What happens next
This application was received by the Planning Inspectorate on 15/02/2023.
The applicant has agreed that all application documents can be published as soon as practicable to help everyone become familiar with the detail of what is being proposed in this application. The Planning Inspectorate will therefore make the application documents available as soon as practicable.
This provision is solely for the purpose of allowing more time to all those who wish to become familiar with the detail of what is being proposed ahead of the Registration and Relevant Representation period without lengthening the overall time required for the application process. There will be no opportunity at this stage to make comments on the application. However, if the application is accepted anyone interested in the application will be able to register and express their views during the Registration and Relevant Representation stage and the subsequent examination.
Timeline (3 items)


- Application expected from applicant
- Application received by the Planning Inspectorate