Tidal Lagoon Swansea Bay

Gallwch hidlo’r canlyniadau i ddangos yr eitemau sy’n cyfateb i’ch buddiant yn unig.

Dogfennau a Gyhoeddwyd Fesul Cam

Cyn cais (7)

Cais y datblygwr (548)

Derbyn (6)

Cyn archwiliad (27)

Archwiliad (739)

Penderfyniad (35)

Penderfywyd (23)

Dyddiad

Mae’r dudalen hon yn cynnwys sylwadau a dderbyniwyd gan yr Arolygiaeth Gynllunio mewn perthynas â’r:

  1. 1. cynrychiolaethau a wnaed ynglŷn â’r cais (gan gynnwys ymatebion i gyfres gyntaf o gwestiynau’r Awdurdod Archwilio) a’r
  2. 2. ymatebion i gyfres ddilynol o gwestiynau’r Awdurdod Archwilio.

Mae’n ofynnol i’r Arolygiaeth Gynllunio sicrhau bod y sylwadau hyn ar gael yn unol â Rheol 3(5) and Rheol 21 of the Rheolau Cynllunio Seilwaith (Gweithdrefn Archwilio) 2010.

SourceDescription
Other
Maint: 13 KB
Pontardawe and Swansea Angling Society Ltd
Representation accepted by the Examining Authority in to the examination. Attatchment to email was not accepted.
Other
Maint: 2 MB
Geraint Davies MP
Representation accepted by the Examining Authority in to the examination.
Other
Maint: 3 MB
The Crown Estate
Position Statement - Crown Consent under s.135. Submitted for Deadline VI of 25 November 2014. (Publication delayed to verify contents. Substance also contained in TLSB Appendix C to Note on Crown Consents, published 26/11/2014)
Other
Maint: 1 MB
Dwr Cymru Welsh Water � Withdrawn
Withdrawal of Objection. Accepted by the Examining Authority as a late submission for Deadline VI of 25 November 2014.
Other
Maint: 293 KB
Maritime and Coastguard Agency
Response to the draft DCO. Accepted by the Examining Authority as a late submission for Deadline VI of 25 November 2014.
Other
Maint: 225 KB
Natural Resources Wales
Letter to TLSB - S.150 Consents. Accepted by the Examining Authority as a late submission for Deadline VI of 25 November 2014.
Other
Maint: 31 KB
Swansea University
Summary of Case and Further Written Representations. Submitted for Deadline VI of 25 November 2014
Other
Maint: 73 KB
Baglan Operations Limited, Baglan Pipeline Limited, and Baglan Generating Limited
Position Statement. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 115 MB
Tidal Lagoon (Swansea Bay) Plc
Section 106 Planning Agreement (25.11.2014) - Clean. Submitted Late for Deadline VI of 25 November 2014.
Other
Maint: 171 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix C to Note addressing s.150 consents. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 12 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing updated plans. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 115 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing piling in Area F Slurry Wall (Panel note item 9). Submitted for Deadline VI of 25 November 2014.
Other
Maint: 344 KB
Tidal Lagoon (Swansea Bay) Plc
RIES (track changes). Submitted for Deadline VI of 25 November 2014. (Replaced 27/11/2014 to ensure visibility of track changes)
Other
Maint: 671 KB
Royal Society for the Protection of Birds
Comments on the draft DCO and AEMP version 3. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 157 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix A to Note addressing s.150 consents. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 3 MB
Natural Resources Wales
Further Written Representation. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 256 KB
Tidal Lagoon (Swansea Bay) Plc
Covering letter. Submitted Late for Deadline VI of 25 November 2014.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
CEMP (25 November 2014) - clean. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 631 KB
Tidal Lagoon (Swansea Bay) Plc
DCO Validation Report. Submitted Late for Deadline VI of 25 November 2014
Other
Maint: 241 KB
Tidal Lagoon (Swansea Bay) Plc
TLSB and Natural Resources Wales - SoCG. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 250 KB
Tidal Lagoon (Swansea Bay) Plc
TLSB comment on responses to 4 November consultation. Submitted Late for Deadline VI of 25 November 2014.
Other
Maint: 9 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing Section 106 Agreement. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 86 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix A to Note addressing s106 Agreement. Submitted Late for Deadline VI of 25 November 2014.
Other
Maint: 138 KB
Associated British Ports
Written Representation and Further Comments. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 468 KB
Welsh Government
Written Representation. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 140 KB
Tidal lagoon (Swansea Bay) Plc
Book of Reference (25 November 2014). Submitted for Deadline VI of 25 November 2014.
Other
Maint: 187 KB
Tidal Lagoon (Swansea Bay) Plc
TLSB and The Royal Yachting Association - SoCG. Submitted for Deadline VI of 25 November 2014
Other
Maint: 11 MB
Tidal Lagoon (Swansea Bay) Plc
AEMP (25 November 2014) - track. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Land Plans (2.1.3c, 2.1.4b-2.1.20b). Submitted for Deadline VI of 25 November 2014.
Other
Maint: 664 KB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO - 25 November 2014 - Clean. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 42 KB
Tidal Lagoon (Swansea Bay) Plc
Table addressing open space (R2). Submitted for Deadline VI of 25 November 2014.
