agency
Comments on responses to the Examining Authority?s First Written Questions. Submission for Deadline 2 of 27 October 2015
Other
Size: 114 KB
Triton Knoll Offshore Wind Farm Limited
Response to North Kesteven District Council. Appendix 10 of submission for Deadline 2 of 27 October 2015
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Statement of Common Ground between the applicant and Natural England. Appendix 18 of submission for Deadline 2 of 27 October 2015
Other
Size: 167 KB
Triton Knoll Offshore Wind Farm Limited
Response to Environment Agency. Appendix 4 of submission for Deadline 2 of 27 October 2015
Other
Size: 201 KB
Triton Knoll Offshore Wind Farm Limited
Consultee Response Table. Appendix 24 of submission for Deadline 2 of 27 October 2015
Other
Size: 35 KB
Lincolnshire County Council
Update on progress of Statement of Common Ground with the applicant and notification of attendance at Open Floor Hearings. Submission for Deadline 2 of 27 October 2015
Other
Size: 121 KB
Triton Knoll Offshore Wind Farm Limited
Response to Lincolnshire County Council. Appendix 5 of submission for Deadline 2 of 27 October 2015
Other
Size: 6 MB
Lincolnshire County Council
Response to representations from National Grid Viking Link. Includes Power Point presentation. Submission for Deadline 2 of 27 October 2015
Other
Size: 19 KB
Helen Bowler
Response to Written Representations by the National Farmers Union and Boston Borough Council. Submission for Deadline 2 of 27 October 2015
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
Response to Lincolnshire Wildlife Trust. Appendix 6 of submission for Deadline 2 of 27 October 2015
Other
Size: 317 KB
Triton Knoll Offshore Wind Farm Limited
Onshore Export Cable Corridor Requirements. Appendix 28 of submission for Deadline 2 of 27 October 2015
Other
Size: 103 KB
Triton Knoll Offshore Wind Farm Limited
Response to National Farmers Union Appendix 8 of submission for Deadline 2 of 27 October 2015
Other
Size: 122 KB
Triton Knoll Offshore Wind Farm Limited
Response to Addlethorpe Parish Council. Appendix 1 of submission for Deadline 2 of 27 October 2015
Other
Size: 123 KB
Triton Knoll Offshore Wind Farm Limited
Statements of Common Ground Summary and Index. Appendix 14 of submission for Deadline 2 of 27 October 2015
Other
Size: 167 KB
Triton Knoll Offshore Wind Farm Limited
Covering Letter. Submission for Deadline 2 of 27 October 2015
Other
Size: 129 KB
Triton Knoll Offshore Wind Farm Limited
Response to 67 Landowners and occupiers including the Lincolnshire Association of Agricultural Valuers. Appendix 11 of submission for Deadline 2 of 27 October 2015
Other
Size: 111 KB
Triton Knoll Offshore Wind Farm Limited
Response to Mrs Helen Bowler. Appendix 7 of submission for Deadline 2 of 27 October 2015
Other
Size: 217 KB
Triton Knoll Offshore Wind Farm Limited
Updated schedule of compulsory acquisition. Appendix 12 of submission for Deadline 2 of 27 October 2015
Other
Size: 458 KB
Lindsey Marsh Drainage Board, Witham Fourth District Internal Drainage Board and Black Sluice Internal Drainage Board
Draft Statement of Common Ground with the applicant, with tracked changes by the Drainage Boards. Submission for Deadline 2 of 27 October 2015
Other
Size: 764 KB
Triton Knoll Offshore Wind Farm Limited
Draft Development Consent Order and Deemed Marine Licence. Appendix 21 of submission for Deadline 2 of 27 October 2015
Other
Size: 135 KB
Triton Knoll Offshore Wind Farm Limited
Response to East Lindsey District Council. Appendix 3 of submission for Deadline 2 of 27 October 2015
Other
Size: 375 KB
Triton Knoll Offshore Wind Farm Limited
Statement of Common Ground between the applicant and Lincolnshire Wildlife Trust . Appendix 17 of submission for Deadline 2 of 27 October 2015
Other
Size: 526 KB
Triton Knoll Offshore Wind Farm Limited
Response to Deadline 2. Submission for Deadline 2 of 27 October 2015
Other
Size: 120 KB
Triton Knoll Offshore Wind Farm Limited
Clarification Note in response to Natural England?s Relevant Representation, principally covering offshore cable installation techniques. Appendix 25 of submission for Deadline 2 of 27 October 2015
Other
Size: 42 KB
Triton Knoll Wind Farm Limited
Rule 13 Notification of hearings in November 2015 from the Applicant
Other
Size: 106 KB
Triton Knoll Notification of hearings and Rule 8(3)
Letter issued by the Examining Authority notifying of changes to the examination timetable, notifying of all hearings and Accompanied Site Inspection and request for further information.
