Dogfennau a Gyhoeddwyd Fesul Cam

Cyn cais (7)

Cais y datblygwr (548)

Derbyn (6)

Cyn archwiliad (27)

Archwiliad (739)

Penderfyniad (35)

Penderfywyd (23)

Dyddiad

SourceDescription
Other
Maint: 673 KB
Tidal Lagoon (Swansea Bay) Plc
Covering letter and submission. Submitted in response to s51 advice - dated 4 June 2014
Other
Maint: 175 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.19 Anchored vessels (14 days August 2013). Submitted in response to s51 advice.
Other
Maint: 117 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.6 Welsh noise map - industrial noise. Submitted in response to s51 advice.
Other
Maint: 160 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.12 Fishing vessel sightings data (2005-2009). Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.8 Comparison of Swansea WwTW impact optimism/mitigation options. Submitted in response to s51 advice.
Other
Maint: 175 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.4 10 year MAIB incident locations by type (within 5 miles of the Project). Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.2 Bus stop locations. Submitted in response to s51 advice.
Other
Maint: 650 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.11 Operational phase traffic on Fabian Way (eastbound). Submitted in response to s51 advice.
Other
Maint: 437 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.3 Area B - Queens dock oil terminal former tank storage areas and eastern lagoon seawall landfall. Submitted in response to s51 advice.
Other
Maint: 231 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.5 Section of the Lagoon seawall at more sheltered locations. Submitted in response to s51 advice.
Other
Maint: 140 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 6 - Revised Book of Reference (3A paragraph 20). Submitted in response to s51 advice.
Other
Maint: 461 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.56 Potential locations for construction support sites. Submitted in response to s51 advice.
Other
Maint: 593 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.8 Construction traffic on Fabian Way (eastbound). Submitted in response to s51 advice.
Other
Maint: 210 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.65 Turbine semi-goliath gantry crane. Submitted in response to s51 advice.
Other
Maint: 163 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.8 Distribution of Total Petroleum Hydrocarbons TPH in groundwater based on URS investigation of the former transit site tank farm area. Submitted in response to s51 advice.
Other
Maint: 874 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.4 Schematic representation of model and data interfaces. Submitted in response to s51 advice.
Other
Maint: 550 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.7 AIS data within 5nm buffer (28 days October 2012). Submitted in response to s51 advice.
Other
Maint: 208 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.61 Illustration of water flow between the sea and the Lagoon. Submitted in response to s51 advice.
Other
Maint: 651 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.12 Operational phase traffic on Fabian Way (two way flows). Submitted in response to s51 advice.
Other
Maint: 186 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.18 AIS data on busiest day (20th August 2013). Submitted in response to s51 advice.
Other
Maint: 171 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.25 Comparison of baseline and lagoon construction impacts on microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 114 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.35 Proposed access road with Port security entrance relocated. Submitted in response to s51 advice.
Other
Maint: 641 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.9 Comparison of baseline and lagoon operation impacts on microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 771 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.1 Swansea Bay study area water quality designations and key locations. Submitted in response to s51 advice.
Other
Maint: 282 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.32 Halfway point pearl. Submitted in response to s51 advice.
Other
Maint: 617 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.14 Sheet pile wall. Submitted in response to s51 advice.
Other
Maint: 174 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.9 Anchored vessels (56 days July and October 2012). Submitted in response to s51 advice.
Other
Maint: 461 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.3 Discharge sources model discharge locations and Smart Coast sample sites. Submitted in response to s51 advice.
Other
Maint: 916 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.10 Illustrative cross section of a bi-directional bulb fixed speed turbine. Submitted in response to s51 advice.
Other
Maint: 764 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.27 Sailing are within the Lagoon. Submitted in response to s51 advice.
Other
Maint: 214 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.57 Schematic layout of offices stores car parking site access control and plant yard. Submitted in response to s51 advice.
Other
Maint: 324 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.16 RYA overview of recreational cruising routes and facilities. Submitted in response to s51 advice.
Other
Maint: 629 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.3 Baseline traffic flows (westbound). Submitted in response to s51 advice.
Other
Maint: 573 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.9 Construction traffic on Fabian Way (two way flows). Submitted in response to s51 advice.
Other
Maint: 498 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.1 Proposed location of Project. Submitted in response to s51 advice.
Other
Maint: 454 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.28 Illustration of western landfall building. Submitted in response to s51 advice.
Other
Maint: 668 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.45 Cutter Suction Dredger. Submitted in response to s51 advice.
Other
Maint: 89 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 10 - Submission in respect of construction of temporary cofferdam (4B paragraph 26). Submitted in response to s51 advice.