Other
Maint: 207 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix A to Note on Crown consents. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 254 KB
Neath Port Talbot County Borough Council
Written Representation and Further Comments. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 611 KB
Western Power Distribution
Withdrawal of Objection re. s127 and 138 PA2008 and Further Representation. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 36 MB
Tidal Lagoon (Swansea Bay) Plc
Works Plans (ref 2.2.2B - 2.2.10B). Submitted for Deadline VI of 25 November 2014.
Other
Maint: 163 KB
Trinity House
Comment on the consultation draft of the DCO dated 11 November 2014. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 639 KB
Tidal Lagoon (Swansea Bay) Plc
Commentary on ExA's Version of draft DCO published 11 November 2014. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 105 KB
Tony Colburn
Written representation submitted for Deadline VI of 25 November 2014.
Other
Maint: 39 MB
Tidal Lagoon (Swansea Bay) Plc
Overlay Plans (2.5.2C, 2.5.3B-2.5.10B). Submitted for Deadline VI of 25 November 2014.
Other
Maint: 83 KB
Jill and Brian Burgess
Comment on Applicant's Note Addressing Mitigation re. AEMP (Item 14 of 4 November submission). Submitted for Deadline VI of 25 November 2014.
Other
Maint: 1 MB
Dan Morrissey (UK) Limited � Withdrawn
Withdrawal of Objection.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Response to Deadline V Submissions. Submitted Late for Deadline VI of 25 November 2014.
Other
Maint: 120 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing DCO guidance (Panel note item 4). Submitted for Deadline VI of 25 November 2014.
Other
Maint: 660 KB
Tidal Lagoon (Swansea Bay) Plc
TLSB and City and County of Swansea Council - SoCG. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 43 KB
Pontardawe and Swansea Angling Society
Summary of Representations made to the Examination and Further Representation. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 117 KB
Fish Legal
Written Representation. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 953 KB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO - Clean - 25 November 2014 - Submitted Late as a Word document for Deadline VI of 25 November 2014.
Other
Maint: 115 MB
Tidal Lagoon (Swansea Bay) Plc
Section 106 Planning Agreement (25.11.2014) - tracked. Submitted Late for Deadline VI of 25 November 2014.
Other
Maint: 221 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing likely significant effects on Crymlyn Burrows. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 26 KB
Tidal Lagoon (Swansea Bay) Plc
TLSB Commentary on updated DCO. Submitted Late for Deadline VI of 25 November 2014.
Other
Maint: 85 KB
Public Health England
Written Representation. Submitted for Deadline VI of 25 November 2014
Other
Maint: 634 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix C to Note on Crown consents. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 716 KB
Tidal Lagoon (Swansea Bay) Plc
S106 Appendix E - Draft Development Consent Order. Submitted Late for Deadline VI of 25 November 2014.
Other
Maint: 788 KB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO - 25 November 2014 - showing tracked changes from 4 November 2014 version. Submitted for Deadline VI of 25 November 2014
Other
Maint: 389 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix B to Note on Crown consents. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 133 KB
Tidal Lagoon (Swansea Bay) Plc
Table addressing statutory undertakers and relevant land plots (Panel note item 1). Submitted Late for Deadline VI of 25 November 2014.
Other
Maint: 17 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing s.150 consents. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 15 KB
Porthcawl Environment Trust
Comments relating to the need for an EPS Licence. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 41 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix B to Note addressing s106 Agreement. Submitted Late for Deadline VI of 25 November 2014.
Other
Maint: 483 KB
City and County of Swansea
SoCG and Further Representation. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 89 KB
Tidal Lagoon (Swansea Bay) Plc
Submission addressing RIES. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 99 KB
Dan Morrissey (UK) Limited � Withdrawn
Position Statement. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 54 KB
Rhossili Working Group
Comment on the RIES and Revised DCO. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 259 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix B to Note addressing s.150 consents. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 167 KB
Natural Resources Wales
Update on the WFD Article 4(7) derogation process and Email to the Applicant. Submitted for Deadline VI of 25 November 2014. (Replaced 27/11/2014 to include email to the Applicant)
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO - tracked - 25 November 2014 - Showing tracked changes from original application version. Submitted Late as a Word document for Deadline VI of 25 November 2014.
Other
Maint: 851 KB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO - 25 November 2014 - showing tracked changes from original application version. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 319 KB
Tidal Lagoon (Swansea Bay) Plc
Cover note with response to NRW comments on Crymlyn Burrows note. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO - 25 November 2014 - Showing tracked changes from 4 November 2014 version. Submitted Late as a Word document for Deadline VI of 25 November 2014
Other
Maint: 224 KB
Tidal Lagoon (Swansea Bay) Plc
Commentary on ExA note of information. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 504 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing sediment sources and dredging (Panel Note Items 7 & 8). Submitted for Deadline VI of 25 November 2014.
Other
Maint: 901 KB
Tidal Lagoon (Swansea Bay) Plc
CEMP (25 November 2014) - track. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 13 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing crown consents. Submitted for Deadline VI of 25 November 2014.
Other
Maint: 18 KB
Tidal Lagoon (Swansea Bay) Plc
Index of Submission - Deadline VI. Submitted Late for Deadline VI of 25 November 2014.