Other
Size: 42 KB
Rule 13 Notification
Copy of newspaper notice provided by the applicant
Other
Size: 665 KB
National Grid Viking Link Limited
Response to the Examining Authority?s First Questions. Late submission to Deadline 1 of 5 October 2015. Accepted at the discretion of the Examining Authority
Other
Size: 13 MB
Written Representation from 67 landowners / occupiers
Appendix 4 ? Examples of Correspondence, and Appendix 5 ?Letter from RWE enclosing Heads of Terms 10 September 2015 and TKOWFL 16 September 2015 . Submission by Wilkin Chapman LLP for Deadline 1 of 5 October 2015
Other
Size: 9 MB
Written Representation from 67 landowners / occupiers
Appendix 3 ? Report of James OBrien on Soils and Land Drainage. Submission by Wilkin Chapman LLP for Deadline 1 of 5 October 2015
Other
Size: 18 KB
East Lindsey District Council
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 5 October 2015
Other
Size: 1 MB
Triton Knoll Offshore Wind Farm Limited
Landowner correspondence documents. Appendix 42 of Submission for Deadline 1 of 5 October 2015
Other
Size: 194 KB
Boston Borough Council
Local Impact Report. Submission for Deadline 1 of 5 October 2015
Other
Size: 24 KB
Helen Bowler
Written Representation and Response to the Examining Authoritys First Written Questions.Submission for Deadline 1 of 5 October 2015
Other
Size: 264 KB
Triton Knoll Offshore Windfarm Limited
Schedule of Compulsory Acquisition. Appendix 6 of Submission for Deadline 1 of 5 October 2015
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
Statement of Common Ground with the National Trust. Appendix 37 of Submission for Deadline 1 of 5 October 2015
Other
Size: 39 KB
Skegness Town Council
No comments at this time. Submission for Deadline 1 of 5 October 2015
Other
Size: 225 KB
EDF Energy Renewables
Written Representation. Submission for Deadline 1 of 5 October 2015
Other
Size: 425 KB
Triton Knoll Offshore Wind Farm Limited
Draft Badger Licence Application ? Letter of No Impediment. Appendix 44 of Submission for Deadline 1 of 5 October 2015
Other
Size: 28 MB
East Lindsey District Council
Appendices to Written Representation ? Draft Core Strategy, Local Plan, Landscape Character Assessment. Submission for Deadline 1 of 5 October 2015
Other
Size: 1 MB
Triton Knoll Offshore Wind Farm Limited
The Applicant?s Response to Relevant Representations and Additional Submissions. Appendix 1 of Submission for Deadline 1 of 5 October 2015
Other
Size: 13 MB
Written Representation from 67 landowners - occupiers
Appendix 2 ? DMJ Drainage Ltd Report on Drainage. Submission by Wilkin Chapman LLP for Deadline 1 of 5 October 2015
Other
Size: 304 KB
Triton Knoll Offshore Windfarm Limited
Draft Statement of Common Ground with East Lindsey District Council. Appendix 28 of Submission for Deadline 1 of 5 October 2015
Other
Size: 5 MB
Written Representation from 67 landowners / occupiers
Written Representation, Summary, and Appendix 1 ? Details of Landholdings. Submission by Wilkin Chapman LLP for Deadline 1 of 5 October 2015
Other
Size: 134 KB
Triton Knoll Offshore Wind Farm Limited
IEC Landscape and Visual Assessment Clarification Note. Appendix 12 of Submission for Deadline 1 of 5 October 2015
Other
Size: 47 KB
National Farmers Union
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 5 October 2015
Other
Size: 1 MB
Lincolnshire Wildlife Trust
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 5 October 2015
Other
Size: 59 KB
Lincolnshire County Council
Local Impact Report. Submission for Deadline 1 of 5 October 2015
Other
Size: 1 MB
Natural England
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 5 October 2015
Other
Size: 599 KB
Triton Knoll Offshore Windfarm Limited
Draft Statement of Common Ground with the Marine Management Organisation. Appendix 31 of Submission for Deadline 1 of 5 October 2015
Other
Size: 94 KB
East Lindsey District Council
Written Representation and Summary. Submission for Deadline 1 of 5 October 2015
Other
Size: 4 MB
Triton Knoll Offshore Wind Farm Limited
Outline Construction Method Statement. Appendix 38 of Submission for Deadline 1 of 5 October 2015
Other
Size: 415 KB
Triton Knoll Offshore Windfarm Limited