Other
Maint: 398 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.5 Schematic representation of model application process. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.3a Groundwater flooding susceptibility (west). Submitted in response to s51 advice.
Other
Maint: 537 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.2 Swansea Bay Coastal Model - model grid and bathymetry. Submitted in response to s51 advice.
Other
Maint: 160 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.13 Fishing vessel satellite data (2009). Submitted in response to s51 advice.
Other
Maint: 522 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.64 Maximum flood tide current flow patterns in front of turbine house. Submitted in response to s51 advice.
Other
Maint: 629 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.2 Masterplan. Submitted in response to s51 advice.
Other
Maint: 3 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 3.2 Key difference between lagoon layout options J(3) and J(2). Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.22 Comparison of baseline and lagoon on nitrogen concentrations. Submitted in response to s51 advice.
Other
Maint: 176 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.10 Fishing vessels AIS tracks (28 days July 2012). Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Ltd
Annexe 5 - Updated Figure 7.18 Difference in baseline and lagoon operation temperatures. Submitted in response to s51 advice.
Other
Maint: 62 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.53 Sediment fill levels in sections during installation. Submitted in response to s51 advice.
Other
Maint: 473 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.26 Western landfall layout. Submitted in response to s51 advice.
Other
Maint: 309 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.3 RNLI bases in proximity to project. Submitted in response to s51 advice.
Other
Maint: 700 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.2 Western onshore Area (area a) including proposed western seawall landfall, Queens Dock and Grid Cable Route. Submitted in response to s51 advice.
Other
Maint: 773 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.25a Illustration of offshore Building. Submitted in response to s51 advice.
Other
Maint: 505 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.4 Area C showing the Crymlyn Burrows SSSI and grid connection route to the Baglan Bay substation. Submitted in response to s51 advice.
Other
Maint: 347 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.4 Section of the Lagoon seawall at exposed Locations. Submitted in response to s51 advice.
Other
Maint: 332 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.22 Location of three focal areas. Submitted in response to s51 advice.
Other
Maint: 105 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 8 - Submission in respect of location of turbine and sluice gate housing structure (4B paragraph 27). Submitted in response to s51 advice.
Other
Maint: 182 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.14 Recreational vessels (28 days July 2012). Submitted in response to s51 advice.
Other
Maint: 293 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 3 - Notices under s42(1)(d) of proposed application served in respect of properties on Bevans Row (1E paragraph 15). Submitted in response to s51 advice.
Other
Maint: 622 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.43 Key elements phase 3 construction. Submitted in response to s51 advice.
Other
Maint: 189 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.29 Comparison of operational Lagoon with turbines relocated and additional discharge on microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 633 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.46 Geotube filling - illustration of purpose modified installation vessel. Submitted in response to s51 advice.
Other
Maint: 672 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.55 Installing sheet piles harbour side. Submitted in response to s51 advice.
Other
Maint: 253 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.37 Cross-section of new access road. Submitted in response to s51 advice.
Other
Maint: 62 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 12.1 Terrestrial ecology study area. Submitted in response to s51 advice.
Other
Maint: 481 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.2 Location of noise sensitive receivers. Submitted in response to s51 advice.
Other
Maint: 126 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.4 Welsh noise map - road noise. Submitted in response to s51 advice.
Other
Maint: 102 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 22.2 Coastal recreational facilities Swansea bay. Submitted in response to s51 advice.
Other
Maint: 21 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 4 - Copy of representation by the Coal Authority on 30 July 2013 (1E paragraph 16). Submitted in response to s51 advice.
Other
Maint: 150 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.1 Principle navigational features in proximity to the Project. Submitted in response to s51 advice.
Other
Maint: 232 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.5 Illustration of extreme tide levels inside and outside of the Lagoon wall for 1 in 200 year current (2013) and climate change water levels. Submitted in response to s51 advice.
Other
Maint: 346 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.6 Schematic cross section indicating swale feature. Submitted in response to s51 advice.
Other
Maint: 87 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.60 Construction access routes. Submitted in response to s51 advice.
Other
Maint: 780 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.10 Comparision of effects of enhancement options on microbiological water quality dry weather - E Coli 100ml. Submitted in response to s51 advice.
Other
Maint: 69 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.58 Indicative batching plant layout. Submitted in response to s51 advice.
Other