Other
Maint: 39 KB
Peter A. Ross
Representation accepted by the Examining Authority in to the examination.
Other
Maint: 11 KB
Matthew Cartmill
Representation accepted by the Examining Authority in to the examination.
Other
Maint: 335 KB
National Grid Electricity Transmission plc
Withdrawal of objection.
Other
Maint: 365 KB
Tidal lagoon Swansea Bay Plc
Note addressing mitigation actions and management plans-AEMP (panel item 11) Submitted 4 November 2014 for Deadline V (Replacement due to formatting error).
Other
Maint: 1 MB
Miss. E. Harry
Representation accepted by the Examining Authority in to the examination.
Other
Maint: 114 KB
Health and Safety Executive
Response to additional information. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 107 KB
Gerald Conyngham
Representation accepted by the Examining Authority in to the examination
Other
Maint: 394 KB
Tidal Lagoon Swansea Bay Plc
Note addressing mitigation actions and management plans-OEMP (panel item 11) Submitted 4 November 2014 for Deadline V (Replacement due to formatting error).
Other
Maint: 436 KB
Tidal Lagoon Swansea Bay Plc
Note addressing mitigation actions and management plans-CEMP (panel item 11) Submitted 4 November 2014 for Deadline V (Replacement due to formatting error).
Other
Maint: 382 KB
Tidal lagoon Swansea Bay Plc
Copy of notification of consultation
Other
Maint: 460 KB
Sian James MP
Representation accepted by the Examining Authority in to the examination
Other
Maint: 192 KB
Dr Hywel Francis MP
Representation accepted by the Examining Authority in to the examination.
Other
Maint: 10 MB
Tidal Lagoon (Swansea Bay) Plc
Access and Public rights of way Key plan Submitted 4 November 2014 for Deadline V
Other
Maint: 573 KB
Tidal Lagoon (Swansea Bay) Plc
Draft development consent order (Clean) Submitted 4 November 2014 for Deadline V
Other
Maint: 477 KB
Tidal Lagoon (Swansea Bay) Plc
Updated OEMP (tracked) Submitted 4 November 2014 for Deadline V
Other
Maint: 179 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing coastal processes (panel item 4) Submitted 4 November 2014 for Deadline V
Other
Maint: 109 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing mitigation actions and management plans-OEMP (panel item 11) Submitted 4 November 2014 for Deadline V
Other
Maint: 140 KB
Tidal Lagoon (Swansea Bay) Plc
Updated book of reference Submitted 4 November 2014 for Deadline V
Other
Maint: 56 KB
Tidal Lagoon (Swansea Bay) Plc
Schedule of plans Submitted 4 November 2014 for Deadline V
Other
Maint: 870 KB
Tidal Lagoon (Swansea Bay) Plc
Draft development consent order (tracked) Submitted 4 November 2014 for Deadline V
Other
Maint: 204 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing suitability of aspects of the project to adaptive management (panel item 2) Submitted 4 November 2014 for Deadline V
Other
Maint: 93 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing ship simulation (panel item 15) Submitted 4 November 2014 for Deadline V
Other
Maint: 42 KB
Fish Legal
Representation to Examining Authority Submitted 4 November 2014 for Deadline V
Other
Maint: 644 KB
Tidal Lagoon (Swansea Bay) Plc
Response to deadline IV Submitted 4 November 2014 for Deadline V
Other
Maint: 16 KB
Pontardawe and Swansea Angling Society Ltd
Submitted 4 November 2014 for Deadline V
Other
Maint: 78 KB
Tidal Lagoon (Swansea Bay) Plc
Index of submission Submitted 4 November 2014 for Deadline V
Other
Maint: 241 KB
Tidal Lagoon (Swansea Bay) Plc
Cover letter Submitted 4 November 2014 for Deadline V
Other
Maint: 8 MB
Tidal Lagoon (Swansea Bay) Plc
Access and Public rights of way key plan (sheet 2 of 11) submitted 4 November 2014 for Deadline V
Other
Maint: 739 KB
Tidal Lagoon (Swansea Bay) Plc
Draft section 106 agreement (panel item 1) Submitted 4 November 2014 for Deadline V
Other
Maint: 159 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing mitigation actions and management plans-AEMP (panel item 11) Submitted 4 November 2014 for Deadline V
Other
Maint: 77 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing seaward extent of plots 16005 and 0510 (panel item 38) Submitted 4 November 2014 for Deadline V
Other
Maint: 75 KB
Tidal Lagoon (Swansea Bay) Plc
Representations made outside of deadline Submitted 4 November 2014 for Deadline V
Other
Maint: 137 KB
Tidal Lagoon (Swansea Bay) Plc
Updated commentary on panels note of information Submitted 4 November 2014 for Deadline V
Other
Maint: 134 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing relevance of worst case scenarios (panel item 3) Submitted 4 November 2014 for Deadline V
Other
Maint: 714 KB
Natural Resources Wales
Appendix 1- Revised report- Mud sources and depositional processes in Swansea Bay. Submitted 4 November 2014 for Deadline V
Other