Statement of Common Ground with the Environment Agency. Appendix 29 of Submission for Deadline 1 of 5 October 2015
Other
Size: 558 KB
Triton Knoll Offshore Windfarm Limited
Ecology Constraints at Landfall. Appendix 8 of Submission for Deadline 1 of 5 October 2015
Other
Size: 861 KB
Historic England
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 5 October 2015
Other
Size: 44 MB
Triton Knoll Offshore Wind Farm Limited
Covering Letter and Written Representation. Submission for Deadline 1 of 5 October 2015
Other
Size: 4 MB
Environment Agency
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 5 October 2015
Other
Size: 3 MB
Triton Knoll Offshore Wind Farm Limited
Statement of Common Ground with the Maritime and Coastguard Agency. Appendix 34 of Submission for Deadline 1 of 5 October 2015
Other
Size: 7 MB
Triton Knoll Offshore Wind Farm Limited
Statement of Reasons. Appendix 40 of Submission for Deadline 1 of 5 October 2015
Other
Size: 6 MB
Graham Hand
Written Representation and suggested site visit locations. Submission for Deadline 1 of 5 October 2015
Other
Size: 16 MB
Triton Knoll Offshore Wind Farm Limited
SoCG withHistoric Buildings and Monuments Commission for England. Appendix 20 of Submission for Deadline 1 of 5 October 2015
Other
Size: 267 KB
National Grid
Written Representation and Appendix ? Relevant Representation submitted on 9 July 2015. Submission for Deadline 1 of 5 October 2015
Other
Size: 6 MB
Mr and Mrs Yeadon
Written Representation.Submission for Deadline 1 of 5 October 2015 (representation now withdrawn)
Other
Size: 196 KB
North Kesteven District Council
Written Representation and Summary and request for Open Floor Hearing. Submission for Deadline 1 of 5 October 2015
Other
Size: 580 KB
Triton Knoll Offshore Wind Farm Limited
Annotated version of Figure 4-6 Volume 1, Chapter 4 Site Selection and Alternatives. Appendix 4 of Submission for Deadline 1 of 5 October 2015
Other
Size: 582 KB
Triton Knoll Offshore Wind Farm Limited
Outline Pollution Prevention and Emerging Incident Response Plan. Appendix 39 of Submission for Deadline 1 of 5 October 2015
Other
Size: 3 MB
Lincolnshire County Council
Written Representation and Appendix ? Smart Wind figures for cables and cable trenches.From Hornsea Offshore Wind Farm Project One Environmental Statement Volume 1 ? Introductory Chapters Chapter 3. Submission for Deadline 1 of 5 October 2015
Other
Size: 3 MB
Environment Agency
Written Representation and request for Compulsory Acquisition Hearing. Submission for Deadline 1 of 5 October 2015
Other
Size: 118 KB
Triton Knoll Offshore Wind Farm Limited
Statements of Common Ground Summary and Index. Appendix 14 of Submission for Deadline 1 of 5 October 2015
Other
Size: 354 KB
Triton Knoll Offshore Windfarm Limited
Statement of Common Ground with Black Sluice Internal Drainage Board, Lindsey Marsh Drainage Board and Witham Fourth District Internal Drainage Board. Appendix 32 of Submission for Deadline 1 of 5 October 2015
Other
Size: 352 KB
Triton Knoll Offshore Windfarm Limited
Statement of Common Ground with Westminster Gravels Limited. Appendix 26 of Submission for Deadline 1 of 5 October 2015
Other
Size: 68 KB
Triton Knoll Offshore Windfarm Limited
Statement of Common Ground with Lincolnshire Wildlife Trust. Appendix 21 of Submission for Deadline 1 of 5 October 2015
Other
Size: 1 MB
Natural England
Written Representation. Submission for Deadline 1 of 5 October 2015
Other
Size: 42 KB
Anthony Cox for Anderby Parish Council
Request for Open Floor Hearing from Anderby Parish Council. Submission for Deadline 1 of 5 October 2015
Other
Size: 2 MB
Lincolnshire Wildlife Trust
Written Representation and Nomination of site for inspection by Accompanied Site Visit. Submission for Deadline 1 of 5 October 2015
Other
Size: 296 KB
Nigel Greaves
Written Representation and Appendices ? Boston Borough Council Planning Decision, FOI request and responses, Shipdham noise condition. Submission for Deadline 1 of 5 October 2015
Other
Size: 21 KB
Addlethorpe Parish Council
Written Representation. Submission for Deadline 1 of 5 October 2015
Other
Size: 557 KB
Western Power Distribution plc