Maint: 417 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.52 Plan of proposed operation of installing lower level tie rods. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.14 Predicted Lagoon impoundment 90 percentile and 95 percentile E Coli concentrations. Submitted in response to s51 advice.
Other
Maint: 504 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.13 Two main alternative turbine and sluice gate housing locations. Submitted in response to s51 advice.
Other
Maint: 332 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.13 Predicted changes in 90 percentile and 95 percentile FIO concentrations and Aberfan Sands DSP. Submitted in response to s51 advice.
Other
Maint: 179 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.19 Overview of grid connection route from Swansea Port. Submitted in response to s51 advice.
Other
Maint: 542 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.21 Plan of access road between Queen's Dock and the Lagoon. Submitted in response to s51 advice.
Other
Maint: 193 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.29 Eastern landfall viewing platform. Submitted in response to s51 advice.
Other
Maint: 470 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.24 Location of offshore Building. Submitted in response to s51 advice.
Other
Maint: 53 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 1 - Table of heights and dimensions in the draft DCO and the Statement of Reasons (1a paragraph 1). Submitted in response to s51 advice.
Other
Maint: 227 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.38 Cross section of new access road. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.19 Comparison of baseline and lagoon operation on maximum summer temperature. Submitted in response to s51 advice.
Other
Maint: 558 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.33 Key ecological proposals. Submitted in response to s51 advice.
Other
Maint: 632 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.10 Operational phase traffic on Fabian Way (westbound). Submitted in response to s51 advice.
Other
Maint: 187 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.28 Comparison of operational Lagoon and decommissioned lagoon impacts on microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.6 Vehicle access. Submitted in response to s51 advice.
Other
Maint: 591 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.6 AIS data within 15nm buffer (28 days July 2012). Submitted in response to s51 advice.
Other
Maint: 191 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.17 AIS data within 5nm buffer (14 days August 2013). Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.23 Difference in baseline and lagoon concentrations of nitrogen. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.21 Comparison of baseline and lagoon operation on winter salinity. Submitted in response to s51 advice.
Other
Maint: 465 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 1.3 Location of project and masterplan. Submitted in response to s51 advice.
Other
Maint: 153 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.2 SAR helicopter bases relative to Project. Submitted in response to s51 advice.
Other
Maint: 733 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.16 Comparison of effects of optimisation options on predicted annual 97 percentile microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 448 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.1 Location of key noise sensitive receptors. Submitted in response to s51 advice.
Other
Maint: 158 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.2 Location of key water features in study area. Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.11 Comparison of effects of enhancement options on microbiological water quality wet weather. Submitted in response to s51 advice.
Other
Maint: 83 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 9 - Submission in respect of location of ultra violet water treatment facility (4B paragraph 25). Submitted in response to s51 advice.
Other
Maint: 249 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.48 Second stage of the seawall construction. Submitted in response to s51 advice.
Other
Maint: 980 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.4 WFD Carboniferous coal measures groundwater waterbody. Submitted in response to s51 advice.
Other
Maint: 184 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 22.1 Port of Swansea context map. Submitted in response to s51 advice.
Other
Maint: 638 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.50 Cross section of twin wall sheet pile cofferdam. Submitted in response to s51 advice.
Other
Maint: 445 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.8 AIS vessels track busiest day (3rd July 2012). Submitted in response to s51 advice.
Other
Maint: 186 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.21 Recreational vessels (14 days August 2013). Submitted in response to s51 advice.
Other
Maint: 173 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.15 Indicative layout of dolphin piles. Submitted in response to s51 advice.
Other
Maint: 116 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.5 Welsh noise map - rail noise. Submitted in response to s51 advice.
Other
Maint: 535 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 16.2 Wind Rose, Pembury sands (2012). Submitted in response to s51 advice.
Other
Maint: 131 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.24 Comparison of baseline and Lagoon impacts on dissolved oxygen concentrations. Submitted in response to s51 advice.
Other
Maint: 294 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 16.3 Comparison of measured and modelled nitrogen dioxide concentrations.. Submitted in response to s51 advice.
Other
Maint: 123 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 2 - Table of dimensions of all elements of Project
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 17.3b Groundwater flooding susceptibility - east. Submitted in response to s51 advice.
Other
Maint: 566 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.16 Example of safety boom proposed. Submitted in response to s51 advice.
Other
Maint: 177 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.11 Fishing vessels AIS tracks (28 days October 2012). Submitted in response to s51 advice.
