Tidal Lagoon Swansea Bay

Gallwch hidlo’r canlyniadau i ddangos yr eitemau sy’n cyfateb i’ch buddiant yn unig.

Dogfennau a Gyhoeddwyd Fesul Cam

Cyn cais (7)

Cais y datblygwr (548)

Derbyn (6)

Cyn archwiliad (27)

Archwiliad (739)

Penderfyniad (35)

Penderfywyd (23)

Dyddiad

SourceDescription
Other
Maint: 471 KB
5.1 A6.5 LPA sign off of SoCC
Other
Maint: 474 KB
5.1 A5.10 List of consultees at Phase 1C
Other
Maint: 1 MB
5.1 A7.1 PEIR s46 notice
Other
Maint: 438 KB
5.1 A5.11 Website updates
Other
Maint: 4 MB
5.5b Habitats Regulations Assessment Appendices
Other
Maint: 345 KB
5.1 A11.2 EIA Event attendees
Other
Maint: 25 MB
5.1 A6.13 s47 and s48 notices
Other
Maint: 1 MB
5.7 Statement in respect of Statutory Nuisance
Other
Maint: 2 MB
5.1 A5.1 Presentations to stakeholders Design D
Other
Maint: 894 KB
5.1 A3.5 Early project definition - presentation to stakeholders
Other
Maint: 2 MB
5.1 A2.3 Access strategy
Other
Maint: 1 MB
5.1 CR12 Conclusions
Other
Maint: 508 KB
5.1 A10.4 Schedule of notices served to PIL
Other
Maint: 5 MB
5.1 A7.6 PEIR NTS
Other
Maint: 9 MB
5.1 A6.11 Zone of Theoretical Visibility 24.09.13
Other
Maint: 567 KB
5.1 A6.8 Map of community consultation zones
Other
Maint: 13 MB
5.4 Natural Features Report
Other
Maint: 1 MB
5.1 A11.1 Invitation and Schedule EIA Presentation Event 221013
Other
Maint: 21 KB
5.6 Other consents and licences
Other
Maint: 760 KB
5.1 A10.6 PILS responses 280114
Other
Maint: 651 KB
5.1 A7.5 Preferred option and the PEIR presentation
Other
Maint: 5 MB
5.1 A6.10 Zone of Theoretical Visibility 19.06.13
Other
Maint: 2 MB
5.1 A2.2 Cable route iterations
Other
Maint: 933 KB
5.1 A10.7 Inland fishing table
Other
Maint: 2 MB
5.1 CR1 Introduction
Other
Maint: 262 KB
5.1 A3.3 List of NSB s47 consultees
Other
Maint: 5 MB
5.1 A3.7 Lagoon proposal summary brochure
Other
Maint: 740 KB
5.1 A2.6 Masterplan designs
Other
Maint: 3 MB
5.1 A11.3 Draft ES response table
Other
Maint: 3 MB
5.1 CR2 Project design evolution
Other
Maint: 374 KB
5.1 A3.2 List of s42d PILS
Other
Maint: 537 KB
5.1 A7.4 Notice issued to s42
Other
Maint: 6 MB
5.3 Historic Environment Report
Other
Maint: 1 MB
5.1 A5.8 Non stat cons - report on feedback
Other
Maint: 503 KB
5.1 A7.3 Notice to LPA s43
Other
Maint: 1 MB
5.1 CR4 Non-stat EIA scoping
Other
Maint: 297 KB
5.1 A6.4 Final Socc
Other
Maint: 4 MB
5.5a Habitats Regulations Assessment Report
Other
Maint: 370 KB
5.1 A11.5 Meetings with stat bodies - continuous engagement
Other
Maint: 397 KB
5.1 A5.7 Non stat cons - feedback form
Other
Maint: 751 KB
5.1 A6.3 LPA comments on the draft socc - response tracker
Other
Maint: 393 KB
5.1 A7.7 PEIR and NTS Deposit Locations and Event 161013
Other
Maint: 781 KB
5.1 A5.3 Sample letters to key stakeholders and E-newsletter
Other
Maint: 566 KB
5.1 A9.3 Community consultation questionnaire report