Maint: 244 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing heavy metals (panel item 36) Submitted 4 November 2014 for Deadline V
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Updated CEMP (clean) Submitted 4 November 2014 for Deadline V
Other
Maint: 7 MB
Tidal Lagoon (Swansea Bay) Plc
Updated land plans Submitted 4 November 2014 for Deadline V
Other
Maint: 443 KB
Tidal Lagoon (Swansea Bay) Plc
Updated OEMP (Clean) Submitted 4 November 2014 for Deadline V
Other
Maint: 152 KB
Tidal Lagoon (Swansea Bay) Plc
Commentary on Draft development consent order (panel item 31) Submitted 4 November 2014 for Deadline V
Other
Maint: 259 KB
Natural Resources Wales
Deadline V response to panel note Submitted 4 November 2014 for Deadline V
Other
Maint: 138 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing mitigation actions and management plans-CEMP (panel item 11) Submitted 4 November 2014 for Deadline V
Other
Maint: 75 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing likely significant effects on Crymlyn Burrows (panel item 5) Submitted 4 November 2014 for Deadline V
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Updated CEMP (tracked) Submitted 4 November 2014 for Deadline V
Other
Maint: 7 MB
Tidal Lagoon (Swansea Bay) Plc
Access and Public rights of way Key plan (sheet 3 of 11) Submitted 4 November 2014 for Deadline V
Other
Maint: 138 KB
Baglan Operations Limited, Baglan Pipeline Limited, and Baglan Generating Limited
Written Representation Submitted for Deadline V of 28 October 2014
Other
Maint: 48 KB
Baglan Bay Company Limited
Withdrawal of objection. Submitted for Deadline V of 28 October 2014
Other
Maint: 71 KB
Tidal Lagoon (Swansea Bay) Plc
Paper of alternative DCO drafting (Panel Note Item 20). Submitted for Deadline V of 28 October 2014.
Other
Maint: 246 KB
Neath Port Talbot County Borough Council
Comments on Deadline IV Submissions, Response to Panel?s Note Published 27 October and Response to 7 October Draft DCO. Submitted for Deadline V of 28 October 2014.
Other
Maint: 4 MB
Tidal Lagoon (Swansea Bay) Plc
Report on article 4.7 WFD derogation and summary (panel note item 6). Submitted for Deadline V of 28 October 2014.
Other
Maint: 4 MB
St Modwen Properties plc
Summary of Oral Case made at 22 and 23 October Hearings. Submitted for Deadline V of 28 October 2014
Other
Maint: 847 KB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO (doc ref 3.1) - (Tracked). Submitted for Deadline V of 28 October 2014.
Other
Maint: 525 KB
Tidal Lagoon (Swansea Bay) Plc
Draft DCO (doc ref 3.1) - (Clean). Submitted for Deadline V of 28 October 2014.
Other
Maint: 5 MB
Tidal Lagoon (Swansea Bay) Plc
AEMP (doc ref 6.2, app 4.1) - (Tracked Only). Submitted for Deadline V of 28 October 2014.
Other
Maint: 148 KB
Tidal Lagoon (Swansea Bay) Plc
Written Summary of Oral Case made at Compulsory Acquisition Hearing 23 October. Submitted for Deadline V of 28 October 2014.
Other
Maint: 657 KB
Associated British Ports
Written Representation and Summary of Oral Case made at hearings commencing 21 October. Submitted for Deadline V of 28 October 2014.
Other
Maint: 209 KB
Tidal Lagoon (Swansea Bay) Plc
TLSB-NRW SoCG - SLVIA and natural and built Environment. Submitted for Deadline V of 28 October 2014.
Other
Maint: 715 KB
Tidal Lagoon (Swansea Bay) Plc
Cover Letter Submitted for Deadline V of 28 October 2014
Other
Maint: 299 KB
City and County of Swansea
Summary of Oral Case made at Hearings Commencing 21 October, Responses to Agenda Items and Other Comments. Submitted for Deadline V of 28 October 2014
Other
Maint: 3 MB
Porthcawl Environment Trust
Written Representation Submitted for Deadline V of 28 October 2014
Other
Maint: 28 KB
Tidal Lagoon (Swansea Bay) Plc
List of other consents required (doc ref 5.6) - (Clean). Submitted for Deadline V of 28 October 2014.
Other
Maint: 106 KB
Tidal Lagoon (Swansea Bay) Plc
TLSB-NRW SoCG - onshore traffic, noise, dust & vibration. Submitted for Deadline V of 28 October 2014.
Other
Maint: 291 KB
Dan Morrissey (UK) Limited � Withdrawn
Written Representation Submitted for Deadline V of 28 October 2014
Other
Maint: 3 MB
Tidal Lagoon (Swansea Bay) Plc
Flood defences plan referred to in requirement 27 of draft DCO. Submitted for Deadline V of 28 October 2014.
Other
Maint: 1 MB
Pontardawe and Swansea Angling Society Ltd
Written Representation Submitted for Deadline V of 28 October 2014.
Other
Maint: 35 KB
Rhossili Working Group
Response to Issue Specific Hearing of 21st October 2014. Submitted for Deadline V of 28 October 2014
Other
Maint: 111 KB
Fish Legal
Comments on Deadline IV Submissions and Comments in Relation to the EIA Regulations 2009. Submitted for Deadline V of 28 October 2014.
Other
Maint: 704 KB
Natural Resources Wales
Summary of Oral Case made at 21 and 22 October Hearings. Submitted for Deadline V of 28 October 2014.