Update on discussions with the applicant. Submission for Deadline 1 of 5 October 2015
Other
Size: 767 KB
Triton Knoll Offshore Windfarm Limited
HRA Screening Matrices. Appendix 9 of Submission for Deadline 1 of 5 October 2015
Other
Size: 7 MB
Triton Knoll Offshore Wind Farm Limited
Appendix 8 ? SoCG with Perenco . Appendix 3 of Submission for Deadline 1 of 5 October 2015
Other
Size: 986 KB
Triton Knoll Cable Group
Written Representation. Submission for Deadline 1 of 5 October 2015
Other
Size: 27 KB
Joseph and Judy Mackinder
Written Representation, request for an Open Floor Hearing and suggested site visit locations. Submission for Deadline 1 of 5 October 2015 (Representation now withdrawn)
Other
Size: 201 KB
Triton Knoll Offshore Windfarm Limited
Statement of Common Ground with the Corporation of Trinity House. Appendix 25 of Submission for Deadline 1 of 5 October 2015
Other
Size: 985 KB
Triton Knoll Offshore Windfarm Limited
Sibsey Lancaster Memorial Clarification Note. Appendix 11 of Submission for Deadline 1 of 5 October 2015
Other
Size: 25 KB
Network Rail
Written Representation and request for Compulsory Acquisition Hearing. Submission for Deadline 1 of 5 October 2015
Other
Size: 473 KB
Triton Knoll Offshore Wind Farm Limited
Consent from The Crown Estate Commissioners for the purposes of sub-sections (1) and (2) of section 135 of the Planning Act 2008(CA 1.9). Appendix 43 of Submission for Deadline 1 of 5 October 2015
Other
Size: 181 KB
North Kesteven District Council
Local Impact Report. Submission for Deadline 1 of 5 October 2015
Other
Size: 29 MB
Triton Knoll Offshore Wind Farm Limited
IEC Landscape and Visual Assessment Clarification Note annex 2. Appendix 12 of Submission for Deadline 1 of 5 Ocrober 2015
Other
Size: 14 KB
Bicker Parish Council
Written Representation. Submission for Deadline 1 of 5 October 2015
Other
Size: 230 KB
Boston Borough Council
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 5 October 2015
Other
Size: 34 KB
Neil Booth
Written Representation. Submission for Deadline 1 of 5 October 2015 (representation now withdrawn)
Other
Size: 755 KB
Councillor Colin Davie
Letter to the Examining Authority dated 26 August 2015. Due to an admin error this was not published prior to the Preliminary Meeting.
Other
Size: 80 KB
Triton Knoll Offshore Windfarm Limited
Table of Progress for Protective Provisions amended 1 October 2015. Appendix 7 of Submission for Deadline 1 of 5 October 2015
Other
Size: 436 KB
Triton Knoll Offshore Windfarm Limited
Statement of Common Ground with National Grid Viking Link Limited. Appendix 22 of Submission for Deadline 1 of 5 October 2015
Other
Size: 1 MB
East Lindsey District Council
Notification of attendance at an Accompanied Site Visit and suggested locations. Submission for Deadline 1 of 5 October 2015
Other
Size: 224 KB
Triton Knoll Offshore Windfarm Limited
Statement of Common Ground with Public Health England. Appendix 24 of Submission for Deadline 1 of 5 October 2015
Other
Size: 137 KB
Triton Knoll Offshore Wind Farm Limited
Classified peak hour, off-peak and AADT traffic data. Appendix 45 of Submission for Deadline 1 of 5 October 2015
Other
Size: 159 KB
Triton Knoll Offshore Windfarm Limited
Health Impacts and Electro-Magnetic Fields Clarification Note. Appendix 10 of Submission for Deadline 1 of 5 October 2015
Other
Size: 34 KB
Peter Theobald
Written Representation. Submission for Deadline 1 of 5 October 2015
Other
Size: 918 KB
Triton Knoll Offshore Windfarm Limited
Statement of Common Ground with Natural England. Appendix 23 of Submission for Deadline 1 of 5 October 2015
Other
Size: 76 KB
East Lindsey District Council
Local Impact Report. Submission for Deadline 1 of 5 October 2015
Other
Size: 181 KB
Triton Knoll Offshore Windfarm Limited
Weed Control and Soil Protection Clarification Note. Appendix 13 of Submission for Deadline 1 of 5 October 2015
Other
Size: 15 MB
Triton Knoll Offshore Wind Farm Limited
Crossing Schedule Plan ? Appendix 5 of Submission for Deadline 1 of 5 October 2015
Other
Size: 290 KB
Triton Knoll Offshore Windfarm Limited
Draft Statement of Common Ground with Boston Borough Council. Appendix 27 of Submission for Deadline 1 of 5 October 2015