Other
Maint: 608 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.41 Key elements phase 1 construction. Submitted in response to s51 advice.
Other
Maint: 204 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.36 Access track to eastern landfall. Submitted in response to s51 advice.
Other
Maint: 340 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.12 predicted changes in 90 percentile and 95 percentile FIO concentrations at Swansea bay DSP. Submitted in response to s51 advice.
Other
Maint: 234 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.47 First stage of the seawall construction. Submitted in response to s51 advice.
Other
Maint: 608 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.4 Baseline traffic flows (eastbound). Submitted in response to s51 advice.
Other
Maint: 641 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.30 Landward Ecological Park. Submitted in response to s51 advice.
Other
Maint: 306 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.9 Dredging Option B less extensive deeper option for dredging. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 7.15 Predicted Lagoon impoundment 90 percentile and 95 percentile Enterococci concentrations. Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.26 Comparison of Baseline and increased decay rates on microbiological water quality. Submitted in response to s51 advice.
Other
Maint: 279 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.54 Illustrative cross section of seawall without Geotubes. Submitted in response to s51 advice.
Other
Maint: 7 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 7 - Revised Land Plan 7A (3A paragraph 20). Submitted in response to s51 advice.
Other
Maint: 843 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.40 Plan of water shuttle service. Submitted in response to s51 advice.
Other
Maint: 470 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.63 Maximum ebb tide current flow patterns in front and oblique to turbine house. Submitted in response to s51 advice.
Other
Maint: 480 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.3 Location of underwater noise monitoring locations. Submitted in response to s51 advice.
Other
Maint: 350 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.31 Location of sculptural elements. Submitted in response to s51 advice.
Other
Maint: 356 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.8 Dredging Option A extensive shallow option for dredging. Submitted in response to s51 advice.
Other
Maint: 131 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 18.9 Distribution of benzene in groundwater based on URS investigation of the former. Submitted in response to s51 advice.
Other
Maint: 44 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 3.1 Areas of high tidal range around England and Wales. Submitted in response to s51 advice.
Other
Maint: 205 KB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.27 Average dilution as log10 of contaminants from de-watering. Submitted in response to s51 advice.
Other
Maint: 655 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.42 Key elements phase 2 construction. Submitted in response to s51 advice.
Other
Maint: 384 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.34 Access to Lagoon off Fabian Way. Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.1 Study Area. Submitted in response to s51 advice.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.20 Fishing vessels (14 days August 2013). Submitted in response to s51 advice.
Other
Maint: 416 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.5 10 year RLNI incidents by casualty type (within 5nm of the site). Submitted in response to s51 advice.
Other
Maint: 57 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.49 Temporary cofferdam - option 1 using rock armour. Submitted in response to s51 advice.
Other
Maint: 311 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 2.1 Outline project programme. Submitted in response to s51 advice.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) PLC
Annexe 5 - Updated Figure 7.20 Difference in mean salinity between baseline and operational lagoon. Submitted in response to s51 advice.
Other
Maint: 540 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.7 Construction traffic on Fabian Way (westbound). Submitted in response to s51 advice.
Other
Maint: 617 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 15.5 Baseline traffic flows (two way). Submitted in response to s51 advice.
Other
Maint: 349 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.59 Indicative steel fabrication yard layout Area C. Submitted in response to s51 advice.
Other
Maint: 263 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 19.7 Visitor facilities locations. Submitted in response to s51 advice.
Other
Maint: 61 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.62 Lagoon operating cycle. Submitted in response to s51 advice.
Other
Maint: 95 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.1 Location of the Project. Submitted in response to s51 advice.
Other
Maint: 387 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.6 Section of Lagoon seawall using conventional construction. Submitted in response to s51 advice.
Other
Maint: 839 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.3 Lagoon layout option J(3) on Admiralty Chart background. Submitted in response to s51 advice.
Other
Maint: 503 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.11 Illustration elevation of sluice gate. Submitted in response to s51 advice.
Other
Maint: 777 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.44 Target construction programme. Submitted in response to s51 advice.
Other
Maint: 175 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 14.15 Recreational vessels (28 days October 2012). Submitted in response to s51 advice.
Other
Maint: 393 KB
Tidal Lagoon (Swansea Bay) Plc
Annexe 5 - Updated Figure 4.51 Illustration of installation of sheet piles. Submitted in response to s51 advice.
Gellir hidlo dogfennau yn ôl eu dyddiad cyhoeddi neu yn ôl y dyddiad cau sy’n berthnasol iddynt. Cyhoeddir dyddiadau cau yn yr amserlen ar ddechrau’r archwiliad a gellir eu gweld ar dab amserlen yr archwiliad.