Other
Maint: 3 MB
Swansea University
Summary of Oral Case made at 22 and 23 October Hearings and Further Written Representation. Submitted for Deadline V of 28 October 2014.
Other
Maint: 12 MB
Tidal Lagoon (Swansea Bay) Plc
Response to requests for information in relation to coastal processes by NRW. Submitted for Deadline V of 28 October 2014.
Other
Maint: 70 KB
Tidal Lagoon (Swansea Bay) Plc
Index of Submissions - Submitted for Deadline V of 28 October 2014
Other
Maint: 397 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing (i) access & (ii) boating (Panel Note Item 21). Submitted for Deadline V of 28 October 2014.
Other
Maint: 4 MB
St Modwen Developments Limited
Summary of Oral Case made at 22 and 23 October Hearings. Submitted for Deadline V of 28 October 2014
Other
Maint: 163 KB
Tidal Lagoon (Swansea Bay) Plc
TLSB-NRW SoCG - flooding. Submitted for Deadline 28 October 2014.
Other
Maint: 577 KB
Tidal Lagoon (Swansea Bay) Plc
Written Summary of Oral Case made at Issue Specific Hearings 21 and 22 October + Design and News Release Annexes. Submitted for Deadline V of 28 October 2014
Other
Maint: 4 MB
St Modwen Properties VIII Sarl
Summary of Oral Case made at 22 and 23 October Hearings. Submitted for Deadline V of 28 October 2014
Other
Maint: 29 KB
Tidal Lagoon (Swansea Bay) Plc
Updated list of other consents required (doc ref 5.6) - (Tracked). Submitted for Deadline V of 28 October 2014.
Other
Maint: 542 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing NRW Comments on AEMP (Panel Note Item 11). Submitted for Deadline V of 28 October 2014.
Other
Maint: 14 KB
Pontardawe and Swansea Angling Society Ltd
Comments on the Draft Development Consent Order submitted for Deadline IV of 7 October 2014.
Other
Maint: 65 KB
St Modwen Developments Ltd, St Modwen Properties Plc and St Modwen Properties VIII Sarl
Submission to clarify written representation. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 26 KB
Michael Kirby
Non Interested Party - Written submission for Deadline IV of 7 October 2014. Submission accepted by the ExA.
Other
Maint: 106 KB
Public Health Wales
Response to additional information. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 71 KB
Public Health Wales
Response to Rule 17 and Rule 8 submitted for Deadline IV of 7 October 2014
Other
Maint: 14 KB
Kaye Chambers
Non Interested Party - Written submission for Deadline IV of 7 October 2014. Submission accepted by the ExA.
Other
Maint: 57 KB
Swansea City and Council
Comments of Draft Development Consent Order submitted for Deadline IV of 7 October 2014.
Other
Maint: 42 KB
Pontardawe and Swansea Angling Society Ltd
Submission in relation to Issue Specific Hearings commencing 16 September 2014.
Other
Maint: 39 MB
Tidal Lagoon (Swansea Bay) Plc
Land and Works Plan Overlay: Sheets 1-9. Submitted for Deadline IV of October 2014.
Other
Maint: 69 KB
Dr Pamela Muirhead
Further response to Issue Specific Hearing of 17 September 2014. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 4 MB
Tidal Lagoon (Swansea Bay) Plc
Agreed list of the key elements of the Project (CCSC and NPTCBC) submitted for Deadline IV of 7 October 2014.
Other
Maint: 680 KB
Royal Society for the Protection of Birds
Comments on additional information submitted by the applicant submitted for Deadline IV of 7 October 2014
Other
Maint: 50 KB
Rhossili Working Group
Response to Appendix 5.8.1 of Marine Mammals Chapter in Report R2286 and Issue Specific Hearing of 17 September 2014. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 248 KB
Swansea City and County
Written representations submitted for Deadline IV of 7 October 2014
Other
Maint: 38 MB
Tidal Lagoon (Swansea Bay) Plc
Overlay of Land Plans and Works Plans submitted with the Application (doc ref 2.1 and 2.2) submitted for Deadline IV of 7 October 2014.
Other
Maint: 274 KB
Welsh Government
Comments on Draft Development Consent Order submitted for Deadline IV of 7 October 2014
Other
Maint: 4 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan: Sheet 8 of 9. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 140 KB
Tidal Lagoon (Swansea Bay) Plc
Updated Book of Reference (BoR) submitted for Deadline IV of 7 OCtober 2014.
Other
Maint: 4 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Planning Drawing - offshore building public realm sections. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 111 KB
Tidal Lagoon (Swansea Bay) Plc
Updated list of other consents required (track changed version) submitted for Deadline IV of 7 October 2014
Other
Maint: 84 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing engineering solutions in respect of Sabellaria and monitoring/adaptive management submitted for Deadline IV of 7 October 2014.
Other
Maint: 8 MB
Tidal Lagoon (Swansea Bay) Plc
Written summary of TLSB's oral submissions made at compulsory acquisition hearings. Submitted for Deadline IV of 7 October 2014
Other
Maint: 851 KB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan - Marine Works, Seawall Section: Sheet 5. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 375 KB
Monkstone Cruising and Sailing Club
Written submission for Deadline IV of 7 October 2014.