Other
Size: 729 KB
Alco Estates Limited
Written Representation. Submission for Deadline 1 of 5 October 2015 (representation now withdrawn)
Other
Size: 68 KB
Orby Parish Council
Written Representation and request for Open Floor Hearing. Submission for Deadline 1 of 5 October 2015
Other
Size: 37 MB
Triton Knoll Offshore Wind Farm Limited
IEC Landscape and Visual Assessment Clarification Note Annex 1. Appendix 12 of Submission for Deadline 1 of 5 October 2015
Other
Size: 336 KB
Marine Management Organisation
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 5 October 2015
Other
Size: 204 KB
Triton Knoll Offshore Wind Farm Limited
Natural England comments on Report to inform Appropriate Assessment dated 13 March 2015. Appendix 41 of Submission for Deadline 1 of 5 October 2015
Other
Size: 788 KB
Triton Knoll Offshore Wind Farm
Perenco Consent Support Letter dated 14 October 2014. Appendix 2 of Submission for Deadline 1 of 5 October 2015
Other
Size: 115 KB
National Grid Electricity Transmission Plc (NGET)
Response to the Examining Authority?s First Written Questions. Submission for Deadline 1 of 5 October 2015
Other
Size: 699 KB
Triton Knoll Offshore Windfarm Limited
Draft Statement of Common Ground with Lincolnshire County Council. Appendix 30 of Submission for Deadline 1 of 5 October 2015
Other
Size: 111 KB
National Farmers Union
Written Representation and Notification of intention to attend and speak at an Issue Specific Hearing. Submission for Deadline 1 of 5 October 2015
Other
Size: 4 MB
Robert Hurst
Written Representation.Submission for Deadline 1 of 5 October 2015
Other
Size: 71 KB
Unaccompanied site inspection note
The ExA's note of their unaccompanied site inspection undertaken 1 and 2 September 2015.
Other
Size: 386 KB
Triton Knoll Cable Group
Submission following the Preliminary Meeting of 3 September 2015
Other
Size: 207 KB
Rule 8 Letter
Other
Size: 155 KB
Note of the Preliminary Meeting
Note of the Preliminary Meeting held at the Store house Conference Centre, on 3 September 2015
Other
Size: 2 MB
Matt Warman MP for Boston & Skegness and Victoria Atkins MP for Louth & Horncastle
Submission following the Preliminary Meeting of 3 September 2015
Other
Size: 316 KB
Examining Authority's first written questions and requests for information
Other
Size: 94 KB
Norfolk County Council
Submission received prior to the Preliminary Meeting accepted at the Preliminary Meeting of 3 September 2015
Other
Size: 168 MB
Triton Knoll Offshore Wind Farm Limited
5.1 Consultation Report
Other
Size: 19 KB
Triton Knoll Offshore Wind Farm Limited
5.1 Consultation Report
Other
Size: 280 KB
Triton Knoll Offshore Wind Farm Limited
Response to S51 Advice and table of amended documents
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
2.5 Access to Works and Streets Plans
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
2.7 Public Rights of Way Plans
Other
Size: 2 MB
Triton Knoll Offshore Wind Farm Limited
3.1 Draft Development Consent Order and Deemed Marine Licence
Other
Size: 493 KB
Witham Fourth District
IDB Letter
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
8.16 EIA Evidence Plan
Other
Size: 478 KB
Western Power Distribution
Submission received prior to the Preliminary Meeting accepted at the Preliminary Meeting of 3 September 2015
Other
Size: 20 MB
Triton Knoll Offshore Wind Farm Limited
2.1 Order Limits Plans
Other
Size: 21 MB
Triton Knoll Offshore Wind Farm Limited
2.2 Works Plans
Other
Size: 19 MB
Triton Knoll Offshore Wind Farm Limited
2.3 & 2.4 Land plans and Crown plans
Other
Size: 9 MB
Triton Knoll Offshore Wind Farm Limited
2.6 Hedgerow Plans
Other
Size: 45 KB
Triton Knoll Offshore Wind Farm Limited
4.3 Book of Reference
Other
Size: 8 MB
Triton Knoll Offshore Wind Farm Limited
4.1 Statement of Reasons
Other
audio recording
Size: 157 MB
Preliminary Meeting Audio Recording 3 September 2015
Other
Size: 11 KB
Graham Hand
Submission received in response to Rule 6 letter of 30 July 2015
Other
Size: 29 KB
Mr and Mrs Bowler
Submission prior to Preliminary Meeting. Accepted at the discretion of the Examining Authority.