Other
Maint: 831 KB
5.1 A9.5 Public responses to PEIR (s47)
Other
Maint: 3 MB
5.1 A2.1 Lagoon Designs A-N
Other
Maint: 3 MB
5.1 A5.5 TLSB project introduction flyer
Other
Maint: 808 KB
5.1 A11.6 TLSB cultural sport and education programmes
Other
Maint: 6 MB
5.1 A6.9 Zone of Theoretical Visibility 06.06.12
Other
Maint: 2 MB
5.1 A4.1 Scoping responses table
Other
Maint: 13 MB
5.1 A9.1 Exhibition boards
Other
Maint: 4 MB
5.2 Flood Consequence Assessment
Other
Maint: 4 MB
5.1 A6.2 Draft consultation strategy and socc
Other
Maint: 675 KB
5.1 A5.6 Project film script and stills
Other
Maint: 359 KB
5.1 A6.12 s48 planning notices
Other
Maint: 1,010 KB
5.1 A3.4 All non stat cons and community cons
Other
Maint: 1 MB
5.1 CR6 SoCC defining and publicising
Other
Maint: 2 MB
5.1 A11.7 Bauman institute report
Other
Maint: 968 KB
5.1 A5.9 April Events publicity
Other
Maint: 2 MB
5.1 CR7 Stat cons with stat consultees
Other
Maint: 3 MB
5.1 CR9 Stat cons with local community
Other
Maint: 298 KB
5.1 A9.2 Community consultation questionnaire
Other
Maint: 11 MB
5.1 A5.4 Education Program Boards
Other
Maint: 288 KB
5.1 A7.2 s42 48 Notice DECC sos
Other
Maint: 602 KB
5.1 A5.2 Presentation to stakeholders E-M
Other
Maint: 378 KB
5.1 A3.6 List of consultees at Phase 1A
Other
Maint: 2 MB
5.1 CR11 Non-stat ongoing engagement
Other
Maint: 1 MB
5.1 A6.1 notice to LPA - consultation on SoCC
Other
Maint: 1 MB
5.1 A5.12 TLSB leisure facs feasibility study 120413
Other
Maint: 4 MB
5.5c Habitats Regulations Assessment Figure 1
Other
Maint: 2 MB
5.1 CR10 Stat cons with PILs
Other
Maint: 11 MB
5.1 A9.4 Publicity materials
Other
Maint: 2 MB
5.1 CR5 Non-stat issues and options
Other
Maint: 4 MB
5.1 A6.6 Consultation strategy
Other
Maint: 2 MB
5.1 CR3 Non-stat project def and EIA
Other
Maint: 352 KB
5.1 A11.8 Response to NRW
Other
Maint: 2 MB
5.1 A3.1 List of statutory consultees and stage consulted
Other
Maint: 426 KB
5.1 A7.8 Updates to website and OD
Other
Maint: 557 KB
5.1 A2.4 Building locations
Other
Maint: 238 KB
5.1 A11.4 Meetings with non-stat - continuous engagement
Other
Maint: 2 MB
5.1 A6.7 Schedule and copies of SoCC newspaper publications
Other
Maint: 2 MB
5.1 CR8 Stat cons with NSBs
Other
Maint: 12 MB
5.1 A10.1 10.2 and 10.3 Redline plans
Other
Maint: 2 MB
5.1 A10.5 Sample notice letters and redline plans
Other
Maint: 3 MB
5.1 A7.9 Formal Consultation Response to PEIR Report MASTER v0.4
Other
Maint: 678 KB
5.1 A2.5 Public realm
Other
Maint: 469 KB
5.1 A1.1 Index of Consultation Report Appendices
Other
Maint: 2 MB
5.1 A4.2 Welsh Govt MCU Scoping Opinion
Gellir hidlo dogfennau yn ôl eu dyddiad cyhoeddi neu yn ôl y dyddiad cau sy’n berthnasol iddynt. Cyhoeddir dyddiadau cau yn yr amserlen ar ddechrau’r archwiliad a gellir eu gweld ar dab amserlen yr archwiliad.