Other
Maint: 2 MB
Baglan Operations Ltd, Baglan Pipelines Ltd and Baglan Generating Ltd
Joint Submission - Schedule of Exhibits for compulsory acquisition hearing 30 September 2014. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 45 KB
Swansea City and Council
Definitions of Significance submitted for Deadline IV of 7 October 2014
Other
Maint: 2 MB
University of Wales Trinity Saint David
Written submission in lieu of an oral representation and comment on issues raised at the Issue Specific Hearing of 16 September 2014. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 704 KB
Tidal Lagoon (Swansea Bay) Plc
Updated Planning Drawing - Marine Works, Turbine and Sluice Gate Housing: Elevation. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 553 KB
Tidal Lagoon (Swansea Bay) Plc
Additional note to the ES regarding anecdotal information on seals in and around Swansea Bay submitted for Deadline IV of 7 October 2014.
Other
Maint: 135 KB
Public Health England
Comments on additional information. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Updated land plans reflecting a reduction in the red line boundary of the project and showing realignment of part of project access road. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 115 KB
Natural Resources Wales
response to panel note submitted for Deadline IV of 7 October 2014.
Other
Maint: 232 KB
Natural Resources Wales
Comments on updated Water Framework Directive Assessment. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 746 KB
Tidal Lagoon (Swansea Bay) Plc
Updated CEMP (clean version) submitted for Deadline IV of 7 October 2014
Other
Maint: 14 KB
Pontardawe and Swansea Angling Society Ltd
Submission regarding protective provision for fishery owners submitted for Deadline IV of 7 October 2014.
Other
Maint: 4 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan: Sheet 2 of 9. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 58 KB
Rhossili Working Group
Written submission of oral case, 16 September 2014 Issue Specific Hearing - Agenda item 6.4: Porpoises and HRA - submitted for Deadline IV of 7 October 2014.
Other
Maint: 20 KB
Pontardawe and Swansea Angling Society Ltd
Comments on the updated WFD assessment submitted for Deadline IV of 7 October 2014.
Other
Maint: 288 KB
Tidal Lagoon (Swansea Bay) Plc
Cover letter and index of submissions submitted for Deadline IV of 7 October 2014
Other
Maint: 22 KB
Wildfowl and Wetlands Trust
Comments on additional information provided by the Applicant submitted for Deadline IV of 7 October 2014
Other
Maint: 167 KB
Tidal Lagoon (Swansea Bay) Plc
TLSB commentary on Panel's note of information proposed by interested parties. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 812 KB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan - Marine Works, Seawall Section: Sheet 2. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 190 KB
Swansea Environmental Forum
Written representation submitted for Deadline IV of 7 October 2014
Other
Maint: 14 KB
Pontardawe and Swansea Angling Society Ltd
Response to TLSB Deadline 3 comments on PASAS Deadline 2 submissions submitted for Deadline IV of 7 October 2014.
Other
Maint: 23 KB
Pontardawe and Swansea Angling Society Ltd
Comments on the updated AEMP submitted for Deadline IV of 7 October 2014.
Other
Maint: 8 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Water Framework Directive Assessment submitted for Deadline IV of 7 October 2014
Other
Maint: 804 KB
Tidal Lagoon (Swansea Bay) Plc
Updated Planning Drawing - Marine Works, Sluice House: Typical Section. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 4 MB
Swansea City and County
Response to Panel's note submitted for Deadline IV of 7 October 2014
Other
Maint: 2 MB
Tidal Lagoon (Swansea Bay) Plc
Note on EIA effect(s) of realignment of Project access road submitted for Deadline IV of 7 October 2014.
Other
Maint: 39 KB
Tidal Lagoon (Swansea Bay) Plc
Note clarifying any necessary discounting in job totals in respect of the turbine assembly plant and concrete batching plant submitted for Deadline IV of 7 October 2014.
Other
Maint: 6 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan: Sheet 1 of 9. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 218 KB
Tidal Lagoon (Swansea Bay) Plc
Tabular note in respect of consent status of measures contained in the AEMP, and examples of comparable plans submitted for Deadline IV of 7 October 2014.
Other
Maint: 70 KB
Fulcrum Pipelines Ltd
Comments on scoping report. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 593 KB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan - Marine Works Typical Sections. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan - Marine Works, Seawall Section Sheet 3. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 108 KB
Dan Morrissey (UK) Limited � Withdrawn
Written representation submitted for Deadline IV of 7 October 2014.
Other
Maint: 59 KB
Carmarthenshire County Council
Comments on additional information. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 8 MB
Tidal lagoon (Swansea Bay) Plc
Written summary of TLSB's oral submissions made a issue specific hearing held 16th, 17th, 18th and 23rd september 2014 and relevant answers. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 285 KB
Tidal Lagoon (Swansea Bay) Plc
Note clarifying jobs figures in paragraph 22.5.3.16 of the ES submitted for Deadline IV of 7 October 2014.
Other
Maint: 506 KB
Natural Resources Wales
Written summary of oral submissions made at issue specific hearings. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 296 KB
Tidal Lagoon (Swansea Bay) Plc
Paper of protective provisions to be included in the draft DCO submitted for Deadline IV of 7 October 2014.