Other
Size: 16 KB
Boston Borough Council
Submission received in response to Rule 6 letter of 30 July 2015
Other
Size: 1 MB
Chris Stephenson
Submission received in response to Rule 6 letter of 30 July 2015
Other
Size: 935 KB
Steven Lunn
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 603 KB
Western Power Distribution
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 899 KB
Miriam Fox
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 389 KB
Triton Knoll Cable Group
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 922 KB
Stacey Lunn
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 696 KB
Wildmore Farms
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 702 KB
Ian Grant
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 1 MB
Mr D J Bowler
Submission received in response to Rule 6 letter of 30 July 2015
Other
Size: 158 KB
Public Health England
Submission received in response to Rule 6 letter of 30 July 2015
Other
Size: 889 KB
Theo Fox
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 371 KB
National Grid Viking Link Limited
Submission received in response to Rule 6 letter of 30 July 2015
Other
Size: 32 KB
Bicker Parish Council
Submission received in response to Rule 6 letter of 30 July 2015
Other
Size: 269 KB
Triton Knoll Offshore Windfarm Limited
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 1 MB
Andrew Spence
Submission received in response to Rule 6 letter of 30 July 2015 (Representation now withdrawn)
Other
Size: 36 KB
Huttoft Parish Council
Submission received in response to Rule 6 letter of 30 July 2015
Other
Size: 24 KB
Helen Bowler
Submissions dated 16 and 21 August 2015. Received in response to Rule 6 Letter of 30 July 2015
Other
Size: 1 MB
Stuart Grant
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 949 KB
Mr K N Grant
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 63 KB
GTC Group of Companies
Submission received in response to Rule 6 letter of 30 July 2015
Other
Size: 2 MB
J J Grant Company
Submission received in response to Rule 6 Letter of 30 July 2015
Other
Size: 146 KB
Rule 6 Letter
Other
Size: 104 KB
Notification to Shirley Fields
Letter issued on behalf of the Examining Authority advising Miss Fields of 'Other Party' status
Other
Size: 104 KB
Notification to Colin Davie
Letter issued on behalf of the Examining Authority advising Mr Davie of 'Other Party' status
Other
Size: 5 MB
Miss Shirley Fields
Late representation accepted as Other Person at the discretion of the Examining Authority
Other
Size: 33 KB
Certificates of Compliance with S56 S59 and EIA Regulation 13
Other
Size: 31 KB
Appointment of Examining Authority (Panel of 3)
Other
Size: 120 KB
S51 advice following decision to accept application for examination
Other
Size: 40 MB
6.2.5.7.1 Hydrology Baseline
Other
Size: 147 KB
8.7.3 Outline Noise and Vibration Management Plan
Other
Size: 31 MB
6.2.5.2.1 LVIA Technical Baseline Report Part 2 Figures
Other
Size: 60 KB
Rutland County Council
Adequacy of Consultation Representation
Other
Size: 46 MB
6.2.5.2.2 Photomontages Part 1 Plates-1-1-1a to 1-1-5
Other
Size: 28 MB
6.2.5.5.1 Land Use Baseline Report
Other
Size: 116 KB
Notification of Decision to Accept Application
Other
Size: 137 KB
South Kesteven District Council
Adequacy of Consultation Representation
Other
Size: 37 MB
8.17 Site selection and design report - Part -1 Report and Appendices A and B
Other
Size: 1 MB
1.2 Application Form
Other
Size: 514 KB
8.15 Mitigation Strategy
Other
Size: 17 MB
2.3 and 2.4 Land plans and Crown plans
Other
Size: 343 KB
3.2 DCO Explanatory Memorandum
Other
Size: 31 KB
Boston Borough Council
Adequacy of Consultation Representation
Other
Size: 22 MB
8.1 PINS Scoping Direction
Other
Size: 877 KB
6.2.3.13 Onshore Conclusions and Summary of key issues
