Rail Central (Strategic Rail Freight Interchange)

The views expressed in this page do not represent those of the Planning Inspectorate. This page consists of content submitted to the Planning Inspectorate by the public and other interested parties, giving their views of this proposal.

Rail Central (Strategic Rail Freight Interchange)

Received 11 December 2018
From Tim Knights

Representation

DIRFT (Daventry) already serves this area, and is expanding. It is connected to the same motorway and rail routes as the Ashfield proposal.

The West Coast Main Line is already full. Additional trains from the proposed site would mean existing freight and passenger services would suffer detrimentally.

It is a needless intrusion into open countryside and farmland.

The trunk roads in the area, A45, A5, A43, M1 are already congested too often with existing level of traffic.