Other
Maint: 734 KB
Tidal Lagoon (Swansea Bay) Plc
Examples of precedents in relation to derogations from the WFD submitted for Deadline IV of 7 October 2014.
Other
Maint: 1 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan - Marine Works, Seawall Section: Sheet 1. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 5 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan: Sheet 3 of 9. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 425 KB
Tidal Lagoon (Swansea Bay) Plc
Updated piling plan submitted for Deadline IV of 7 October 2014.
Other
Maint: 248 KB
Fieldfisher ar ran National Grid Electricity Transmission Plc
Updated on Protective Provisions negotiations and notification of non attendance at 30 September hearing. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 245 KB
Tidal Lagoon (Swansea Bay) Plc
Updated OEMP (clean version) submitted for Deadline IV of 7 October 2014
Other
Maint: 1 MB
Doug Probert
Non Interested Party - Written submission for Deadline IV of 7 October 2014. Submission accepted by the ExA.
Other
Maint: 7 MB
Tidal Lagoon (Swansea Bay) Plc
Updated masterplan key plan submitted for Deadline IV of 7 October 2014
Other
Maint: 99 KB
Welsh Government
Response to additional information submitted for Deadline IV of 7 October 2014.
Other
Maint: 82 KB
Neath Port Talbot County Borough Council
Written representation submitted for Deadline IV of 7 October 2014.
Other
Maint: 50 KB
Porthcawl Environment Trust
Written representation submitted for Deadline IV of 7 October 2014.
Other
Maint: 3 MB
Swansea Fishermen Group Members
Withdrawal of objection by individual members. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 3 MB
Associated British Ports
Summary of oral submission made at Issue Specific Hearings. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 106 KB
Tidal Lagoon (Swansea Bay) Plc
Updated statement in respect of coastal processes submitted for Deadline IV of 7 October 2014.
Other
Maint: 16 KB
Tidal Lagoon (Swansea Bay) Plc
Updated list of other consents required (clean version) submitted for Deadline IV of 7 October 2014
Other
Maint: 3 MB
Tidal Lagoon (Swansea Bay) Plc
Note to support amendment to DCO to address flood risk submitted for Deadline IV of 7 October 2014.
Other
Maint: 243 KB
Tidal Lagoon (Swansea Bay) Plc
Updated Planning Drawings - Marine Works, 7m Turbine House: Typical Section. Submitted for Deadline IV of 7 OCtober 2014.
Other
Maint: 1 MB
Royal Mail
Written Representation submitted for Deadline IV of 7 October 2014
Other
Maint: 59 KB
Tidal Lagoon (Swansea Bay) Plc
Updated schedule of plans submitted for Deadline IV of 7 October 2014
Other
Maint: 3 MB
Associated British Ports
Letter to Tidal Lagoon (Swansea Bay) plc - Comment on draft Protective Provisions and revised articles.
Other
Maint: 100 KB
Tidal Lagoon (Swansea Bay) Plc
Note on EIA effect(s) of alternative proposed route into Baglan substation submitted for Deadline IV of 7 October 2014.
Other
Maint: 535 KB
Tidal Lagoon (Swansea Bay) Plc
Updated Draft Development Consent Order (track changed version) submitted for Deadline IV of 7 October 2014
Other
Maint: 248 KB
Tidal Lagoon (Swansea Bay) Plc
Updated OEMP (track changed version) submitted for Deadline IV of 7 October 2014
Other
Maint: 3 MB
Natural Resources Wales
Written representation submitted for Deadline IV of 7 October 2014.
Other
Maint: 13 MB
Tidal Lagoon (Swansea Bay) Plc
Updated AEMP submitted for Deadline IV of 7 October 2014
Other
Maint: 846 KB
Tidal Lagoon (Swansea Bay) Plc
Note addressing Swansea Bay SINC submitted for Deadline IV of 7 October 2014.
Other
Maint: 53 KB
Welsh Government
Submission in relation to Issue Specific Hearings commencing 16 September 2014.
Other
Maint: 4 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan: Sheet 7 of 9. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 809 KB
Tidal Lagoon (Swansea Bay) Plc
Updated CEMP (track changed version) submitted for Deadline IV of 7 October 2014
Other
Maint: 4 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan: Sheet 9 of 9. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 34 KB
Tidal Lagoon (Swansea Bay) Plc
Note in respect of secured DCO works in other/comparable DCOs submitted for Deadline IV of 7 October 2014.
Other
Maint: 205 KB
Trinity House
Written representation submitted for Deadline IV of 7 October 2014.
Other
Maint: 4 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Works Plan - Marine Works, Seawall Section: Sheet 4. Submitted for Deadline IV of 7 Octber 2014.
Other
Maint: 472 KB
Tidal Lagoon (Swansea Bay) Plc
Updated Planning Drawings - Marine Works, Dredging: General Arrangement. Submitted for Deadline IV of 7 OCtober 2014.
Other
Maint: 57 KB
Baglan Operations Limited, Baglan Pipeline Limited and Baglan Generating Limited
Summary of oral case made at 30 September 2014 hearing. Submitted for Deadline IV of October 2014.