Other
Size: 689 KB
6.2.3.8 Historic Environment
Other
Size: 2 MB
6.2.5.11.3 Onshore Substation Noise Modelling Report
Other
Size: 6 MB
6.2.4.2.1 Physical Processes Technical Baseline Report
Other
Size: 8 MB
6.2.5.2.1 LVIA Technical Baseline Report Part 1 report and Figures
Other
Size: 5 MB
6.2.4.4.2 Benthic Ecology - Intertidal Ecology Technical Report
Other
Size: 16 MB
6.2.5.10.1 Air Quality Baseline
Other
Size: 5 MB
6.2.2.6 Marine Mammals
Other
Size: 45 KB
Triton Knoll Offshore Wind Farm Limited
Applicant?s clarification of application documents including attachments: S42 consultation, Comparison Schedule between S42 consultation and Book of Reference and Letter regarding Statement of Community Consultation to Boston Borough Council
Other
Size: 968 KB
6.2.2.12 interrelationships Offshore
Other
Size: 189 KB
8.7.5 Outline Soil Management Plan
Other
Size: 37 KB
South Holland District Council
Adequacy of Consultation Representation
Other
Size: 47 MB
6.2.5.2.2 Photomontages Part 4 Plates 1-2-1 to 1-2-5c
Other
Size: 432 KB
Section 55 Checklist
Other
Size: 1 MB
6.2.5.3.3 Regeneris Socioeconomics Impact Study
Other
Size: 682 KB
6.2.1.2 Consents Policy and Legislation
Other
Size: 32 MB
6.2.4.8.1Commercial Fisheries Technical Report
Other
Size: 40 MB
6.2.5.2.2 Photomontages Part 5 Plates 1-2-6 to 1-2-11c
Other
Size: 4 MB
6.2.2.1 Offshore Project Description
Other
Size: 420 KB
6.2.3.10 Air Quality
Other
Size: 29 MB
TK ES Application NTS
Other
Size: 332 KB
5.2 Environmental Protection Information - Statement of Engagement
Other
Size: 5 MB
6.2.5.7.2 WFD Assessment
Other
Size: 247 KB
8.7.8 Outline Pollution Prevention and Emergency Incident Response Plan
Other
Size: 14 MB
6.2.4.11.1 Maritime Cultural Heritage Baseline Technical Report
Other
Size: 12 MB
6.2.3.2 Landscape and Visual
Other
Size: 274 KB
Vol 1 Contents
Other
Size: 4 MB
6.2.3.11 Noise and Vibration
Other
Size: 162 KB
Norfolk County Council
Adequacy of Consultation Representation
Other
Size: 8 MB
2.6 Hedgerow Plans
Other
Size: 139 KB
8.7.6 Outline Artificial Light Emissions Plan
Other
Size: 2 MB
8.19 Additional Consents
Other
Size: 1 MB
6.2.3.6 Geology Hydrogeology and Ground Conditions
Other
Size: 34 KB
Nottinghamshire County Council
Adequacy of Consultation Representation
Other
Size: 28 MB
6.2.3.4 Terrestrial Ecology
Other
Size: 256 KB
Volume 3 Contents
Other
Size: 143 KB
8.7.10 Outline Communications Plan
Other
Size: 7 MB
8.8 Outline Landscape Strategy and Ecological Management Plan
Other
Size: 962 KB
8.7 Outline Code of Construction Practice
Other
Size: 17 KB
East Lindsey District Council
Adequacy of Consultation Representation
Other
Size: 45 MB
6.2.5.7.3 FRA Assessment
Other
Size: 11 MB
6.2.2.5 Fish and Shellfish Ecology
Other
Size: 3 MB
6.2.2.2 Marine Physical Environment
Other
Size: 147 KB
8.7.2 Outline Health and Safety Plan
Other
Size: 5 MB
8.6 Design Principles Document
Other
Size: 6 MB
6.2.3.5 Land Use Agriculture and Soils
Other
Size: 27 MB
8.17 Site selection and design report - Part-3 Appendices I to M
Other
Size: 2 MB
6.2.4.3.1 Red Throated Diver Technical Note
Other
Size: 15 MB
6.2.1.4 Site Selection and Alternatives
Other
Size: 2 MB
8.12 Outline Offshore WSI
Other
Size: 15 MB
8.11 Outline Onshore WSI
Other
Size: 18 MB
6.2.2.3 Marine and Intertidal Ornithology
Other
Size: 10 MB
6.2.3.9 Traffic and Access
Other
Size: 15 MB
6.2.2.9 Shipping and Navigation
Other
Size: 338 KB
8.2 Relationship of Application documents
Other
Size: 176 KB
8.7.9 Outline Construction Environmental Management Plan
Other
Size: 57 KB
Peterborough City Council
Adequacy of Consultation Representation
Other
Size: 12 MB
6.2.5.6.1 Geology baseline
Other
Size: 173 KB
Vol 5 contents
Other
Size: 3 MB
6.2.2.10 Other Marine Users
Other
Size: 7 MB
6.2.3.1 Onshore Project Description
Other
Size: 2 MB
6.2.4.9.1 Summary of TKOWF Array MNSRA
Other
Size: 10 MB
6.2.2.7 Nature Conservation
Other
Size: 17 MB
6.2.5.3.1 SocEcon baseline annex
Other
Size: 65 KB
Lincolnshire County Council
Adequacy of Consultation Representation
Other
Size: 6 MB
6.2.1.3.1 Cumulative Impact Assesment Annex
Other
Size: 20 MB
2.2 Works Plans
Other
Size: 7 MB
8.16 TK electrical works Evidence Plan April 2015
Other
Size: 767 KB
6.2.5.10.2 Air Quality Assessment
Other
Size: 9 MB
5.3 Report to Inform Appropriate Assessment
Other
Size: 5 MB
6.2.1.1 Introduction
Other
Size: 20 MB
6.2.2.4 Intertidal Subtidal Ecology
Other
Size: 35 MB
6.2.5.2.3 Comparison Photomontages
Other
Size: 279 KB
Volume 4 Offshore Annexes Contents
Other
Size: 2 MB
6.2.1.3.2 Transboundary Screening Matrix
Other
Size: 28 MB
6.2.5.2.2 Photomontages Part 3 Plates-1-1-11e to 1-1-12
Other
Size: 300 KB
Volume 2 - Contents
Other
Size: 348 KB
7.1 Safety Zone Statement
Other
Size: 22 MB
6.2.5.4.1 Ecology Baseline Report Part 2 Figures 3.2 to 6
Other
Size: 8 MB
2.5 Access to Works and Streets Plans
Other
Size: 103 KB
4.2 Funding Statement
Other
Size: 252 KB
6.2.1.3 Approach to EIA
Other
Size: 4 MB
4.1 Statement of Reasons
Other
Size: 6 MB
8.13 Outline Access Management Plan
Other
Size: 134 KB
8.7.4 Outline Air Quality Management Plan
Other
Size: 861 KB
8.4 Planning Statement
Other
Size: 34 MB
8.17 Site selection and design report - Part-2 Appendices C to H
Other
Size: 6 MB
6.2.4.5.1 Fish and Shellfish Technical Baseline Report
Other
Size: 28 MB
6.2.2.8 Commercial Fisheries
Other
Size: 715 KB
6.2.2.13 Conclusions and Summary of key issues
Other
Size: 17 MB
6.2.5.9.1 Traffic and Access Baseline
Other
Size: 45 KB
4.3 Book of Reference
Other
Size: 145 KB
1.1 Cover Letter
Other
Size: 3 MB
6.2.5.11.2 Noise Modelling of Intermediate Electrical Compound
Other
Size: 40 MB
5.1 Consultation Report
Other
Size: 37 MB
6.2.5.4.1 Ecology Baseline Report Part 3 Figures 6 to10
Other
Size: 973 KB
6.2.3.12 interrelationships Onshore
Other
Size: 19 MB
2.1 Order Limits Plans
Other
Size: 15 MB
6.2.1.1.1 Proposed Development Boundary and Order Limits Comparison
Other
Size: 2 MB
6.2.5.3.2 Recreational Fishing Baseline
Other
Size: 22 MB
6.2.5.8.1 Historical Environment Baseline
Other
Size: 496 KB
8.14 Outline Offshore Operations and Maintenance Plan
Other
Size: 2 MB
6.2.4.4.1 Benthic Ecology - Subtidal Ecology Technical Report
Other
Size: 8 MB
2.7 Public Rights of Way Plans
Other
Size: 3 MB
8.9 Outline Traffic Management Plan
Other
Size: 274 KB
8.7.7 Outline Site Waste Management Plan
Other
Size: 4 MB
8.7.1 Outline Construction Method Statement
Other
Size: 916 KB
8.3 Crossing Schedule
Other
Size: 5 MB
6.2.2.11 Marine Archaeology
Other
Size: 25 MB
8.18 Triton Knoll Interface Selection Assessment Report
Other
Size: 27 MB
6.2.5.2.2 Photomontages Part 6 Plates 1-3-1 to 1-3-7
Other
Size: 4 MB
6.2.3.3 Socio Economics Tourism and recreation
Other
Size: 1 MB
3.1 Draft Development Consent Order
Other
Size: 8 MB
6.2.3.7 Hydrology
Other
Size: 44 MB
6.2.5.2.2 Photomontages Part 2 Plates-1-1-6 to 1-1-11d
Other
Size: 4 MB
1.3 Copies of Newspaper Notices
Other
Size: 19 MB
6.2.5.4.1 Ecology Baseline Report Part 1 Report and Figure 3.1a-s
Other
Size: 9 MB
6.2.5.11.1 Noise and Vibration Baseline Report
Other
Size: 540 KB
Other
Size: 22 MB
Scoping Opinion
Secretary of State's Scoping Opinion for the proposed Triton Knoll Electrical System
Other
Size: 22 MB
The Applicants Scoping Report Triton Knoll Electrical Connection
The Applicants Scoping Report
Other
Size: 71 KB
131209 EN020019 Meeting with RWE
A note of a meeting between the Planning Inspectorate and RWE on the proposed Triton Knoll Electrical System project.
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.