Other
Maint: 111 KB
Rhossili Working Group
Comments on additional documentation submitted in July and August 2014 submitted for Deadline IV of 7 October 2014
Other
Maint: 23 MB
Geldards LLP ar ran Baglan Bay Company Limited
First Master Definitions Agreement referred to in Written representation published 10 July 2014. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 749 KB
Swansea Fishermen's Group
Withdrawal of objection. Submitted for Deadline IV of 7 October 2014.
Other
Maint: 415 KB
Tidal Lagoon (Swansea Bay) Plc
Updated Draft Development Consent Order (clean version) submitted for Deadline IV of 7 October 2014
Other
Maint: 116 KB
Fish Legal
Post hearing comments submitted for Deadline IV of 7 October 2014
Other
Maint: 86 KB
St Modwen Properties VIII Sarl Ltd
Submission in relation to Issue Specific Hearings commencing 16 September 2014.
Other
Maint: 86 KB
St Modwen Properties Plc
Submission in relation to Issue Specific Hearings commencing 16 September 2014.
Other
Maint: 86 KB
St Modwen Developments Ltd
Submission in relation to Issue Specific Hearings commencing 16 September 2014.
Other
Maint: 86 KB
Swansea University
Submission in relation to Issue Specific Hearings commencing 16 September 2014.
Other
Maint: 159 KB
Welsh Government
Further written response submitted for Deadline III of 5 August 2014 (Late submission)
Other
Maint: 181 KB
Tidal Lagoon (Swansea Bay) Plc
Draft DCOb - Tidal Lagoon Swansea Bay, City and County of Swansea Council, Neath Port Talbot County Borough Council - Submitted on 1 September 2014
Other
Maint: 780 KB
Tidal Lagoon (Swansea Bay) Plc
Response to Natural Resources Wales advice on updated FCA - Submitted on 1 September 2014
Other
Maint: 243 KB
Natural Resources Wales
Further written response submitted for Deadline III of 5 August 2014 (Late submission)
Other
Maint: 120 KB
Pontardawe and Swansea Angling Society Ltd
Further written response submitted for Deadline III of 5 August 2014 (Late submission)
Other
Maint: 6 MB
Ian Wisby ar ran Swansea Fishermen WITHDRAWN
Written response submitted for Deadline III of 5 August 2014, the publication of the representation was delayed to enable documents to be submitted by post (Late Submission).
Other
Maint: 112 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix 4.2 Outline Operation Environmental Management Plan (clean version). Submitted for Deadline III of 5 August 2014.
Other
Maint: 664 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix 4.1 Construction Environmental Management Plan (clean version). Submitted for Deadline III of 5 August 2014.
Other
Maint: 184 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix 4.2 Outline Operation Environmental Management Plan (changes shown). Submitted for Deadline III of 5 August 2014.
Other
Maint: 3 MB
Tidal lagoon (Swansea Bay) Plc
Shadow HRA relating to Cetaceans and Pinnipeds. Submitted for Deadline III of 5 August 2014.
Other
Maint: 934 KB
Tidal Lagoon (Swansea Bay) Plc
Appendix 4.1 Construction Environmental Management Plan (changes shown). Submitted for Deadline III of 5 August 2014.
Other
Maint: 80 KB
St Modwen Developments Limited, St Modwen Properties Plc and St Modwen Properties VIII Sarl
Written response submitted for Deadline III of 5 August 2014.
Other
Maint: 87 KB
Tidal Lagoon (Swansea Bay) Plc
Applicant's cover letter relating to documents submitted for Deadline III of 5 August 2014.
Other
Maint: 80 KB
Swansea University
Written response submitted for Deadline III of 5 August 2014.
Other
Maint: 190 KB
Swansea Environmental Forum
Written response submitted for Deadline III of 5 August 2014.
Other
Maint: 30 KB
Associated British Ports
Written response submitted for Deadline III of 5 August 2014
Other
Maint: 2 MB
Neath Port Talbot County Borough Council
Written response submitted for Deadline III of 5 August 2014
Other
Maint: 58 KB
Pontardawe and Swansea Angling Society Ltd
Written response submitted for Deadline III of 5 August 2014
Other
Maint: 60 KB
Tidal Lagoon (Swansea Bay) Plc
Applicant's index of documents submitted for Deadline III of 5 August 2014.
Other
Maint: 5 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Water Framework Directive Assessment (doc ref 8.3). Submitted for Deadline III of 5 August 2014.
Other
Maint: 8 MB
Tidal Lagoon (Swansea Bay) Plc
Updated Adaptive Environmental Management Plan (AEMP) (doc ref 6.2 App 23.1). Submitted for Deadline III of 5 August 2014.
Other
Maint: 672 KB
Royal Society for the Protection of Birds
Written response submitted for Deadline III of 5 August 2014.
Other
Maint: 11 MB
City and County of Swansea Council
Written response submitted for Deadline III of 5 August 2014.
Other
Maint: 100 KB
Fish Legal
Written response submitted for Deadline III of 5 August 2014.
Other
Maint: 1 MB
Natural Resources Wales
Written response submitted for Deadline III of 5 August 2014
Gellir hidlo dogfennau yn ôl eu dyddiad cyhoeddi neu yn ôl y dyddiad cau sy’n berthnasol iddynt. Cyhoeddir dyddiadau cau yn yr amserlen ar ddechrau’r archwiliad a gellir eu gweld ar dab amserlen yr archwiliad.